SU427138A1 - INSTALLATION FOR RECEPTION, ACCUMULATION AND EXTRACTION OF WELL PIPES IN HORIZONTAL POSITION WHILE CARRYING OUT OF LIFT OPERATIONS12 - Google Patents
INSTALLATION FOR RECEPTION, ACCUMULATION AND EXTRACTION OF WELL PIPES IN HORIZONTAL POSITION WHILE CARRYING OUT OF LIFT OPERATIONS12Info
- Publication number
- SU427138A1 SU427138A1 SU1802827A SU1802827A SU427138A1 SU 427138 A1 SU427138 A1 SU 427138A1 SU 1802827 A SU1802827 A SU 1802827A SU 1802827 A SU1802827 A SU 1802827A SU 427138 A1 SU427138 A1 SU 427138A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- installation
- pipes
- store
- shelves
- horizontal position
- Prior art date
Links
Landscapes
- Warehouses Or Storage Devices (AREA)
Description
Изобретение относитс к опус ко-подъемным операци м при бурении и подземном ремонте нефт ных и газовых скважин.The invention relates to downhole co-lifting operations in drilling and underground repair of oil and gas wells.
Известна установка дл приема, накоплени и выдачи скважинных .труб в горизонтальном положении при проведении спускоподъемных операций, содержаща расположенные на несущем основании магазин дл приема труб и подающий механизм дл транспортировани труб в магазин и обратно.A known installation for receiving, accumulating and dispensing borehole pipes in a horizontal position during lifting operations, comprising tubes for receiving pipes located on a support base and a feeding mechanism for transporting pipes to and from the magazine.
Однако известна установка сложна по конструкции, а ее магазин имеет ограниченную емкость.However, the known installation is complex in design, and its store has a limited capacity.
Предлагаема установка отличаетс от И31вестной тем, что магаЗИн выполнен в виде нескольких полок, расположенных одна .над другой, где нижн примыкает к подающему механизму, при этом со стороны концов выщерасположенных полок закреплены отсекатели , обеспечивающие последовательное прохождение труб с пижерасположенной полки на вышерасположевные при загрузке магазина и с выщерасположенгых иа подающий 1 еханизм при разгрузке магазина. Это упрощает конструкцию установки и увеличивает ее емкость.The proposed installation differs from И31 known in that the magazine is made in the form of several shelves located one above the other, where the bottom is adjacent to the feed mechanism, while on the side of the ends of the disposable shelves fixed cutters ensure the sequential passage of pipes from the adjacent shelf to the upper shelf when loading the store and from the positioning of the feeder 1 mechanism when unloading the store. This simplifies the installation design and increases its capacity.
Целесообразно, чтобы магазин имел две секции полок, размещенные на некотором рассто нии одна от другой. Полки магазинаIt is advisable that the store has two sections of shelves placed at some distance from one another. Store shelves
могут быть наклонены в сторону подающего механизма.can be tilted towards the feeder.
На фиг. 1 изображена предлагаема установка , вид в плане; на фиг. 2 - установка в процессе загрузки сиваживных трубе матазии; на фиг. 3 - разрез по А-А на фиг. 2; на фиг. 4 - установка в процессе выдачи скважинных труб из магазина; иа фиг. 5 - узел I на фиг. 2.FIG. 1 shows the proposed installation, plan view; in fig. 2 - installation of the Matasia pipe in the process of loading; in fig. 3 is a section along A-A in FIG. 2; in fig. 4 - installation in the process of issuing well pipes from the store; FIG. 5 shows the node I in FIG. 2
Установка имеет основание А которое может быть выполнено з виде жесткой сварной конструкции, смонтированной на полозь х, колесах, гусеницах и т. п. Па основании /The installation has a base A which can be made in the form of a rigid welded structure mounted on a skid x, wheels, tracks, etc. Pa base /
смонтирован магазин 2 в виде двух секций 3 и 4, содержащих наклонные полки 5, прп этом над нижней полкой 6 установлен ограничитель 7 высоты. Кажда полка состоит из р да труб S, встроенных неподвижно однимthe magazine 2 is mounted in the form of two sections 3 and 4, containing inclined shelves 5, above it is a height limiter 7 above the lower shelf 6. Each shelf consists of a series of pipes S, fixed in one fixed
концом в несущую 9 и вспомогательную 10 сте/ики.end to carrier 9 and auxiliary 10 ste / iki.
К нижней полке 6, закреплеиной на основании }, прикреплена стойка //, на которой может быть установлен направл ющий отсекатель 12 (фиг. 5). Выщерасположенные полки магази} а могут быть оборудованы запирающими отсекател ми 13 (фиг. 2), при этом кажда секци 3 и 4 магазина спабжепа вспомогательной полкой 14 с встроенными в неTo the lower shelf 6, secured to the base}, a stand is attached, on which the guide cutter 12 can be mounted (Fig. 5). The well-spaced shelves of the magazine can be equipped with locking cutters 13 (Fig. 2), with each section 3 and 4 of the spabjep shop having an auxiliary shelf 14 with built-in
подвижными (с помощью винтов) отсекател ми 15 -(фиг. 2 и 4). Количество полок зависит от требуемой емкости магазина.movable (with screws) cutters 15 - (Fig. 2 and 4). The number of shelves depends on the required capacity of the store.
