Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filedfiledCritical
Priority to SU1863061ApriorityCriticalpatent/SU410176A1/ru
Application grantedgrantedCritical
Publication of SU410176A1publicationCriticalpatent/SU410176A1/ru
Perfectionnement à la construction d'ensembles soumis à de fortes accélérations et à des vibrations de grande intensité et comportant des dispositifs relativement fragiles