SU47739A1 - Device for automatic shutdown of outgoing feeders at power plants and substations when one of the generators or feed feeders is turned off - Google Patents

Device for automatic shutdown of outgoing feeders at power plants and substations when one of the generators or feed feeders is turned off

Info

Publication number
SU47739A1
SU47739A1 SU177192A SU177192A SU47739A1 SU 47739 A1 SU47739 A1 SU 47739A1 SU 177192 A SU177192 A SU 177192A SU 177192 A SU177192 A SU 177192A SU 47739 A1 SU47739 A1 SU 47739A1
Authority
SU
USSR - Soviet Union
Prior art keywords
feeders
relay
generators
time
turned
Prior art date
Application number
SU177192A
Other languages
Russian (ru)
Inventor
А.И. Трояновский
новский А.И. Тро
Original Assignee
А.И. Трояновский
новский А.И. Тро
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by А.И. Трояновский, новский А.И. Тро filed Critical А.И. Трояновский
Priority to SU177192A priority Critical patent/SU47739A1/en
Application granted granted Critical
Publication of SU47739A1 publication Critical patent/SU47739A1/en

Links

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Description

В Практике эксплоатации электрических станций при авари х на них (выход из стро  турбины, генератора, котла, собственных нужд и т. п) необходимо быстро разгрузить станцию, так как в цротивном случае авари  может усугубитьс  (перегрузка котлов и посадка давлени , перегрузка генераторов и их отключени  и т, п.).In the practice of operating electric power stations in case of accidents (turbine, generator, boiler, own needs, etc.) failing, it is necessary to quickly unload the station, as in the opposite case the accident can be aggravated (overload of boilers and landing pressure, overload of generators and turn them off and t, p.).

эта производи.1-с  обычно дежурным персоналом щита управлени  путем отклонени  отход щих фидеров в заранее заданной очередности (согласно так называемому аварийному графику отключений АТО). This production. 1-s is usually the duty personnel of the control panel by rejecting the outgoing feeders in a predetermined sequence (according to the so-called emergency schedule for disconnection of the ATO).

Однако, персонал щита зачастую не успевает своевременно произвести разгрузку (разгрузку необходимо производить в чрезвычайно краткий срок, ;доход щий до 5-7 секунд при аварии на турбогенераторе), что приводит к развитию аварии, значительно замедл ет восстановление нормального режима работы станции и увеличивает аварийный недоотпуск энергии потребител м.However, the shield personnel often do not have time to unload in time (unloading must be done in an extremely short period, up to 5-7 seconds in a turbine generator accident), which leads to the development of the accident, significantly slows down the restoration of the station’s normal operation and increases the emergency undersupply of consumer energy

Кроме того персонал щита при отключени х иногда нарушает очередность отключений или производит их слиш (262)In addition, shield personnel during outages sometimes interrupt the sequence of outages or produce them too much (262)

ком много, что наносит народному хох йству значительный ущерб.there is a lot of damage to the national people.

Предлагаемое устройство дл  автоматического выключени  отход щих фидеров при выключении одного из генераторов или питающих фидеров, замен   персонал щита, производит разгрузку станции лишь в необходимых размерах в заранее заданной очередности , за краткое врем , не допуска  развити  аварии из-за перегрузки станции .The proposed device for automatic shutdown of outgoing feeders when one of the generators or feed feeders is switched off, the switchboard personnel replace, unloads the station only in the required sizes in a predetermined order, for a short time, to prevent the development of the accident due to the station overload.

Устройства, подобные предлагаемому, вообще давно известны; новизна предлагаемого устройства состоит в том, что в нем, с целью поочередного выключени  отход щих фидеров в определенной последовательности, к контактам реле времени, управл ющего цепью выключени  каждого данного фидера, присоединено реле времени следующего по очередности выключени  фидера ,Devices like the one proposed are generally well known; The novelty of the proposed device lies in the fact that, in order to alternately turn off the outgoing feeders in a certain sequence, to the contacts of the time relay controlling the off circuit of each given feeder, a time relay of the next next turn off the feeder is connected,

На чертеже фиг. 1 изображает электрическую схему предлагаемого устройства , и фиг. 2 - схему коммутатора, примен емого в устройстве дл  уставевлени  очередности выключени  отход щих фидеров.In FIG. 1 shows the electric circuit of the device proposed, and FIG. 2 is a switch diagram used in the device for setting the turn-off sequence of the outgoing feeders.

