SU397594A1 - METHOD OF CONSTRUCTION, FOR EXAMPLE, VIBRONIFERIFIER OF BATTERY PILET WITH EXTENSION - Google Patents
METHOD OF CONSTRUCTION, FOR EXAMPLE, VIBRONIFERIFIER OF BATTERY PILET WITH EXTENSIONInfo
- Publication number
- SU397594A1 SU397594A1 SU1400907A SU1400907A SU397594A1 SU 397594 A1 SU397594 A1 SU 397594A1 SU 1400907 A SU1400907 A SU 1400907A SU 1400907 A SU1400907 A SU 1400907A SU 397594 A1 SU397594 A1 SU 397594A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- construction
- vibroniferifier
- pilet
- battery
- extension
- Prior art date
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Piles And Underground Anchors (AREA)
Description
1one
Известен способ возведени , например, виброгрейфером набивной сваи с ушир&нием нутем проходки скважины и последующего бетонировани 1ПОД ГЛИНИСТЫМ раствором методом вертикально перемещающейс трубы.There is a known method of construction, for example, by vibrating a stuffed pile with a wider & nyuyu well penetration and subsequent concreting with a SLIM solution using the method of a vertically moving pipe.
Однако этот способ не обеспечивает большой производительности труда лри использовании только ОДНОГО, например, виброгрейфера .However, this method does not provide high labor productivity using only ONE, for example, a vibrator grab.
Целью изобретени вл етс повышение производительности труда за счет использовани только ОДНОГО виброгрейфера и обеспечение повышени качества набивной сваи, дл чего ущирение набивной сваи осуществл ют путем последовательных проходок через равные углы в плане р да выработок под углом к вертикальной оси скважины с последующим их-обетонированием.The aim of the invention is to increase labor productivity by using only ONE vibratory grapple and ensuring the quality of the ramming pile, for which the ramming of the ramming pile is carried out by successive penetrations through equal angles in the plan of a number of workings at an angle to the vertical axis of the well and their subsequent wrapping.
На фиг. 1 доказана операци по образованию уширени скважины; па фиг. 2 - операци бетонировани под глинистым раствором.FIG. 1 shows the broadening operation; pas figs. 2 shows a concreting operation under a clay solution.
Предложенный способ осуществл ют в следующей последовательности.The proposed method is carried out in the following sequence.
Сначала осуществл ют проходку скважины под ГЛИНИСТЫМ раствором. Дл поддержани ГЛИНИСТОГО раствора в подвижном состо нии его внбрируют. Затем дл образовани уширени в скважине на забое устанавливаютFirst, a well is drilled under a CLAY solution. To maintain the CLAY solution in a mobile state, it is embedded in it. Then, in order to form the broadening in the well at the bottomhole,
22
приспособление, включающее цилиндр 1 с нижним башмаком 2, снабженный окном и наклонной направл ющей 3.a device including a cylinder 1 with a bottom shoe 2, provided with a window and an inclined guide 3.
Вслед за установкой приспособлени онуекают виброгрейфер с заборной частью 4 меньщего диал1етра чем диаметр скважины до упора в наклонную направл ющую. При включении продольных колебаний виброгрейфера последний, скольз по наклонной направл ющей , осуществл ет забор и извлечение грунта, окружающего скважину, и тем самым создает местное уширение.Following the installation of the device, a vibration grab with a intake part 4 of a smaller diameter than the diameter of the well as far as it goes into the inclined guide will be hoisted. When longitudinal vibrations of the vibration grab are switched on, the latter, slipping along the inclined guide, collects and extracts the soil surrounding the well, and thereby creates a local broadening.
После извлечени виброгрейфера производ т подъем направл ющего приспособлени ,After removing the vibrator grab, the guide device is raised,
разворот и последующее погружение внброгрейфера в новом положении. Дл фиксировани в плане направл ющего приспособлени .цилиндр имеет пластины 5, которые, прореза стенки скважины, предотвращают возможность поворота направл ющего приспособлени .reversal and subsequent immersion in a new position. In order to be fixed in terms of the guide means, the cylinder has plates 5 which, through the cutting of the borehole wall, prevent the possibility of rotation of the guide means.
Поворачива направл ющее :нр 1способление , создают уш1фение по всему периметру. Таким образом, уширение набнвной сваиBy turning the guide: nr 1 device, they create a sound around the entire perimeter. Thus, the broadening of the pile piles
осуществл ют путем последовательных проходок через равные углы в плане р да выработок под УГЛОМ к вертикальной оси скважины с последующим их обетонировапием.carried out by successive penetrations through equal angles in terms of a number of workings under the ANGLE to the vertical axis of the well followed by their obontirovanie.
Дл бетонироваии под глинистым раствором IB скважину опускают бетонолитную трубу 6, в нижней части которой расположены радиальные лоласти 7, а верх трубы скреплен с вибращионным механизмом виброгрейфера. После заполнени трубы бетонной смесью 8 производ т укладку бетона. При этом трубе, котора погружена нижним «онцо м с лопаст ми в свежеуложенную бетонную смесь, с помощью вибратора сообщают вращательные колебани . Радиальные лопасти, соверша вращательные колебани , взаимодействуют с бетонной смесью и шридают ей большую подвижность . Таким ойразом, за счет увеличени подвижности бетонной смеси с помощью ipaдиальных лопастей имеетс возможность применени более жестких бетонных смесей, что увеличивает несущую способность сван и уменьшает расход цемента.For concreting under the clay solution IB, the concrete pipe 6 is lowered, the radial blades 7 are located in the lower part, and the top of the pipe is fastened to the vibrator grab vibrating mechanism. After the pipe is filled with concrete mix 8, concrete is laid. In this case, rotational vibrations are communicated to the tube, which is immersed by the lower vanes with the blades in the newly laid concrete mix, with the help of a vibrator. The radial blades, having made rotational oscillations, interact with the concrete mixture and give it greater mobility. Thus, by increasing the mobility of the concrete mix using iradial blades, it is possible to use more rigid concrete mixes, which increases the load-bearing capacity of the pile and reduces the consumption of cement.
