SU1701829A1 - Pile driving mechanism - Google Patents

Pile driving mechanism Download PDF

Info

Publication number
SU1701829A1
SU1701829A1 SU894704361A SU4704361A SU1701829A1 SU 1701829 A1 SU1701829 A1 SU 1701829A1 SU 894704361 A SU894704361 A SU 894704361A SU 4704361 A SU4704361 A SU 4704361A SU 1701829 A1 SU1701829 A1 SU 1701829A1
Authority
SU
USSR - Soviet Union
Prior art keywords
guide tube
shaft
frame
piling
window
Prior art date
Application number
SU894704361A
Other languages
Russian (ru)
Inventor
Петр Петрович Супрун
Original Assignee
Хабаровский институт инженеров железнодорожного транспорта
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Хабаровский институт инженеров железнодорожного транспорта filed Critical Хабаровский институт инженеров железнодорожного транспорта
Priority to SU894704361A priority Critical patent/SU1701829A1/en
Application granted granted Critical
Publication of SU1701829A1 publication Critical patent/SU1701829A1/en

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

Изобретение относитс  к механизации свайных работ, в частности к устройствам дл  погружени  свай ударной нагрузкой Целью изобретени   вл етс  повышение производительности Устройство включает направл ющую трубу 1, внутри которой размещена ударна  часть 17,св занна  с приводом в виде мотор-редуктора 19. соединенного с рычэжно-храповым механизмом . Направл юща  труба снабжена опорной рамой 29. с диаметрально противоположных сторон направл ющей трубы вы полнены охватывающие храповые колеса 24 П - образные поводки 25, ребра которых сво - бодно установлены на валу механизма, полки шарнирно св заны с рамой 29, а шабот 6 выполнен с центральной сквозной проточкой , в которой размещены боек 11 и смен - ные вкладыши 12 При этом нижн   часть направл ющей трубы выполнена с окном 34 дл  установки вкладышей 12 2 илThe invention relates to the mechanization of piling operations, in particular to devices for piling shock loads. The aim of the invention is to increase productivity. The device includes a guide tube 1, inside which is placed the impact part 17 connected to the drive in the form of a gear motor 19. connected to the lever -raper mechanism. The guide tube is provided with a supporting frame 29. The covering ratchet wheels 24 are fitted on the diametrically opposite sides of the guide tube. The U-shaped leads 25, the edges of which are freely mounted on the mechanism shaft, the shelves are hinged to the frame 29, and the steps 6 are made with The central through groove in which the firing pin 11 and interchangeable inserts 12 are placed. The lower part of the guide tube is made with a window 34 for installing the inserts 12 2 or

Description

Изобретение относитс  к механизации свайных работ, в частности к устройствам дл  погружени  свай ударной нагрузкойThis invention relates to the mechanization of piling, in particular to devices for piling with shock load.

Целью изобретени   вл етс  повышение производительностиThe aim of the invention is to increase productivity

На фиг 1 изображено устройство дл  забивки свай, на фиг 2 то же, вид сбокуFIG. 1 shows a device for driving piles; FIG. 2 is the same, side view.

Устройство включает направл ющую трубу 1 с жестко установленной на ней панелью 2 и двум  ползунами 3, 4, которыми труба навешиваетс  на направл ющую 5 копра (на чертеже не показан), гидравлический шабот, состо щий из соответственно шабота 6 со сквозной центральной проточкой цилиндра 7 с дроссельными отверсти ми 8, жестко установленного на днище шабота , поршн  9, шток 10 которого заведен в проточку шабота, бойка 11 и вкладыша 12 свободно установленных в проточке шабота над штоком 10, возвратной пружины 13 и масл ного бака 14 с рабочей жидкостью 15 Устройство также содержит наголовник 16, ударную часть 17с пружинным демпфером 18, привод ударной части, состо щий из мотор-редуктора 19, головного вала 20. ко нической пары зубчатых колес из которых колесо 21 жестко установлено на выходном валу мотор-редуктора 19, а колесо 22 - на валу 20, подшипников 23, с помощью которых вал 20 установлен на панеле 2 двухThe device includes a guide pipe 1 with a panel 2 fixed on it and two sliders 3, 4, with which the pipe is hung on the copra guide 5 (not shown in the drawing), a hydraulic joint consisting respectively of work 6 with a through central groove of the cylinder 7 with choke holes 8 fixed on the bottom of the shaft, the piston 9, the rod 10 of which is inserted into the groove of the hammer, the striker 11 and the liner 12 are freely installed in the shaft of the rod 10 above the rod 10, the return spring 13 and the oil tank 14 with the working fluid 15 Set The simulator also contains a headgear 16, a shock part 17c with a spring damper 18, an impact drive consisting of a gearmotor 19, a head shaft 20. A conical pair of gears of which wheel 21 is rigidly mounted on the output shaft of gearmotor 19, and the wheel 22 - on the shaft 20, bearings 23, with the help of which the shaft 20 is mounted on the panel 2 two