При выходе из стро  турбины (сработгГл автомат безопасности) или генератора (отключен релейной защитой) данный турбогенератор сбрасывает с себ  всю нагрузку, котора . передаетс  на оставшиес  генераторы, нерегружа  их.When a turbine (a safety automatic device) or a generator (disconnected by relay protection) fails, this turbo generator releases all the load, which. transmits to the remaining generators without having to unload them.

При этом начинают работать мгновенные максимальные реле генераторов.At the same time, instantaneous maximum generator relays start working.

Отвод от максималь гых мгновенных реле беретс  к зажимам 1 промежуточных реле 2 (число которых выбираетс  по числу генераторов). При этом соответствующие промежуточные реле срабатывают , подава  плюс на реле времени 3.The tap from the maximum instantaneous relay is taken to the terminals 1 of the intermediate relay 2 (the number of which is selected according to the number of generators). In this case, the corresponding intermediate relays are triggered by applying a plus to time relay 3.

Реле времени 3 по исходе своей выдержки времени срабатывают; при этом подаетс  плюс: а) на зажим 4 через сериесный блинкер 5, который включит аварийную желтую ламау 6 и сирену ; б) па реле вpeмe и 8. Реле времени 8, срабатыва , подает плюс на зажим 10 (через блинкер 9) и на реле времени П. Реле времени П и 12 действуют идентично реле 8.Timer 3 triggers at the end of its time delay; at the same time, a plus is supplied: a) to clip 4 through a serial blinker 5, which will turn on the emergency yellow lama 6 and the siren; b) pa relay time and 8. Time relay 8, triggered, gives plus to terminal 10 (through blinker 9) and time relay P. Time relays P and 12 act identically to relay 8.

Зажимы 4, 10, 15, 16 подключаютс  к одноименным зажимам коммутатора (фиг. 2).Clips 4, 10, 15, 16 are connected to the switch clips of the same name (Fig. 2).

Коммутатор этот собираетс  по принципу щвейцарского коммутатора: горизонтальные шинки подключены к зажимам 4, 10, 15, 16, вертикальные, изолированные от них, шинки подключены к контактам 17, от которых подаетс  плюс к цеп м выключени  соответствующих фидеров.This switchboard is assembled according to the principle of the Swiss switchboard: horizontal busbars are connected to terminals 4, 10, 15, 16, vertical, insulated from them, busbars are connected to contacts 17, from which they are fed to the switch-off circuit of the corresponding feeders.

В местах пересечени  вертикальных и горизонтальных шинок на этих шинках устроены контактные гнезда 27; вставив в эти гнезда штепсель, можно от любого из зажимов 4, 10,15, 16 подать плюс к цепи выключени  любого из фидеров (набор штепселей производитс  при приеме смены дежурным персоналом щита согласно аварийному графику отключений, заданному диспетчерской частью).In the places of intersection of vertical and horizontal taverns on these taverns, contact sockets 27 are arranged; By inserting a plug into these sockets, it is possible to apply from any of the clamps 4, 10,15, 16 plus to the shutdown circuit of any feeder (a set of plugs is made when the switch personnel receive the change according to the emergency shutdown schedule specified by the control room).

Таким образом, при срабатывании максимальных реле генераторов производитс  поочередно отключение фидеров до тех пор, пока токи на генераторах не окажутс  ниже приведенных токов трогани  максимальных реле;Thus, when the maximum generator relays are triggered, the feeders are disconnected alternately until the currents on the generators are below the specified currents from the maximum relays;

тогда контак:ы максимальных реле размыкаютс ; при это.м вс  схема приводитс  в нормальное положение.then contacts: s maximum relays open; in this case, the entire scheme is brought to its normal position.