На основании / смонтирован шнековый механизм 16 подачи, включающий двигатель 17, редуктор 18, цепную передачу 19 и пару шпеков 20 и 21, имеющих посто ппый шаг навивки витков. На основаниии / также расположен желоб 22, служащий дл приема трубы с оси сквалыжны. В рабочем положении осева лини желоба 22 должна про.одить через центр усть скважины (фиг. 1). Между желобом 22 и шнеками 20 и 21 установлены покаты 23, представл ющие собой неподвижно закрепленные иа основании 1 отрезки труб, на которых установлены поворотпые флажки 24. В случае необходимости установка может быть оборудована резервными стеллажами 25 (фиг. 1 и 4) дл укладки труб.On the base / mounted screw feed mechanism 16, which includes the engine 17, the gearbox 18, the chain drive 19 and a pair of pins 20 and 21, having a constant step of winding the coils. On the base / there is also a chute 22 serving to receive the pipe from the axis of the borehole. In the working position, the axial line of the chute 22 must pass through the center of the wellhead (Fig. 1). A roll 23 is installed between the chute 22 and the augers 20 and 21, representing fixed sections and base 1 of pipe sections on which rotary flags 24 are installed. If necessary, the installation can be equipped with backup racks 25 (Fig. 1 and 4) for pipe laying .
Установка р.аботает следующим образом.The installation works as follows.
При подъеме труб 26 из скважины они перевод тс известным способом в горизонтальное положение. В процессе этого перевода труба 26 (фиг. 2) отводит поворотные флажки 24 в сторону, чем обеспечиваетс беспреп тственное прохождение труб по желобу 22. После укладки трубы в желоб 22 она размещаетс поверх поворотных флажков 24 и под действием собствепного веса скатываетс по покатам 23 на щнеки 20 и 21. При включении механизма 16 подачи шнеки 20 и 21 поворачиваютс на один оборот, в результате чего трубы поступательно перемещаютс к магазину 2-под ограничителем 7 высоты. Вслед за этим происходит повторение такой же операции при подъеме очередной трубы 26 из скважины до заполнени трубами всех витков шнеков 20 и 21.When pipes 26 are lifted from the well, they are transferred in a known manner to a horizontal position. In the course of this transfer, the pipe 26 (Fig. 2) retracts the pivot flags 24 to the side, thus ensuring unimpeded passage of the pipes along the chute 22. After laying the pipe into the chute 22, it is placed on top of the rotary flags 24 and, under the influence of the own weight, rolls down the slopes 23 The screws 20 and 21. When the feed mechanism 16 is turned on, the screws 20 and 21 rotate one turn, as a result of which the pipes move progressively towards the magazine 2-under the height limiter 7. Following this, the same operation is repeated when the next pipe 26 is lifted from the well before filling all the turns of the screws 20 and 21 with pipes.
При дальнейщем извлечении труб из скважины трубы начинают принудительно вытесн тьс со шнеков на нижнюю полку 6. После ее заполнени трубы вытесн ютс на выщерасположенную полку 5, дл чего отсекатель 12 устанавливаетс в- положение а (фиг. 5V При этом отсекатель 15 находитс в положении , преп тствующем скатыва нию труб обратно на шнеки 20 и 21. /После заполнени второй снизу полки она запираетс отсекателем 13. При дальнейшем поступлении труб на шнеки 20 и 21 аналогичным путем производитс загрузка выщерасположенных полок, причем отсекатель J2 последовательно переставл етс в положение б, в и т. д.Upon further extraction of the pipes from the well, the pipes are forcibly forced out of the screws to the lower shelf 6. After it is filled, the pipes are forced out onto the lined shelf 5, for which the cutter 12 is set in position a (Fig. 5V) The cutter 15 is in the position preventing the tubes from rolling back onto screws 20 and 21. / After filling the second shelf from the bottom, it is locked with a slam-shutter 13. With further supply of the tubes to screws 20 and 21, similarly, the vyprasplozhennyh shelves are loaded; therefore, it moves to position b, c, etc.
При спуске труб 26 в скважину установка работает в обратной последовательности. Дл этого поворотные 24 снимаютс , шнеки 20 и 21 проворачиваютс в обратном направлении , разгружа магазин последовательно снизу вверх. Отсекатели 15 отвод тс в положение, изображенное на фиг. 4.When lowering the pipe 26 into the well, the installation operates in reverse order. To do this, the pivot points 24 are removed, the screws 20 and 21 turn in the opposite direction, unloading the magazine successively from the bottom up. The cutters 15 are retracted to the position shown in FIG. four.