о about

0000

ю юyu yu

храповых колес 24, жестко закрепленных на валу 20, двух поводков 25, установленных на валу 20 с возможностью свободного вращени  относительно оси последнего, двух собачек 26, расположенных с помощью осей 27 на поводках 25 и подпружиненных относительно последних с помощью пластин 28, опорной рамы 29, концы которой шарнирно установлены на поводках 25 с помощью пальцев 30, головного блока 31, установленного на площадке 32, котора  жестко закреплена на трубе 1, и подъемного каната 33, один конец которого закреплен на раме 29, а другой через демпфер 18 соединен с молотом 17.ratchet wheels 24 fixed on the shaft 20, two leads 25 mounted on the shaft 20 with the possibility of free rotation about the axis of the latter, two dogs 26 arranged with axes 27 on the leads 25 and spring-loaded relative to the latter using plates 28, support frame 29 , the ends of which are hinged on the leads 25 with the help of fingers 30, the head unit 31 mounted on the platform 32, which is rigidly fixed on the pipe 1, and the lifting rope 33, one end of which is fixed on the frame 29, and the other end is connected to the damper 18 hammer 17.

При этом нижн   часть трубы 1 выполнена с окном 34.The lower part of the pipe 1 is made with a window 34.

Устройство работает следующим образом .The device works as follows.

После заводки и закреплени  сваи 35 в наголовнике 16 включаетс  в работу мотор- редуктор 19, в результате чего получает вращение вал 20 и храповые колеса 24, с помощью которых через собачки 26 поводки поворачиваютс  до тех пор, пока не окажутс  в крайнем нижнем положении, где под действием массы ударной части 17 (через канат 33 и раму 29) их скорость вращени  становитс  большей, чем скорость вращени  вала 20, и рабоча  св зь собачек 26 с храповыми колесами 24 прерываетс , что сопровождаетс  свободным падением ударной части 17 до соударени  с шаботом.After winding up and fastening the pile 35 in the headgear 16, the gearmotor 19 is activated, resulting in rotation of the shaft 20 and the ratchet wheels 24, through which the dogs turn the dogs through the pawls 26 until they are in the lowest position where under the action of the mass of the striking part 17 (through the rope 33 and the frame 29) their rotational speed becomes greater than the rotational speed of the shaft 20, and the working connection of the dogs 26 with the ratchet wheels 24 is interrupted, which is accompanied by the free fall of the striking part 17 before the impact with the hammer.

Крайнее нижнее положение ударной части совпадает с крайним верхним положе нием и в этот момент собачки 26 приход т в зацепление с храповыми колесами 24 и поводки поворачиваютс  с помощью вала 20, поднима  ударную часть дл  повторного удараThe lowermost position of the impact part coincides with the extreme upper position and at this moment the pawls 26 are engaged with the ratchet wheels 24 and the leashes are turned with the help of the shaft 20, raising the impact part to re-strike

Соударение ударной части с шаботом осуществл етс  в две фазы.The impact of the impact part with the work is carried out in two phases.

Вначале ударна  часть 17 приходит в контакт с бойком 11, в результате чего происходит совместное перемещение ударной части, бойка 11, вкладыша 12 и штока 10 с поршнем 9 относительно шабота 6 и цилиндра 7 до тех пор, пока боек не утопитс  заподлицо с верхней частью шабота 6.Initially, the striker part 17 comes into contact with the striker 11, as a result of which the striking part, striker 11, liner 12 and piston rod 10 with piston 9 move together with cylinder 6 and cylinder 7 until the hammer is flush with the upper part of the beam. 6

В этой фазе происходит постепенно нарастание нагрузки на сваю через рабочуюIn this phase, the load on the pile is gradually increasing through the working

жидкость 15, котора  из-под поршн  9 через дроссельные отверсти  вытесн етс  в масл ный бак 14, чем достигаетс  постепенное преодолени  инерции поко  системы грунт- сва , а следовательно, предупреждаетс fluid 15, which is pushed out of the piston 9 through throttle openings into the oil tank 14, thus achieving gradual overcoming of the inertia of the rest of the soil-pile system, and therefore, warns

разрушение бетона в оголове сваи.the destruction of concrete in the pile head.

