SU449879A1 - The method of moving structures with two cranes - Google Patents
The method of moving structures with two cranesInfo
- Publication number
- SU449879A1 SU449879A1 SU1784371A SU1784371A SU449879A1 SU 449879 A1 SU449879 A1 SU 449879A1 SU 1784371 A SU1784371 A SU 1784371A SU 1784371 A SU1784371 A SU 1784371A SU 449879 A1 SU449879 A1 SU 449879A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- cranes
- mechanisms
- lifting
- hooks
- alternating
- Prior art date
Links
Landscapes
- Control And Safety Of Cranes (AREA)
Description
1one
Изобретение относитс к производству монтажных работ с использованием грузоподъемных кранов дл перемещени различных промышленных конструкций горизонтального и вертикального типов, весовые и габаритные параметры которых превышают паспортные характеристики одного крана.The invention relates to the production of installation work using cranes for moving various industrial structures of horizontal and vertical types, the weight and dimensions of which exceed the passport characteristics of a single crane.
Известны способы перемеш,ени конструкций двум кранами путем совместной и одновременной работы нескольких грузоподъемных и грузоповоротных механизмов каждого крана.Known methods of mixing, construction of two cranes by the joint and simultaneous operation of several lifting and handling mechanisms of each crane.
Дл повышени эффективности монтажных работ и исключени аварийных ситуаций предлагаетс неремещение конструкций после подъема их на начальную высоту одновременно крюками обоих кранов осуществл ть путем чередовани синхронной работы механизмов подъема стрел двух кранов до отклонени грузовых строп на расчетную и контролируемую величину и механизмов поворота стрел до исходного вертикального положени грузовых строп, при этом процесс перемещени конструкций производить нри стационарном положении кранов без применени вспомогательных т говых средств, а циклы чередовани синхронной работы одних и тех же механизмов обоих кранов повтор ть до установки перемещаемой конструкции в проектное положение .To increase the efficiency of installation work and eliminate emergencies, it is suggested that the structures should not be displaced to their initial height at the same time by hooks of both cranes by alternating the synchronous operation of the boom lifting mechanisms of the two cranes before deflecting the cargo lines to the calculated vertical position cargo slings, at the same time the process of moving structures to produce at steady position of cranes without the use of Yelnia the traction means, and alternating cycles synchronous operation of the same mechanism both cranes repeated to installing the movable structure in the design position.
На фиг. 1 изображена схема перемещени двум кранами конструкции горизонтального типа; на фиг. 2-вид по стрелке А; на фиг. 3- схема перемещени двум кранами конструкции вертикального типа; на фиг. 4 - то же, план.FIG. Figure 1 shows a scheme for moving two cranes of a horizontal type construction; in fig. 2-a view along arrow A; in fig. 3 shows a scheme for moving two cranes of a vertical type structure; in fig. 4 - the same plan.
Установка в проектное положение конструкции горизонтального типа, например опорного кольца 1, заключаетс в том, что послеInstallation in the design position of the horizontal type construction, for example, support ring 1, consists in the fact that after
подъема его на начальную высоту одновременно крюками двух кранов 2 и 3 над исходным положением I, дальнейшее перемещение конструкции к проектному положению II производ т чередованием синхронной работы механизмов изменени вылетов R двух кранов и механизмов разворота стрел кранов до тех пор, пока конструкцию не вывес т над проектным положением, после чего ее одновременно крюками двух кранов опускают на заданныйlifting it to the initial height simultaneously with the hooks of two cranes 2 and 3 above the initial position I, further moving the structure to the design position II is performed by alternating the synchronous operation of the mechanisms for changing the outreach R of the two cranes and the mechanisms of the boom of the cranes until the structure hangs over design position, after which it is simultaneously lowered by hooks of two cranes to a predetermined
уровень.level.
Операции подъема конструкций стрелами кранов производ т до отклонени грузовых строп от вертикали на расчетную и контролируемую величину d, с учетом которой выбираютс краны необходимой грузоподъемности и минимального вылета R. Дл сохранени равномерного распределени весовой нагрузки на краны и уменьшени вли ни на их устойчи вость дополнительных усилий на всех этапахThe lifting of structures by booms of cranes is carried out before the cargo lines are deflected from the vertical by a calculated and controlled value d, which takes into account cranes of the required capacity and minimum clearance R. To maintain an even distribution of the weight load on the cranes and reduce their impact on the additional forces at all stages
перемещени конструкции производ т кои-.The movements of the structure are produced by koi.