Кроме того, вращательные колебани вибратора предотвращают застревание бетонной смеси в бетонолитной трубе и обеспечивают укладку бетона без образовани пустот. ПриIn addition, the rotational vibrations of the vibrator prevent the concrete mixture from getting stuck in the concrete pipe and provide for the laying of concrete without voids. With
бетонировании методом вертикально-перемещающейс трубы глинистый раствор вытесн етс бетоном из скважины в отдельный при мок. По окончании бетонировани бето«слитную трубу освобождают от смеси и извлекают на поверхность.concreting with the method of a vertically moving pipe, the clay solution is displaced by concrete from the well into a separate one at the bottom. At the end of the concreting of the beta, the continuous pipe is freed from the mixture and removed to the surface.
Предмет изобретени Subject invention
Способ воз1ведени , например, виброгрейфером набивной сваи с ушпрением путем проходки скважины и последующего бетонировани под глинистым раствором методом вертикально перемещающейс трубы, отличающийс тем, что, с целью повышени производительности труда за счет иопользовани только одного, например, виброгрейфера и обеспечегнн повышени .качества набивной сваи, уширение набивной сваи осуществл ют путем последовательных проходок через равные углы в плане р да выработок под углом к вертикальной оси ск|важины с последующим их обетонированием.A method of raising, for example, a stuffed pile with a vibrating grab by drilling a well and then concreting under a mud solution using a vertically moving pipe method, characterized in that, in order to increase labor productivity by using only one, for example, a vibrating grab and ensuring an increase in the quality of a stuffed pile , the broadening of the ramming pile is carried out by successive penetrations through equal angles in terms of a number of workings at an angle to the vertical axis sk and important, followed by both onirovaniem.
a T y T j Tiyy rwa T y T j Tiyy rw
ФигЛFy
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1400907A SU397594A1 (en) | 1970-02-09 | 1970-02-09 | METHOD OF CONSTRUCTION, FOR EXAMPLE, VIBRONIFERIFIER OF BATTERY PILET WITH EXTENSION |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1400907A SU397594A1 (en) | 1970-02-09 | 1970-02-09 | METHOD OF CONSTRUCTION, FOR EXAMPLE, VIBRONIFERIFIER OF BATTERY PILET WITH EXTENSION |
Publications (1)
Publication Number | Publication Date |
---|---|
SU397594A1 true SU397594A1 (en) | 1973-09-17 |
Family
ID=20449777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU1400907A SU397594A1 (en) | 1970-02-09 | 1970-02-09 | METHOD OF CONSTRUCTION, FOR EXAMPLE, VIBRONIFERIFIER OF BATTERY PILET WITH EXTENSION |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU397594A1 (en) |
-
1970
- 1970-02-09 SU SU1400907A patent/SU397594A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103510510A (en) | Reinforced long spiral drilling concrete grouting pile and construction method thereof | |
CN104631442B (en) | Full-sleeve fetches earth and vibrates squeezed cast-in-place pile construction method | |
CN109083591A (en) | A kind of cast-in-situ bored pile pile body drilling and forming hole method integrated with pile cover | |
US3839874A (en) | Method of grouting a pile in a hole involving the vibration of the grouting material | |
SU397594A1 (en) | METHOD OF CONSTRUCTION, FOR EXAMPLE, VIBRONIFERIFIER OF BATTERY PILET WITH EXTENSION | |
GB2186310A (en) | Methods and apparatus for underpinning unstable structures | |
CN109056747A (en) | A kind of efficient mini steel-pipe pile constructing structure, method | |
CN107460873A (en) | Manual digging pile construction method | |
SU1622527A1 (en) | Method of erecting pile | |
RU2091541C1 (en) | Method of construction of piles foundation close to existing building | |
SU1761868A1 (en) | Method of erecting cast-in-place pile | |
RU173169U1 (en) | Reinforced concrete pile column | |
CN110700239B (en) | Method for reinforcing foundation by adopting tree root piles | |
SU791885A1 (en) | Vibrated grapple for sinking large-diameter holes for shell piles | |
RU2003109699A (en) | METHOD FOR CONSTRUCTING A PUNCHED-DRILLED PILET IN THE SOIL AND A DEVICE FOR ITS IMPLEMENTATION | |
SU1411373A1 (en) | Method of constructing cast-in-place hollow pile | |
SU983197A1 (en) | Method of erecting a retaining wall | |
RU1791541C (en) | Method for erection of padded support structure in soil | |
SU59578A1 (en) | A device for penetration of mines through floating pods | |
SU923825A1 (en) | Depth concrete mixture vibration compactor | |
SU881352A1 (en) | Method of erecting artificial support | |
SU844677A1 (en) | Well-sinking apparatus | |
JPS5941520A (en) | Construction of foundation pile and excavator therefor | |
RU2239024C1 (en) | Method for pile enlargement production | |
SU117650A1 (en) | The method of installation of printed piles with a broadened p |