После того как боек 11 полностью утоплен в шабот 6 происходит пр мой удар через жесткую систему шабот-цилиндр-наголовник .After the face 11 is completely sunk into the head 6, there is a direct blow through the rigid head-cylinder-head system.

При подъеме ударной части поршень с помощью пружины 13 возвращаетс  в исходное положение, вследствие чего рабоча  жидкость из бака 14 засасываетс  через отверсти  8 под поршень 7.When raising the impact part, the piston is returned to its original position by means of the spring 13, as a result of which the working fluid from the tank 14 is sucked through the holes 8 under the piston 7.

Регулирование жесткости удара, т. е. продолжительности первой фазы соударени , осуществл етс  подбором и установкой между бойком 11 и штоком 10 вкладышей 12 соответствующей высоты через окно 35 в трубе 1.Adjustment of the impact stiffness, i.e., the duration of the first phase of the impact, is carried out by selecting and installing between the driver 11 and the stem 10 of the liners 12 of the appropriate height through the window 35 in the pipe 1.

Claims (1)

Формула изобретени Invention Formula Устройство дл  забивки свай, содержащее направл ющую трубу, внутри которой размещена ударна  часть, привод последней в виде мотор-редуктора, соединенного с рычажно-храповым механизмом, и гидравлический шабот, отличающеес  тем, что.A device for driving piles, containing a guide tube, inside which the hammer part is located, the drive of the latter in the form of a gear motor connected to a lever-ratchet mechanism, and a hydraulic joint, characterized in that. с целью повышени  производительности, направл юща  труба снабжена опорной рамой, с диаметрально противоположных сторон направл ющей трубы выполнены охватывающие храповые колеса механизма П-образные поводки с подпружиненными собачками, ребра которых свободно установлены на валу механизма, а полка шарнирно св зана с рамой, шабот выполнен с центральной сквозной проточкой, в которойin order to increase productivity, the guide tube is provided with a support frame, with diametrically opposite sides of the guide tube are made covering the ratchet gears of the mechanism U-shaped leashes with spring-loaded dogs, the ribs of which are freely mounted on the shaft of the mechanism, and the shelf is hinged to the frame, the steps are made with a central through groove in which размещены боек и сменные вкладыши, при этом нижн   часть направл ющей трубы выполнена с окном дл  установки вкладышей.the firing pin and replaceable liners are placed, while the lower part of the guide tube is provided with a window for installing liners. J/J / Фиг1Fig1
SU894704361A 1989-06-14 1989-06-14 Pile driving mechanism SU1701829A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894704361A SU1701829A1 (en) 1989-06-14 1989-06-14 Pile driving mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894704361A SU1701829A1 (en) 1989-06-14 1989-06-14 Pile driving mechanism

Publications (1)

Publication Number Publication Date
SU1701829A1 true SU1701829A1 (en) 1991-12-30

Family

ID=21453806

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894704361A SU1701829A1 (en) 1989-06-14 1989-06-14 Pile driving mechanism

Country Status (1)

Country Link
SU (1) SU1701829A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР Ne 1079758, кл.Е 02 D7/08, 1981. Авторское свидетельство СССР № 656957, кл. В 66 D 1/04, 1972. *

Similar Documents

Publication Publication Date Title
US5154539A (en) Foundation lifting and stabilizing apparatus
US6543966B2 (en) Drive system for inserting and extracting elongate members into the earth
CN110080557A (en) A kind of wall dismounting device
US5752571A (en) Apparatus for generating impacts
CN1051066A (en) Hydraulic pressure step-type pile driver
SU1701829A1 (en) Pile driving mechanism
CN202451051U (en) Casing drilling machine while drilling for casing pile construction method while drilling
CN100335735C (en) Impact force generator
US3651873A (en) Impacting apparatus for driving convertible to pulling
US4036310A (en) Lining for a pile driving head and method and tool for the removal of said lining
CN206457226U (en) A kind of town road cesspool cover plays lid arrangement automatically
CN214738042U (en) Pile driver for civil engineering
DE102006014292B4 (en) piling plant
CN220450847U (en) Pile driving device for constructional engineering
NL9101294A (en) METHOD AND APPARATUS FOR DRIVING PIPES
JPS6233818Y2 (en)
SU1383247A1 (en) Seismic signal source
CN212561514U (en) Constructional engineering pile device
JPS6131069Y2 (en)
RU2029026C1 (en) Rammer for formation of foundation pit
SU1084365A1 (en) Working member to machine for compacting soil
RU2147642C1 (en) Ground compaction device
CN215629940U (en) Piling device for construction engineering construction
RU2246586C1 (en) Rotary pile-driving hammer
GB2367322A (en) Hydraulic pile driving for long piles