9393
троль над отклонением строн на заданную величину d, горизонтальностью и пройденным ею рассто нием, носле каждой операции. Контролируют отклонение строп путем замеров рейками размеров h, соответствующих высоте подъема стрел кранов и конструкции относительно ее исходного положени I, после подъема крюками кранов на начальную высоту.control over the deviation of the strontium by a given amount d, horizontal and the distance covered by it, during each operation. Control the deviation of the sling by measuring with reiki of dimensions h, corresponding to the height of the boom of the cranes and the structure relative to its initial position I, after lifting the cranes with the hooks to the initial height.
Синхронность поочередной работы одних и тех же механизмов кранов обеспечиваетс одновременным вынолнением команд операторами кранов, имеющими визуальную св зь с руководителем монтажных работ.The synchronism of the alternate operation of the same crane mechanisms is ensured by simultaneously executing commands by crane operators who have visual communication with the installation manager.
Установка в проектное положение конструкции 4 вертикального типа, например мачты , осуществл етс в несколько последовательных этапов (положений) III, IV, V, VI и VII. Положение III конструкции 4 - исходное на ложементе 5; положени IV и V - ответственные с точки зрени устойчивости кранов - этапы ее подъема в промежуточное; положение VI - вертикальное; положение VII - конечное, проектное положение конструкции на фундаменте 6. На этапе подготовительных работ производ т расстановку кранов 2 и 3 в рабочее ноложение на вылетах R. После подъема конструкции одновременно крюками двух кранов из исходного положени III в положение IV и дальпейшее ее перемещение производ т чередованием в онределенном технологическом пор дке синхронной работы механизмов изменени вылетов двух кранов, механизмов разворота стрел и механизмов подъема крюков двух кранов в пределах контролируемых величин d, углов аир до тех пор, пока конструкцию не поднимут в положение, близкое к нейтральному, после чего ее перевод т за нейтральное положение V уже чередованием синхронной работы механизмов разворота стрел двух кранов и механизмов подъема их крюков до установки конструкции , при необходимости, на технологические подставки 7 или в промежуточпое положение VI. Контролируют величины d и а на этом этапе перемещени конструкции с помощью сектора 8, закрепленного около оси поворота конструкции и имеющего риски углов р , соответствующие угловому перемещению при подъеме крюками или стрелами кранов относительно исходного положени III. При перемещении конструкции в положение VII вначале осуществл ют поочередное передвижение кранов на рассто ние S и установку их в новое рабочее положение на вылетах г путем последовательного выполнени операций ослаблени грузовых строп и разворота стрелы сначала одного крана, а потом другого; затем конструкцию поднимают на необходимую по технике безопасности высотуInstallation in the design position of the construction 4 of the vertical type, for example a mast, is carried out in several successive stages (positions) III, IV, V, VI and VII. Position III design 4 - the original on the lodgement 5; Positions IV and V - responsible from the point of view of stability of cranes - the stages of its lifting into the intermediate one; position VI - vertical; position VII is the final design position of the structure on the foundation 6. At the preparatory stage, cranes 2 and 3 are placed in working position on the outreach R. After the structure is lifted simultaneously by the hooks of two cranes from the initial position III to position IV and its further movement alternating, in an on-line technological order, the synchronous operation of the mechanisms for changing the outreach of two cranes, the mechanisms for turning the booms and the mechanisms for lifting the hooks of the two cranes within the limits of controlled values d, angles ai until the structure is raised to a position close to neutral, after which it is transferred to the neutral position V by alternating the synchronous operation of the boom-turning mechanisms of the two cranes and lifting mechanisms of their hooks before installing the structure, if necessary, on technological supports 7 or in intermediate position VI. The values of d and a are controlled at this stage by the movement of the structure with the help of sector 8 fixed around the axis of rotation of the structure and having risks of angles p corresponding to the angular movement when lifting with hooks or booms of cranes relative to the initial position III. When the structure is moved to position VII, first, the cranes are alternately moved to the distance S and set into a new working position on the departures r by successively performing the operations of loosening the cargo lines and turning the boom first of one crane and then the other; then the design is raised to the required height for safety
5 одновременно крюками двух кранов, далее перемещают и устанавливают в проектное положение VII путем чередовани синхронной работы механизмов изменени вылетов двух кранов, механизмов разворота стрел и меха0 низмов подъема крюков двух кранов.5 simultaneously with the hooks of two cranes, then they are moved and installed into design position VII by alternating the synchronous operation of the mechanisms for changing the outreach of two cranes, the mechanisms for turning the booms and the mechanisms for lifting the hooks of the two cranes.