Так как при этом токи на генераторах все же будут выше номинальных величин, персоналу щита управлени  придетс  подт нуть их до номинала, но генераторы будут сохранены в строю.Since in this case the currents on the generators will still be higher than the nominal values, the control panel personnel will have to push them up to the nominal value, but the generators will be kept in service.

Устройство будет действовать так-ке в том случае, если в сети будет короткое и оно не отключитс  защитой. В этом случае устройство поочередш отключит все отход щие фидеры, причем отключение будет продолжатьс  до тех пор, пока не отключитс  поврежденный фидер. В этом случае генераторы все же будут сохранены в строю.The device will act as if the network is short and it is not turned off by protection. In this case, the device will alternately turn off all outgoing feeders, and the shutdown will continue until the damaged feeder is turned off. In this case, the generators will still be saved in the ranks.

Выбор выдержек времен г реле 3, 8, 11, 12 производитс  из следующих соображений . При любом коротком замыкании в сети максимальные мгновенные реле генераторов срабатывают; чтобы при этом не включалось устройство, выдержка времени реле 3 выбираетс  на 0,5-0,6 секунд большей, чем выдержка на реле отход щих фидеров.The choice of time delay r relays 3, 8, 11, 12 is made of the following considerations. In case of any short circuit in the network, the maximum instantaneous generator relays operate; so that the device does not turn on, the delay time of the relay 3 is selected 0.5-0.6 seconds longer than the delay on the relay of the outgoing feeders.

Дл  того же, чтобы дости ь очередности отключени  фидеров, выдержка времени реле 8, II, 12 выбираетс  пор дка 0,5 сек.For the same, to reach the order of disconnection of the feeders, the time delay of the relay 8, II, 12 is selected in the order of 0.5 seconds.

Количество реле времени выб:1раетс  по достижимому числу ступеней вре мени. Если же число фидеров, подлежащих отключению устройством, больше числа реле времени (а также в тех случа х, когда необходимо одновременное отключение не одиночного фидера, а целой группы), контакты 4, 10, 15, 16 подключаютс  не к коммутатору, а к многор дным промежуточным реле, контакты которых уже подвод тс  к коммутатору .The number of time relays is selected: 1 time according to the number of time steps that can be reached. If the number of feeders to be disconnected by the device is greater than the number of time relays (and also in those cases when it is necessary to disconnect not a single feeder at the same time, but the whole group), contacts 4, 10, 15, 16 are connected not to the switch, but to a single intermediate relay whose contacts are already being supplied to the switch.

Дл  разгрузки станции при авзрии в котельной, в машинном зале и т. д. вводитс  аварийна  кнопка 18, монти руема  на пульте. При нажатии кнопки 18 пластина 19 замыкает контакты 20 и 21; при этом подаетс  плюс на зажим 4 и на реле времени 8. Таким образом даютс  звуковой и световой сигналы, сразу отключаетс  один фидер, а затем с промежутками 0,5 сек. отключаютс  поочередно остальные ф идеры до тех пор, пока не отпуст т кнопку 18. .-In order to unload the station at the emergency room in the boiler room, in the machine room, etc., an emergency button 18 is inserted, mounted on the console. When you press the button 18 plate 19 closes the contacts 20 and 21; in this case, a plus is applied to terminal 4 and time relay 8. Thus, an acoustic and light signal is given, one feeder is turned off immediately, and then at intervals of 0.5 seconds. the remaining ids are turned off alternately until the button 18 is released.

Отпущенна  кнопка отт гиваетс  пружиной на свое место, и устройство, отключив нужное количество фидеров, приводитс  в нормальное положение. Введение кнопки 18, помимо устранени  ошибок персонала при обычных отключени х, дает еще следующее преимущество: можно одновременно воздействовать на устройство и на кнопки сервомоторов оставщихс  турбогенераторов .The released button is retracted by a spring to its place, and the device, having turned off the necessary number of feeders, is brought to its normal position. The introduction of button 18, in addition to eliminating personnel errors during normal outages, also provides the following advantage: it is possible to simultaneously act on the device and on the buttons of the servomotors of the remaining turbine generators.