Трубы 26 поступают в желоб 22, с которого они перевод тс в вертикальное положение и опускаютс в оюважину.The pipes 26 enter the chute 22, from which they are transferred to the vertical position and are lowered into the well.
Предлагаема установка проста по конструкции и в эксплуатации и дает возможность механизировать процесс укладки труб при спуоко-иоаъемных операщи х.The proposed installation is simple in design and in operation and makes it possible to mechanize the process of pipe laying during the operation of the slide-in operators.
Предмет изобретени Subject invention
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1802827A SU427138A1 (en) | 1972-06-28 | 1972-06-28 | INSTALLATION FOR RECEPTION, ACCUMULATION AND EXTRACTION OF WELL PIPES IN HORIZONTAL POSITION WHILE CARRYING OUT OF LIFT OPERATIONS12 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1802827A SU427138A1 (en) | 1972-06-28 | 1972-06-28 | INSTALLATION FOR RECEPTION, ACCUMULATION AND EXTRACTION OF WELL PIPES IN HORIZONTAL POSITION WHILE CARRYING OUT OF LIFT OPERATIONS12 |
Publications (1)
Publication Number | Publication Date |
---|---|
SU427138A1 true SU427138A1 (en) | 1974-05-05 |
Family
ID=20519615
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU1802827A SU427138A1 (en) | 1972-06-28 | 1972-06-28 | INSTALLATION FOR RECEPTION, ACCUMULATION AND EXTRACTION OF WELL PIPES IN HORIZONTAL POSITION WHILE CARRYING OUT OF LIFT OPERATIONS12 |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU427138A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4604724A (en) * | 1983-02-22 | 1986-08-05 | Gomelskoe Spetsialnoe Konstruktorsko-Tekhnologicheskoe Bjuro Seismicheskoi Tekhniki S Opytnym Proizvodstvom | Automated apparatus for handling elongated well elements such as pipes |
US6543551B1 (en) | 1995-02-22 | 2003-04-08 | The Charles Machine Works, Inc. | Pipe handling device |
EP2231999A4 (en) * | 2007-12-21 | 2015-06-10 | Sandvik Mining & Constr Oy | Method and devices for handling rod-like pieces in drilling and bolting |
-
1972
- 1972-06-28 SU SU1802827A patent/SU427138A1/en active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4604724A (en) * | 1983-02-22 | 1986-08-05 | Gomelskoe Spetsialnoe Konstruktorsko-Tekhnologicheskoe Bjuro Seismicheskoi Tekhniki S Opytnym Proizvodstvom | Automated apparatus for handling elongated well elements such as pipes |
US6543551B1 (en) | 1995-02-22 | 2003-04-08 | The Charles Machine Works, Inc. | Pipe handling device |
EP2231999A4 (en) * | 2007-12-21 | 2015-06-10 | Sandvik Mining & Constr Oy | Method and devices for handling rod-like pieces in drilling and bolting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3792783A (en) | Pipe handling system | |
US3254776A (en) | Pipe handling and storage apparatus | |
US11078731B2 (en) | Pipe storage box | |
US3916500A (en) | Pipe handling apparatus | |
US3559821A (en) | Drill pipe handling apparatus | |
KR940008639B1 (en) | Well drilling | |
US2999605A (en) | Apparatus for moving pipe into and out of an oil well derrick | |
US4379676A (en) | Pipe handling system | |
EP3485132B1 (en) | Method and arrangement for transporting drill pipes | |
SU427138A1 (en) | INSTALLATION FOR RECEPTION, ACCUMULATION AND EXTRACTION OF WELL PIPES IN HORIZONTAL POSITION WHILE CARRYING OUT OF LIFT OPERATIONS12 | |
WO2001023701A1 (en) | Horizontal drill pipe racker and delivery system | |
US4050590A (en) | Drilling rigs | |
AU730626B2 (en) | Apparatus and method for running tubulars | |
US3887086A (en) | Pipe racker | |
US4460293A (en) | Mine shaft liner | |
US10161202B2 (en) | Drill rod store, drilling rig and method for downward drilling | |
CN207524024U (en) | A kind of metal side tube automatic stacking machine | |
US2407638A (en) | Apparatus for delivering elongated cylindrical articles | |
CN215889948U (en) | Drill pipe box is stacked to unordered | |
EP0182500A1 (en) | Carousel rod loader | |
US2846093A (en) | Transfer mechanism for auger drills | |
RU2737304C1 (en) | Installation of storage, dispensing and reception of pipes during lowering and raising operations | |
US3648736A (en) | Coil forming and transfer device | |
RU2170325C1 (en) | Set to take, store and issue pipes and boring rods during descending-lifting operations | |
US5263657A (en) | Arrangement with a coil forming and conveying system for wire or light-section steel, particularly for high oil weights |