SU372062A1 - VANCHES PRODUCTION LINE - Google Patents

VANCHES PRODUCTION LINE

Info

Publication number
SU372062A1
SU372062A1 SU1695608A SU1695608A SU372062A1 SU 372062 A1 SU372062 A1 SU 372062A1 SU 1695608 A SU1695608 A SU 1695608A SU 1695608 A SU1695608 A SU 1695608A SU 372062 A1 SU372062 A1 SU 372062A1
Authority
SU
USSR - Soviet Union
Prior art keywords
platform
trolley
cart
vanches
production line
Prior art date
Application number
SU1695608A
Other languages
Russian (ru)
Inventor
А. Мирмильштейн С.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1695608A priority Critical patent/SU372062A1/en
Application granted granted Critical
Publication of SU372062A1 publication Critical patent/SU372062A1/en

Links

Landscapes

  • Intermediate Stations On Conveyors (AREA)

Description

1one

Изобретение относитс  к деревообрабатывающей промышленности. ,The invention relates to the woodworking industry. ,

Известны линии дл  производства ванчесов, включающие горизонтальные лесопильные рамы и тележки с механизмом подачи сырь .Famous lines for the production of vanches, including horizontal sawing frames and carts with a feed mechanism.

Цель изобретени  - повысить производительность ЛИНИИ.The purpose of the invention is to improve the performance of the LINES.

Это достигаетс  тем, что подающий механизм выполнен двухэтажным с несколькими тележками и снабжен люками с подъемноопускным устройством, расположенными впереди и сзади лесопильной рамы, и транспортирующим устройством дл  перемещени  тележек .This is achieved by the fact that the feed mechanism is made up of two floors with several trolleys and is equipped with hatches with a lifting device located in front of and behind the sawmill frame and a transport device for moving the carts.

На фиг. 1 изображена описываема  лини , вид сбоку; на фиг. 2 - то же, вид в плане; на фиг. 3 - платформа с тележкой и подъемноопускным устройством, вид спереди.FIG. 1 shows the described line, side view; in fig. 2 - the same plan view; in fig. 3 - platform with a trolley and hoisting device, front view.

Лини  включает горизонтальную лесопильную раму }, тележки 2-4, подающий механизм 5, транспортирующее устройство 6 дл  перемещени  тележек, платформы 7 и 8, подъемноопускные устройства 9 и 10, люки 11, путь 12, по которому перемещаютс  тележки, рейки 13, шестерню 14, редуктор 15, ходовую часть 16 тележки и зажимы 17.The line includes a horizontal sawing frame}, carts 2-4, feeding mechanism 5, transporting device 6 for moving carts, platform 7 and 8, lift-lifting devices 9 and 10, hatches 11, path 12 along which carts move, rails 13, gear 14 , gear 15, chassis 16 trucks and clamps 17.

Подающий механизм выполнен двухэтажным .The feeding mechanism is made of two floors.

Лини  работает следующим образом.Lini works as follows.

Платформа 8 подъемноопускным устройством W через люк 11 подаетс  в верхнее положение и устанавливаетс  на путь 12. Фанерный кр ж 18 грузитс  на тележку 2The platform 8 is lifted by the lifting device W through the hatch 11 to the upper position and is installed on the track 12. The plywood deck 18 is loaded onto the trolley 2

и крепитс  зажимами 17. Затем автоматически включаетс  редуктор 15, и тележка с помощью рейки 13 и шестерни 14 катитс  по пути. Она попадает в зону действи  непрерывно движущегос  подающего механизма 5,and fastened with clips 17. Then the gear 15 is automatically turned on, and the trolley rolls along the track with the help of the rail 13 and gear 14. It enters the zone of action of the continuously moving feed mechanism 5,

который перемещает тележку к лесопильной раме 1.which moves the cart to the saw-frame 1.

Освобожденна  платформа 8 подъемноопускным устройством автоматически опускаетс  в нижнее положение дл  приема очередной тележки.The freed platform 8 is automatically lowered to the lower position by means of a lift-down device to receive the next carriage.

По окончании распиловки механизм 5 подает тележку по совмещенному пути 12 на платформу 7. С входом в зацепление рейки 13 и шестерни 14 включаетс  редуктор 15, и тележка полностью перемещаетс  на эту платформу до упора.At the end of the sawing, the mechanism 5 feeds the trolley along a combined path 12 to the platform 7. With the engagement of the rack 13 and gear 14, the gearbox 15 is turned on, and the cart is completely moved onto this platform until it stops.

Когда тележка останавливаетс , то горбыль 19 снимаетс  и зажимы 17 освобождаютс . Фанерный кр ж переворачиваетс  иWhen the cart stops, the slab 19 is removed and the clips 17 are released. The plywood slide turns over and

крепитс  зажимами 17. Затем включаетс  подъемноопускное устройство 9, и платформа 7 с тележкой через люк // опускаетс  до совмещени  пути 12 с транспортирующим устройством 6. Автоматически включаетс  редуктор 15, и тележка 2 с помощью рейки 13 иfastened with clamps 17. Then the lifting device 9 is turned on, and the platform 7 with the cart through the hatch // is lowered until the track 12 is aligned with the transport device 6. The gearbox 15 is automatically turned on, and the cart 2 with the rail 13 and

шестерни 14 подаетс  по совмещенному пути 12 в зону действи  транспортирующего устройства .gear 14 is fed along a combined path 12 to the zone of operation of the conveying device.

Освобожденеа  платформа 7 подъемноопускным устройством 9 передвигаетс  в верхнее положение дл  приема очередной тележки .The freed platform 7 is lifted by the lifting device 9 to the upper position for receiving the next carriage.