Выполненное таким образом устройство удовлетвор ет требовани м эксплоатации , однако, при отключении любого генератора любой его- защитой разгрузка остающихс  генераторов начнетс  лишь по исходе выдержки времени реле 3.The device made in this way satisfies the requirements of exploitation, however, if any generator is disconnected by any of its protection, the unloading of the remaining generators will begin only after the time delay of the relay 3.

Чтобы это усгранить, вводитс  релейное устройство, состо щее из элементов 22, 23, 24, 25, 26. Действует это релейное устройство следующим обрлзом. При выключении любого генератора любой защитой подаетс  от сработавших реле плюс на зажимы 24 промежуточных рел 25 (часть реле 25 питаетс  непосредственно от мгновенных защит- диференциальной, земл ной и т. п.; часть же - от реле времени максимальных защит), число которых выбираетс  по числу защит генераторов; при этом реле 25 подают плюс через размыкающие контакты реле .времени 26 на промежуточное реле 23, которое, сработав, самозаблокируетс  (это необходимо потому , ч го мгновенные реле, сработав, подают лишь импульс тока, а затем возвращаютс  в нормальное положение). Одновременно реле 23, сработав, подает минус к соленоиду 22, вт гивающему стержень аварийной кнопки 18. Плюс подаетс  на этот соленоид при срабатывании мгновенных максимальных реле генераторов реле 2.In order to mitigate this, a relay device is introduced, consisting of elements 22, 23, 24, 25, 26. This relay device operates as follows. When any generator is turned off, any protection is supplied from triggered relays to intermediate 24 clamps 25 (part of relay 25 is powered directly from instantaneous differential protection, earth, etc., some also from maximum protection relays), the number of which is selected by the number of generators protection; the relay 25 is then fed plus through the opening contacts of the relay. Time 26 to the intermediate relay 23, which, when triggered, self-blocks (this is necessary because the instantaneous relays, triggered, supply only a current pulse, and then return to the normal position). At the same time, the relay 23, having triggered, delivers a minus to the solenoid 22, which draws in the emergency button 18 pin. Plus, it is applied to this solenoid when the instantaneous maximum relay generators of the relay 2 are triggered.

Таким образом, если любой генератор отключитс  любой защитой и при этом остальные генераторы будут перегружены, мгновенно включитс  предлагаемое устройство, которое будет действовать до тех пор, покаThus, if any generator is turned off by any protection and the other generators are overloaded, the proposed device will instantly turn on, which will remain in effect until

длитс  перегрузка генераторов; если же при отключении генератора остальные свободно примут его нагрузку и не перегруз тс , реле времени 26, которое начинает действовать при работе реле 25, сработав, приведет схему в нормальное положение.Duration of generator overload; if, when the generator is turned off, the others will freely accept its load and will not overload, time relay 26, which starts to operate when relay 25 operates, will activate the circuit in the normal position.

Выдержка времени реле 26 выбираетс  равной сумме выдержек времени реле 8, 11, 12.The time delay of the relay 26 is chosen equal to the sum of the time delay of the relay 8, 11, 12.

Дополнительное релейное устройство обладает одним дефектом: цри отключении любого генератора любой его защитой и одновременно коротком в сети, предлагаемое устройство включитс  и произведет поочередное отключение фидеров, вне зависимости от того, необходимо ли это дл  разгрузки станции.The additional relay device has one defect: if any generator disconnects with any protection and at the same time short in the network, the proposed device will turn on and alternately disconnect the feeders, regardless of whether this is necessary for unloading the station.

