SU1681273A1 - Method for checking gas composition of mine atmosphere - Google Patents
Method for checking gas composition of mine atmosphere Download PDFInfo
- Publication number
- SU1681273A1 SU1681273A1 SU894756340A SU4756340A SU1681273A1 SU 1681273 A1 SU1681273 A1 SU 1681273A1 SU 894756340 A SU894756340 A SU 894756340A SU 4756340 A SU4756340 A SU 4756340A SU 1681273 A1 SU1681273 A1 SU 1681273A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- gas
- tube
- air
- established
- booster
- Prior art date
Links
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
Изобретение относитс к области разработки угольных месторождений подземным способам и может быть использовано при ведении работ в шахтах с посто нным контролем состава атмосферы в горных выработках . На входе в блок газоанализаторов поддерживаетс посто нное давление воздуха при переключении с одного канала на другой, в результате чего отсутствуютпере- ходные процессы в газовом тракте анализаторов . Посто нство давлени достигаетс путем выравнивани аэродинамических характеристик пробоотборных линий между собой. Таким образом, расход воздушной смеси в каждой линии одинаков, а также броски давлени при переключении каналов . 1 ил.The invention relates to the development of coal deposits by underground methods and can be used when working in mines with constant control of the composition of the atmosphere in mining. A constant air pressure is maintained at the entrance to the gas analyzer unit when switching from one channel to another, as a result of which there are no transition processes in the gas path of the analyzers. The pressure is achieved by aligning the aerodynamic characteristics of the sampling lines with each other. Thus, the flow rate of the air mixture in each line is the same, as well as the pressure surges when switching channels. 1 il.
Description
Изобретение относитс к аналитическому контролю газового состава, например, с помощью термохимических датчиков и может быть использовано на угольных шахтах и рудниках дл анализа состава воздуха в горных выработках, бункерах и других сооружени х и помещени х в горно-рудной и других отрасл х народного хоз йства.The invention relates to the analytical control of the gas composition, for example, using thermochemical sensors and can be used in coal mines and mines to analyze the composition of air in mines, bunkers and other structures and premises in mining and other folk industries. .
Цель изобретени - повышение надежности и достоверности контрол газового состава рудничной атмосферы.The purpose of the invention is to increase the reliability and reliability of monitoring the gas composition of the mine atmosphere.
На чертеже представлена блок-схема системы отбора, транспортировани и анализа газовых труб.The drawing shows a block diagram of a system for collecting, transporting and analyzing gas pipes.
Способ заключаетс в непрерывном дистанционном отборе и транспортировании на центральный пункт проб шахтного воздуха по воздухоотборным каналам параллельно работающими газоаналитическим иThe method consists in continuous remote sampling and transportation to the central point of mine air samples through the air sampling channels in parallel with gas analytical and
байпэсным побудител ми. Газоэналитиче- ский побудитель по заданной программе осуществл ет отбор, транспортирование и подачу на анализ газовой пробы в каждый текущий момент времени из одной точки контрол , а байпасный производит отбор и транспортирование газовых проб из остальных точек контрол , обеспечива за цикл опрос всех точек контрол . Номинальное рабочее разрежение побудителей устанавливают , исход из услови Bypassed promptings. According to a predetermined program, the gas-analyzer booster selects, transports and submits the gas sample for analysis at each current time from one control point, and the bypass one selects and transports gas samples from the remaining control points, ensuring that all control points are polled during the cycle. The nominal operating vacuum of the boosters is established, based on
и u 4 а 1трмаксчу2and u 4 a 1trmakschu2
Иб - г1г.-jVonr,Ib - g1g. - jVonr,
ОтрOTR
где Нб - разрежение, создаваемое байпас- ным побудителем, кг/м2;where Nb is the vacuum created by the bypass booster, kg / m2;
Нга - разрежение, создаваемое газоаналитическим побудителем, кг/м2;Nga - the vacuum created by the gas analytic booster, kg / m2;
ос-коэффициент аэродинамического сопротивлени трубки, кг см /м4 OS-coefficient of aerodynamic drag of the tube, kg cm / m4
О 00About 00
юYu
XIXi
соwith
I - длина трубки, отбирающей пробу из точки контрол , самой удаленной от центрального пункта, м;I is the length of the tube sampling from the control point furthest from the central point, m;
dip - внутренний диаметр этой трубки, м;dip - internal diameter of this tube, m;
Vonr - скорость газового потока в трубке , соответствующа оптимальному значению расхода пробы через блок газоанализаторов, м/с, объемные расходы в каждом канале устанавливают, поочередно подключа при полностью открытых ротаметрах трубки к газоаналитическому насосу , определ ют канал с минимальным объемным расходом воздуха и устанавливают соответствующий минимальный расход во всех остальных каналах, поочередно подключа их к газоаналитическому насосу.Vonr - the gas flow rate in the tube corresponding to the optimal sample flow rate through the gas analyzer unit, m / s, the volumetric flow rate in each channel is established, alternately connected with fully open tube rotameters to the gas analysis pump, the channel with the minimum volumetric air flow is established and the corresponding minimum flow in all other channels, alternately connecting them to the gas analysis pump.
