SU427303A1 SU1806737A SU1806737A SU427303A1 SU 427303 A1 SU427303 A1 SU 427303A1 SU 1806737 A SU1806737 A SU 1806737A SU 1806737 A SU1806737 A SU 1806737A SU 427303 A1 SU427303 A1 SU 427303A1
Authority
SU
USSR - Soviet Union
Prior art keywords
cement
well
mechanical connection
control
cleaning column
Prior art date
Application number
SU1806737A
Other languages
Russian (ru)
Inventor
О. Л. Кузнецов К. А. Шишин В. Г. Тыминский Д. А. Крылов
научно исследовательский институт Всесоюзный
геохимии объединение дерной геофизики
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1806737A priority Critical patent/SU427303A1/en
Application granted granted Critical
Publication of SU427303A1 publication Critical patent/SU427303A1/en

Links

Landscapes

  • Investigating Or Analyzing Materials Using Thermal Means (AREA)

Description

1one

Изобретение относитс  к геофизическим способам оценки качества ценентированш затрубиого иространства.The invention relates to geophysical methods for assessing the quality of the centered space.

В практике бурени  глубоких скважин ujHpoKo и эффективно примен ютс  геофизические методы оценки технического состо ни  скважин: скважинна  радиометри , термо 5етри  и акустика. Использу  комплекс указанных методов, оценивают высоту нодъема иемеита , его распределение в затрубиом пристраистве , степень сцеплени  цементного кольца с колонной и породой.In the practice of drilling deep wells, ujHpoKo and geophysical methods for assessing the technical state of wells are effectively used: well radiometry, thermal methods and acoustics. Using the complex of these methods, estimate the height of the ymeite aggregate, its distribution in the cement habitat, the degree of adhesion of the cement ring with the column and rock.

Недостатком известного способа контрол  механической св зи цемента с обсадной колокной  вл етс  невозможность отличить случаи сущсствова и  в цементном камне микроканалов от случа  слабого контакта колонны с цементным камнем (при проведении акустической цементометрин ч обоих случа х образуетс  трубна  волна). Вместе с тем технологи  освоени/т скважии в этих случа х должна быть различной.The disadvantage of the known method of controlling the mechanical connection of cement with a casing bell is the inability to distinguish cases in the cement stone of microchannels from the case of weak contact of the column with cement stone (when conducting acoustic cementometer in both cases a tube wave is formed). At the same time, the technology of development / ton of the well in these cases should be different.

Целью изобретени   вл етс  повышение эффективности контрол . Сущность изобретезн1Я состоит в том, что измен ют диаметр ко .тонны путем изменени  давлени  ил темп ратуры внутри ее и oдиoвpe.eннo провод т геофизические измерени .The aim of the invention is to increase the efficiency of the control. The essence of the invention is that the diameter of the cubic ton is changed by changing the pressure or the temperature inside it and the gyophysical measurements are carried out.

Известно, что если внутрл обсадной колонны );зменить давление или температуру, It is known that if the inner casing); change the pressure or temperature,

то под действием расн}фаюш,их диаметр ее увеличиваетс , и зазор между колонной и цементным кольцом уменьшитс . Пр) проеедеини акустической цемеитометрии в случае слабого контакта величина амнллтуды сиадст до О, а при наличии каналов спад амплитуды ограничитс  определенным уровнем, ве ..;ичипа которого может характеризовать 5сличину канала.then, under the action of rasn} fayush, their diameter increases, and the gap between the column and the cement ring decreases. Ex) in the case of weak contact, the amount of amnlltuda siadst to O, and in the presence of channels, the amplitude decay will be limited to a certain level, the height of which can characterize the channel.

Предлагаемый способ ко1Г1рол  включает в себ  следующие операции: геофизические измерени  в скважине, например акустические у-спектроскопические, либо гамма-гамма-измереии , воздействие иа ствол обсадной колонны, повторные геофизическ1 е измерени  выбранным методом в процессе воздействи . Воздействие на ствол колоины осуществл етс  путем повышени  давлени  или измемеипп температуры ее.The proposed method includes the following operations: geophysical measurements in the well, such as acoustic y-spectroscopic or gamma-gamma measurements, impact from the casing shaft, repeated geophysical measurements by the selected method during the treatment. The impact on the coloin trunk is carried out by increasing the pressure or measuring its temperature.

