Проектно-Конструкторское Бюро Главстроймеханизации
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Проектно-Конструкторское Бюро ГлавстроймеханизацииfiledCriticalПроектно-Конструкторское Бюро Главстроймеханизации
Priority to SU1892203ApriorityCriticalpatent/SU505766A1/en
Application grantedgrantedCritical
Publication of SU505766A1publicationCriticalpatent/SU505766A1/en