Предмет изобретени Subject invention
Способ перемещени конструкций, двум The method of moving structures, two
5 кранами путем совместпой и одновременной работы нескольких грузоподъемных и грузоповоротных механизмов каждого крана, о тличающийс тем, что, с целью повышени эффективности монтажных работ и исключени аварийных ситуаций, перемещение конструкций после подъема их на начальную высоту одновременно крюками обоих кранов осуществл ют путем чередовани синхронной работы механизмов подъема стрел двух кранов до отклонени грузовых строп на расчетную и контролируемую величину и механизмов поворота стрел до исходного вертикального положени грузовых строн, при этом процесс перемещени конструкций производ т при5 cranes by joint and simultaneous work of several lifting and load-turning mechanisms of each crane, differing by the fact that, in order to increase the efficiency of installation work and to avoid emergencies, the structures, after lifting them to the initial height, are simultaneously hooks of both cranes by alternating synchronous work boom lift mechanisms of two cranes to the deviation of cargo slings on the calculated and controlled value and boom swing mechanisms to the original vertical position There are cargo strongholds, while the process of moving structures is carried out at
0 стационарном положении кранов без применени вспомогательных т говых средств, а циклы чередовани синхронной работы одних и тех же механизмов обоих кранов новтор ют до установки перемещаемой конструкции в0 stationary position of cranes without the use of auxiliary traction means, and the cycles of alternating synchronous operation of the same mechanisms of both cranes are repeated before installing the movable structure in
5 проектное положение.5 design position.
IVIV
VIVI
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1784371A SU449879A1 (en) | 1972-04-27 | 1972-04-27 | The method of moving structures with two cranes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1784371A SU449879A1 (en) | 1972-04-27 | 1972-04-27 | The method of moving structures with two cranes |
Publications (1)
Publication Number | Publication Date |
---|---|
SU449879A1 true SU449879A1 (en) | 1974-11-15 |
Family
ID=20514159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU1784371A SU449879A1 (en) | 1972-04-27 | 1972-04-27 | The method of moving structures with two cranes |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU449879A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9187295B2 (en) * | 2006-08-31 | 2015-11-17 | Liebherr-Werk Nenzing Gmbh | Safety and control method for cranes |
CN107572383A (en) * | 2017-08-28 | 2018-01-12 | 北汽福田汽车股份有限公司 | Crane control method and device |
-
1972
- 1972-04-27 SU SU1784371A patent/SU449879A1/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9187295B2 (en) * | 2006-08-31 | 2015-11-17 | Liebherr-Werk Nenzing Gmbh | Safety and control method for cranes |
CN107572383A (en) * | 2017-08-28 | 2018-01-12 | 北汽福田汽车股份有限公司 | Crane control method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3789565A (en) | Method and system of erecting tower buildings | |
US4496277A (en) | Lifting device and method | |
CN206859698U (en) | A kind of high-rise building air conditioner water vertical shaft Large Diameter Pipeline standpipe inverted construction facility | |
SU449879A1 (en) | The method of moving structures with two cranes | |
US3750895A (en) | Yard jib crane | |
CN114275660A (en) | Simple hoisting device and rapid hoisting method for steel reinforcement cage | |
CN104355238A (en) | Portal crane with jib structure | |
CN213475166U (en) | Cross-shaped automatic leveling device for hoisting large-diameter pile foundation reinforcement cage | |
CN212532072U (en) | Remote control tower crane | |
EP0034672A1 (en) | Column mounted crane | |
US4359177A (en) | Revolving turret for continuous casting, with independent arms, and eccentric load compensation | |
RU2118288C1 (en) | Process of erection of large-sized heavy members of buildings and structures | |
CN111874816A (en) | Crane boom and using method thereof | |
RU2442743C2 (en) | Double-girder crane with number of supports | |
RU81181U1 (en) | CALIBRATING LOADING DEVICE | |
CN215326558U (en) | Hoisting mechanism for building construction | |
CN211946033U (en) | Utilize heavy object hoisting device of H shaped steel post shore | |
GB1456435A (en) | Crane | |
SU1458536A1 (en) | Arrangement for raising an elongated structure | |
CN208869186U (en) | A kind of fixture convenient for the overturning of tower equipment | |
CN217867758U (en) | Four-point hanging beam for large-scale floating crane | |
CN221645843U (en) | Prefabricated superimposed sheet construction equipment | |
CN216004988U (en) | Bilateral automatic slag door turning machine suitable for multiple working conditions | |
SU850560A1 (en) | Device for erecting equipment with aid of boom crane | |
SU901259A1 (en) | Method for installation of vertical equipment |