Предмет изобретени Subject invention

Способ контрол  механической св зи цемента с обсадной колонной в скважине, основанный па изучении деформационно-прочиостных свойств среды, отличающийс  тем, что, С целью повышени  эффективности контрол),, производ т расширение колонны, например, гидравлическим методом, оценивают геофизическими способами деформационно-прочност34The method of controlling the mechanical connection of the cement with the casing in the well, based on the study of the deformation-prociness properties of the medium, characterized in that, in order to increase the effectiveness of the control, the column is expanded, for example, by a hydraulic method, and deformed by geophysical methods.

цые характеристики среды после расширени и измеиеиием указанных характеристик средыThe total characteristics of the medium after expansion and the change in these characteristics of the medium

колонны, и. на основании вы вленной зависи-суд т о .механической св зи колонны и иемости между степенью расширени  колоннымента.columns, and. on the basis of the revealed dependence of the mechanical connection of the column and the capacity between the degree of expansion of the column.

427303 427303

SU1806737A 1972-07-10 1972-07-10 METHOD OF CONTROL OF THE MECHANICAL CONNECTION OF CEMENT WITH THE CLEANING COLUMN IN THE WELL SU427303A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1806737A SU427303A1 (en) 1972-07-10 1972-07-10 METHOD OF CONTROL OF THE MECHANICAL CONNECTION OF CEMENT WITH THE CLEANING COLUMN IN THE WELL

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1806737A SU427303A1 (en) 1972-07-10 1972-07-10 METHOD OF CONTROL OF THE MECHANICAL CONNECTION OF CEMENT WITH THE CLEANING COLUMN IN THE WELL

Publications (1)

Publication Number Publication Date
SU427303A1 true SU427303A1 (en) 1974-05-05

Family

ID=20520759

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1806737A SU427303A1 (en) 1972-07-10 1972-07-10 METHOD OF CONTROL OF THE MECHANICAL CONNECTION OF CEMENT WITH THE CLEANING COLUMN IN THE WELL

Country Status (1)

Country Link
SU (1) SU427303A1 (en)

Similar Documents

Publication Publication Date Title
Jacob On the flow of water in an elastic artesian aquifer
FR2798197B1 (en) METHOD FOR FORMING A MODEL OF A GEOLOGICAL FORMATION, CONSTRAINED BY DYNAMIC AND STATIC DATA
SU427303A1 (en) METHOD OF CONTROL OF THE MECHANICAL CONNECTION OF CEMENT WITH THE CLEANING COLUMN IN THE WELL
Ramezanian et al. An experimental study to investigate the effects of temperature and confining pressure on unconventional rock mechanical properties
CN105370267B (en) Method and device for analyzing elastic coefficient stress sensitivity of tight sandstone
Zhang et al. Mechanical strength of reservoir materials: key information for sand prediction
US3235026A (en) Method for determining formation pressures
WO2020112089A1 (en) Shaped charge effect measurement
Novosad et al. Geoacoustic methods in the slope stability investigation.
RU2045082C1 (en) Method for determining permeable zones of geological media
SU501148A1 (en) Method for determining hydrodynamic parameters of formations in water wells
SU930188A1 (en) Mountain rock effective porousity coefficient determination method
SU574664A1 (en) Apparatus for determining physical and mechanical properties of soil
RU2171373C1 (en) Method of determination of fluid flow in annular space of injection well
SU362907A1 (en) METHOD FOR MEASURING LIQUID LIQUID IN WELL
Fertl et al. HOW DOWNHOLE TEMPERATURES, PRESSURES AFFECT DRILLING, PART 2, DETECTING AND EVALUATING FORMATION PRESSURES
SU964122A1 (en) Method of determining physical characteristics of media in wells and cased-in wells
SU449147A1 (en) Method for determining dynamic fluid level in a well
EA002074B1 (en) Acoustic method (arwl) for applying an action on a well and on the layer of a field of mineral resources
DESBRANDES Understanding the effect of pore pressure on acoustic velocity measurements(Final Report, Apr. 1990- Apr. 1991)
Moos VELOCITY, ATTENUATION, AND NATURAL FRACTURES IN SHALLOW BOREHOLES.
Rongzun et al. A study of viscoelastic-plastic behavior of rock salt and its application in petroleum engineering
Read et al. In situ thermal testing at AECL's Underground Research Laboratory
SU449330A1 (en) Method for determining the speed of propagation of transverse waves
SU424097A1 (en) METHOD OF GEOACOUSTIC EXPLORATION, FOR EXAMPLE, DOMESTIC