SU48443A1 - The method of delivery of materials and haulage rocks at the construction of tunnels - Google Patents

The method of delivery of materials and haulage rocks at the construction of tunnels

Info

Publication number
SU48443A1
SU48443A1 SU135164A SU135164A SU48443A1 SU 48443 A1 SU48443 A1 SU 48443A1 SU 135164 A SU135164 A SU 135164A SU 135164 A SU135164 A SU 135164A SU 48443 A1 SU48443 A1 SU 48443A1
Authority
SU
USSR - Soviet Union
Prior art keywords
materials
delivery
tunnels
haulage
construction
Prior art date
Application number
SU135164A
Other languages
Russian (ru)
Inventor
М.А. Брайнин
Original Assignee
М.А. Брайнин
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by М.А. Брайнин filed Critical М.А. Брайнин
Priority to SU135164A priority Critical patent/SU48443A1/en
Application granted granted Critical
Publication of SU48443A1 publication Critical patent/SU48443A1/en

Links

Landscapes

  • Warehouses Or Storage Devices (AREA)

Description

К авторскому свидетельству М. А. Брайнина, за вленному 22 сент бр  1933 года (спр. о перв. № 135164).To the author's testimony of M. A. Brainin, dated September 22, 1933 (cf. first number 135164).

о выдаче авторского свидетельства опубликовано 31 августа 1936 года.on issuing copyright certificate published August 31, 1936.

Предлагаемый способ охватывает цикл транспортных операций при сооружении тоннелей, причем дл  достижени  наиболее рациональной цикличности транспортных операций предлагаетс  определенный пор док разработки тоннел .The proposed method covers the cycle of transport operations in the construction of tunnels, and a certain order of tunnel design is proposed to achieve the most rational cyclicality of transport operations.

Чертеж изображает поперечный разрез разрабатываемого тоннел .The drawing shows a cross-section of the developed tunnel.

По предлагаемому способу нижн   штольн  / ведетс  впереди верхней 2, име  сечение, достаточное дл  габарита двухпутной дороги. При проходке нижней штольни /, через определенные промежутки разрабатываютс  вверх фурнели 3. Таким образом верхн   штольн  2 щ мере своей разработки встречает готовые фурнели 3, сообшаюшие ее с нижней штольней. Кроме описанного соединени  рабочих штолен фурнел ми , они от места до места соедин ютс  вертикальными шахтами 4 с соответствующими штреками . Вертикальные шахты оборудуютс  опускным устройством дл  вагонеток б, каковое имеет вид клети 5, снабженной противовесом 7.According to the proposed method, the lower gallery / leads in front of the upper 2, having a section sufficient for the size of the double-track road. When the lower gallery / is being drilled, furniture is developed upwards at certain intervals. Thus, the upper gallery 2, as far as its development is concerned, meets the finished furniture 3, communicating it with the lower gallery. In addition to the described connection of working tunnels with furniture, they are connected from place to place by vertical shafts 4 with corresponding drifts. The vertical shafts are equipped with a lowering device for trolleys b, which has the form of a cage 5 provided with a counterweight 7.

Предлагаемый транспортный цикл по доставке материалов в тоннель и откатке породы из него состоит в следующем .The proposed transport cycle for the delivery of materials into the tunnel and hauling rock from it is as follows.

Откатка породы из тоннел  происходит по одному а из двух путей нижней штольни /, принимающему как породу, вырабатываемую в этой штольне, так и породу, вырабатываемую в верхней штольне 2 и непосредственно сбрасываемую вниз через фурнели 3.The haulage of rock from the tunnel takes place one at a time from the two paths of the lower adit /, which receives both the rock produced in this adit and the rock produced in the upper adit 2 and is directly discharged down through the furniture 3.

Доставка материалов внутрь нижней штольни происходит по второму пути б, здесь имеющемус , а внутрь верхней штольни по одному верхнему пути в, причем переходы на уровни упом нутых путей осуществл ютс  вне тоннел .The delivery of materials to the inside of the lower adit takes place along the second path b, which is here, and inside the upper adit one of the upper path c, and the transitions to the levels of the said paths take place outside the tunnel.