Система, с помощью которой осуществл етс способ, состоит из заборных устройств 1, 2, 3. воздухоотборных линий 4, 5, 6, число которых соответствует количеству точек контрол , индивидуальных воздушных дросселей 7,8 и 9 с ротаметрами и трехходовых электропневмоклапанов 10, 11 и 12, по одному на каждую линию, байпасного коллектора 13 и газоаналитического коллектора 14, вакуумметров 15 и 16, воздушного дроссел 17 с ротаметром байпасного побудител 18, дроссел 19 газоаналитического побудител 20, блока 21 газоанализаторов и коммутатора 22, управл ющего работой всей системы. При работе установки на 30 точках контрол воздух по 29 лини м поступает через заборное устройство (на чертеже показаны только два-1, 2), представл ющие собой металлические наконечники с пылефильтрами, затем проходит по воздухоотборным лини м, например, по полиэтиленовым пневмотрубкам, проложенным в горных выработках, на поверхность шахты, где проходит через воздушные дроссели 7 и 8, с помощью которых осуществл етс регулирование объемного расхода воздуха, и через пневмоклапаны 10 и 11, предназначенные дл осуществлени коммутации воздушных потоков, попадает в байпасный коллектор, представл ющий собой объемный резервуар 13. Затем через дроссель 17 байпасного побудител , с помощью которого регулируетс расход воздушной смеси, приходит к байпасному побудителю, который представл ет из себ ваккумный насос, создающий необходимое раздражение в системе. После прохождени байпасного побудител воздух удал етс в атмосферу. По тридцатой линии от заборного устройства 3 воздух транспортируетс также по полиэтиленовой пневмот- рубке, проходит через дроссель 9 и попадает в пневмоклапэн 12, далее в коллектор 14,из которого проходит через дроссель 19 газоаналитического побудител , и с помощью побудител 20, вл ющегос вакуумным насосом производительностью ( вThe system with which the method is carried out consists of intake devices 1, 2, 3. air sampling lines 4, 5, 6, the number of which corresponds to the number of control points, individual air chokes 7.8 and 9 with rotameters and three-way electropneumatic valves 10, 11 and 12, one for each line, a bypass collector 13 and a gas analysis manifold 14, vacuum gauges 15 and 16, an air throttle 17 with a rotameter bypass booster 18, a throttle 19 for a gas analytic booster 20, a unit 21 of gas analyzers and a switch 22 controlling the operation oh the whole system. When the unit is operated at 30 control points, the air through 29 lines enters through the intake device (only two -1, 2 are shown in the drawing), which are metal tips with dust filters, then passes through the air bleed lines, for example, through polyethylene air tubes laid in the mine workings, to the surface of the mine, where it passes through air throttles 7 and 8, by means of which the volume flow of air is controlled, and through pneumatic valves 10 and 11, intended for switching air fluxes enters the bypass manifold, which is a bulk storage tank 13. Then, through the bypass choke 17 stimulus by which controlled flow air mixture is brought to bypass stimulus, which is of SEB Vakkumnye pump creates the necessary system irritation. After passing the bypass drive, the air is vented to the atmosphere. On the thirtieth line from the intake device 3, the air is also transported through a polyethylene pneumatic bushing, passes through the choke 9 and enters the pneumatic valve 12, then into the collector 14, from which it passes through the throttle 19 of the gas analytic booster, and with the help of the booster 20, which is a vacuum pump performance (in
данном случае) равной 1 /30 производительности байпасного побудител , попадает в блок 21 газоанализаторов, где и анализируетс , после чего удал етс в атмосферу. Далее через интервал времени (5 мин)in this case, equal to 1/30 of the performance of the bypass booster, enters the gas analyzer unit 21, where it is analyzed, and then removed to the atmosphere. Then after a time interval (5 min)
пневмоканал 29-й линии переключаетс на газоаналитический побудитель, и воздух уже из этого канала поступает на анализ. А 30-й пневмоклапан переключаетс на байпасный побудитель (насос). Последовательное переключение клапанов осуществл етс с помощью электронного коммутатора 22, а контроль разрежени воздуха в системе - вакуумметрами .The 29th line pneumatic canal switches to a gas analyzer booster, and air is already coming from this channel for analysis. And the 30th pneumatic valve switches to the bypass booster (pump). The sequential switching of the valves is carried out with the help of an electronic switch 22, and the control of the vacuum of the air in the system is carried out with vacuum gauges.