Транспортирующее устройство 6 подает тележку 2 на платформу 8.The transport device 6 delivers the trolley 2 to the platform 8.

С входом в зацепление рейки 13 и шестерни 14 включаетс  редуктор 15, и тележка 2 подаетс  на платформу 8 до упора.With the engagement of the rail 13 and gear 14, the gear 15 is turned on, and the carriage 2 is fed to the platform 8 up to the stop.

Тележка 2 останавливаетс , автоматически включаетс  подъемноопускное устройство 10, и платформа 8 с тележкой 2 через люк // поднимаетс  и устанавливаетс  на путь 12.The cart 2 is stopped, the lifting device 10 is automatically turned on, and the platform 8 with the cart 2 through the hatch // is lifted and mounted on the path 12.

Далее весь процесс повтор етс .Further, the whole process is repeated.

В работе линии участвуют несколько тележек (2, 3, 4). Во врем  погрузки фанерного кр жа IS на тележку 2, освобожденна  платформа 7 подъемноопускным устройством 9 поднимаетс  дл  приема тележки 3, а тележка 4 подаетс  транспортирующим устройством 6 к платформе 8.In the work of the line involved several trucks (2, 3, 4). During the loading of the plywood IS edge onto the trolley 2, the freed platform 7 is lifted by the lifting device 9 to receive the trolley 3, and the trolley 4 is fed by the transporting device 6 to the platform 8.

С подачей тележки 2 на распиловку фанерного кр жа, освобожденна  платформа SWith the filing of the trolley 2 for sawing plywood, the platform S is released

подъеМНоопускным устройством 10 через люк // автоматически опускаетс  и принимает на себ  тележку 4, а платформа 7 принимает на себ  тележку 3.the lift device 10 through the hatch // is automatically lowered and takes the trolley 4 on itself, and the platform 7 takes on the trolley 3.

В процессе распиловки «а тележке 2 фанерного кр жа платформа 8 с тележкой 4 поднимаетс , а платформа 7 с тележкой 3 опускаетс . По окончании распиловки фанерного кр жа тележка 2 подаетс  на возвратившуюс In the process of cutting, the cart 8 with the cart 4 rises and the platform 7 with the cart 3 goes down in the cart 2 of the plywood board. At the end of the cutting of the plywood, the trolley 2 is fed to the returned

в верхнее положение платформу 7/ тележка 3 - на возвратившуюс  в нижнее положение платформу 8, а тележка 4 - к лесопильной раме.in the upper position, the platform 7 / trolley 3 is on the platform 8 that has returned to the lower position, and the trolley 4 is towards the saw-frame.

Предмет изобретени Subject invention

Лини  дл  производства ванчесов, включающа  горизонтальную лесопильную раму, тележку с подающим механизмом, отличающа с  тем, что, с целью повышени  производительности линии, подающий механизм выполнен двухэтажным с несколькими тележками и снабжен люками с подъемноопускным устройством , расположенными перед лесопильнойA line for the production of vanches, including a horizontal sawing frame, a trolley with a feeder mechanism, characterized in that, in order to increase the productivity of the line, the feeder mechanism is made two-storeyed with several trolleys and provided with hatches with a lifting device located in front of the sawmill

рамой и за ней, а также транспортирующим устройством дл  перемещени  тележек.frame and beyond, as well as a transporting device for moving carts.

3 У3 y

3 J63 J6

1313

77 2 13 1277 2 13 12

SU1695608A 1971-08-24 1971-08-24 VANCHES PRODUCTION LINE SU372062A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1695608A SU372062A1 (en) 1971-08-24 1971-08-24 VANCHES PRODUCTION LINE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1695608A SU372062A1 (en) 1971-08-24 1971-08-24 VANCHES PRODUCTION LINE

Publications (1)

Publication Number Publication Date
SU372062A1 true SU372062A1 (en) 1973-03-01

Family

ID=20487396

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1695608A SU372062A1 (en) 1971-08-24 1971-08-24 VANCHES PRODUCTION LINE

Country Status (1)

Country Link
SU (1) SU372062A1 (en)

Similar Documents

Publication Publication Date Title
US3080042A (en) Lumber feeder for random lengths and widths
GB2170787A (en) Sheet feeding & stack handling apparatus
US3393812A (en) Lumber stacking machine
DE2855870C3 (en) Device for placing film sections on chipboard
SU372062A1 (en) VANCHES PRODUCTION LINE
JP2019137513A (en) Transport work facility
US3687269A (en) Apparatus for edging and resawing lumber
JPH02147520A (en) Method and device for transference
JPS58141819A (en) Device for mounting plate-material in material feeding
US3260335A (en) Conveyor transfer assembly
GB1269012A (en) A machine for cutting panels
JPH06144510A (en) Pallet transporting device of laser beam machining system
JP2001097546A (en) Quick traverse mechanism for hybrid carrier
FR2387882A1 (en) Package handling equipment for loading pallets - has beams to lift package for pallet to be inserted from below
JPH01118328A (en) Work transfer device
GB1424426A (en) Goods vehilce equipped with load-carrying apparatus
US3050175A (en) Apparatus for edge spacing structurally stable sheets
US2832379A (en) Log deck and turning mechanism for log saw mills
US2948418A (en) Material handling apparatus
JPS634044Y2 (en)
JPH0322180Y2 (en)
JPS6238988Y2 (en)
CN117002950A (en) Unmanned automatic loading system capable of automatically loading cargoes
SU479702A1 (en) "Piece goods transfer
SU1123982A1 (en) Hoisting gear