Порожн к после разгрузки материалов подаетс  под погрузку породой на путь а с пути б нижней штольни-через соединительные стрелки или поворотные круги, а с верхнего пути 6 после опорожнени -спуска сь в клет х 5, помещающихс  в боковых вертикальных шахтах 4.After unloading the materials, emptying the material is supplied for loading the rock onto the path a and from the bottom b of the lower gallery through connecting arrows or turntables, and from the upper path 6 after emptying descending into the cages 5 placed in the side vertical shafts 4.

Таким образом, как видно, при предложенной операции избегаетс  встречное движение транспорта внутри тоннельной разработки и кажда  лини  имеющихс  там путей приобретает специальное назначение.Thus, as can be seen, in the proposed operation, the oncoming traffic within the tunnel development is avoided and each line of the existing paths acquires a special purpose.

Предмет изобретени .The subject matter of the invention.

Способ доставки материалов и откатки породы при сооружении тоннелей и тому подобных сооружений двум  расположенными одна над другой штоль« ии , отличающийс  тем, что, с целью осуществлени  кругового движени  вагонеток , они передаютс  под погрузку аородой на путь а: в нижней штольне- с порожн кового пути б, а из верхнейThe method of delivery of materials and haulage of rock in the construction of tunnels and similar structures are two located one above the other gateway, characterized in that, in order to realize the circular movement of the carriages, they are transmitted by loading by the arid onto route a: in the lower tunnel ways b, and from the top

штольни-с пути дл  доставки материалов в, после опорожнени , при помощи опускных приспособлений, соедин ющих верхнюю и нижнюю штольни между собой.adits-of-way for delivery of materials to, after emptying, with the help of lowering devices connecting the upper and lower adits to each other.

SU135164A 1933-09-22 1933-09-22 The method of delivery of materials and haulage rocks at the construction of tunnels SU48443A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU135164A SU48443A1 (en) 1933-09-22 1933-09-22 The method of delivery of materials and haulage rocks at the construction of tunnels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU135164A SU48443A1 (en) 1933-09-22 1933-09-22 The method of delivery of materials and haulage rocks at the construction of tunnels

Publications (1)

Publication Number Publication Date
SU48443A1 true SU48443A1 (en) 1936-08-31

Family

ID=48361393

Family Applications (1)

Application Number Title Priority Date Filing Date
SU135164A SU48443A1 (en) 1933-09-22 1933-09-22 The method of delivery of materials and haulage rocks at the construction of tunnels

Country Status (1)

Country Link
SU (1) SU48443A1 (en)

Similar Documents

Publication Publication Date Title
CN206328646U (en) A kind of novel rail two-wire track girder
CN203452643U (en) Anchor rod drill carriage for coal mines
SU48443A1 (en) The method of delivery of materials and haulage rocks at the construction of tunnels
CN201934131U (en) Horizontal transportation system for shield tunnel
CN209385176U (en) A kind of mine rail route layout optimization system
CN205591929U (en) A shield structure construction storage battery car conveyor system for among long distance heavy grade shield tunnel
CN203962034U (en) A kind of rock gangway is reprinted belt conveyor by portable buffering
US709692A (en) Overhead tramway.
US1817343A (en) Material handling plant
CN210087380U (en) Conveyer for harrow installation
US796498A (en) Art of mining coal.
US2091505A (en) Conveyer boom
US1999931A (en) Coextensive room system with mechanical conveyers
US1883200A (en) Shoveling machine
CN106121700A (en) The improved structure of a kind of advance timbering and shifting frame method thereof
CN116066170A (en) Mine track auxiliary transportation roadway device and application method thereof
CN208604430U (en) A kind of mine track stone device for discharging
US1516258A (en) Water-supply apparatus for railways
CN104279003B (en) Down-hole hydraulic prop Quick transport device and the way of transportation completed thereof
SU448296A1 (en) Mechanized roof supports
BE779480A (en) TRACK SUSPENDED AT MONORAIL, SPECIFICALLY INTENDED FOR TRANSPORTATION IN MINE GALLERIES
SU985305A1 (en) Mine roof support ceiling
SU22655A1 (en) Device for tipping double skips
SU382823A1 (en) TRIPLE LOADING POINT
SU373433A1 (en)