Однако, веро тность совпадени  таких двух аварий во времени настолько ничтожна, что, по мнению автора, ею можно вполне пренебречь (особенно принима  во внимание, что заменой реле 23, 26 одни.м комбинированным реле с мгновенно прилипающими контактами и одними только размыкающими контактами времени можно довести врем  совпадени  до 0,5 сек.).However, the probability of coincidence of such two accidents in time is so insignificant that, in the author's opinion, it can be completely neglected (especially taking into account that replacing relay 23, 26 with one m. A combined relay with instantly sticking contacts and only opening time contacts it is possible to bring the coincidence time to 0.5 seconds.).

Устройство может быть также применено на лини х св зи между станци ми и на подстанци х (при питании их несколькими фидерами или при на .1ИЧИИ нескольких силовых трансформаторов ), причем на последних устройство может вполне заменить щитового.The device can also be used on communication lines between stations and at substations (when they are powered by several feeders or if several power transformers are installed), and in the latter the device can completely replace the switchboard.

Предмет изобретени .The subject matter of the invention.

Устройство дл  автоматического выключени  отход щих фидеров на электрических станци х и подстанци х при выключении одного из генераторов или питающих фидеров, отличающеес  тем, что, с целью поочередного выключени  отход щих фидеров в определенной последовательности, к контактам реле времени, управл ющего цепью выключени  каждого данного фидера, присоединено реле времени следующего по очередности выключени  фидера. Е авторскому свидетельству А. И. № 47789 Тро новскоюA device for automatic shutdown of outgoing feeders at power stations and substations when one of the generators or feed feeders is turned off, characterized in that, in order to alternately turn off the outgoing feeders in a certain sequence, to the contacts of the time relay controlling the off circuit of each given feeder, connected to the time relay of the next in order to turn off the feeder. E to the author's testimony of A.I. No. 47789 by Trinity

Фиг.1.1.

Фиг.2.2.

SU177192A 1935-09-26 1935-09-26 Device for automatic shutdown of outgoing feeders at power plants and substations when one of the generators or feed feeders is turned off SU47739A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU177192A SU47739A1 (en) 1935-09-26 1935-09-26 Device for automatic shutdown of outgoing feeders at power plants and substations when one of the generators or feed feeders is turned off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU177192A SU47739A1 (en) 1935-09-26 1935-09-26 Device for automatic shutdown of outgoing feeders at power plants and substations when one of the generators or feed feeders is turned off

Publications (1)

Publication Number Publication Date
SU47739A1 true SU47739A1 (en) 1936-07-31

Family

ID=48360786

Family Applications (1)

Application Number Title Priority Date Filing Date
SU177192A SU47739A1 (en) 1935-09-26 1935-09-26 Device for automatic shutdown of outgoing feeders at power plants and substations when one of the generators or feed feeders is turned off

Country Status (1)

Country Link
SU (1) SU47739A1 (en)

Similar Documents

Publication Publication Date Title
SU47739A1 (en) Device for automatic shutdown of outgoing feeders at power plants and substations when one of the generators or feed feeders is turned off
CN110021486A (en) A kind of no-voltage trip auto recloser
US1719471A (en) Control and supervisory system
US1974978A (en) Automatic reclosing circuit breaker system
US2861222A (en) Electrical distribution system with automatic sectionalizing switch
US1919895A (en) Circuit breaker protective system
US2868996A (en) Power substitution circuit
US1863162A (en) Rectifier system
US2339025A (en) Circuit protective equipment
US2743397A (en) Remote control systems
CN205681093U (en) A kind of universal low-voltage circuit breaker automatic switching-on device
CN216793465U (en) Device for reducing excitation surge current of transformer
CN215817502U (en) Motor closing coil protection device
US2065339A (en) System of alternating current distribution
US2011666A (en) Mercury arc rectifier
US1755139A (en) Control system and apparatus
US2359079A (en) Electrical distribution system
US2401017A (en) Control system
US1619860A (en) Electrical switching apparatus
US2173673A (en) Electric distribution system
SU42187A1 (en) Device for automatic activation of backup supply feeder to substation buses
US1410538A (en) Relay system
US1945667A (en) Supervisory system
US1784639A (en) Control system
SU62200A1 (en) Device for remote switching to turn off the low-voltage feeder