Дл исключени переходных процессов в газоанализаторах при переключении каналов необходимо поддерживать посто нное давление на входе в блок газоанализаторов , что достигаетс путем выравнивани аэродинамических характеристик каналов.To eliminate transients in gas analyzers when switching channels, it is necessary to maintain a constant pressure at the inlet to the gas analyzer unit, which is achieved by equalizing the aerodynamic characteristics of the channels.
Дл этого каждый из них подключают при полностью открытых дроссел х 7, 8 и 9 ротаметров к газоаналитическому побудителю 20. Определив номер канала с максимальным сопротивлением и расход воздуха по нему,To do this, each of them is connected with fully open throttles x 7, 8 and 9 rotameters to a gas analyzer booster 20. Having determined the channel number with maximum resistance and air flow through it,
подключают последующие каналы к газоаналитическому побудителю. Измен сопротивление воздушных дросселей, подбирают расход воздуха в каждом канале, равный расходу воздуха в канале с максимальным сопротивлением.connect the subsequent channels to the gas analyzer. Changing the resistance of air chokes, select the air flow in each channel, equal to the air flow in the channel with maximum resistance.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894756340A SU1681273A1 (en) | 1989-08-23 | 1989-08-23 | Method for checking gas composition of mine atmosphere |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894756340A SU1681273A1 (en) | 1989-08-23 | 1989-08-23 | Method for checking gas composition of mine atmosphere |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1681273A1 true SU1681273A1 (en) | 1991-09-30 |
Family
ID=21478161
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU894756340A SU1681273A1 (en) | 1989-08-23 | 1989-08-23 | Method for checking gas composition of mine atmosphere |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1681273A1 (en) |
-
1989
- 1989-08-23 SU SU894756340A patent/SU1681273A1/en active
Non-Patent Citations (1)
Title |
---|
Правила безопасности в угольных и сланцевых шахтах. М.: Недра, 1986, с. 64-68. Dalverny L E., Fink Z. G., Weluhelmer G. P. Continions gas monitoring using tube bundles at the graune Mine fire. Bureau of Mines Coal Mine Health and Safety Programe. - Technical Progress Report 92 June 1975. p. 24-26. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101832888B (en) | Automatic multi-path persistent gas-supply optional sampling device | |
CN201191278Y (en) | Polypropylene on-line gas analysis system | |
CN106644620B (en) | Detachable multifunctional gas automatic acquisition method and device | |
CN103308649A (en) | Multi-channel multi-component stationary source sampling and analysis system | |
CN203053947U (en) | Multi-channel multi-component fixed source sampling analysis device | |
CN102128894A (en) | Online analytical chromatograph and chromatographic detection method for gases in insulating oil | |
CN104931615A (en) | Device and method for analyzing trace impurities in gas | |
CN103245762A (en) | Flue gas distribution measuring device and method of SCR (Selective Catalytic Reduction) flue gas denitration system | |
CN201945580U (en) | Online analysis chromatograph for gas in insulating oil | |
CN214408245U (en) | Multi-channel automatic time sequence sampling system | |
US4399688A (en) | Air pollution detection | |
SU1681273A1 (en) | Method for checking gas composition of mine atmosphere | |
US6637277B2 (en) | Fluid sampling device | |
CN202305489U (en) | Chromatographic instrument for detecting failure of SF6 electric equipment | |
CN104729892A (en) | PM2.5 (Particulate Matter 2.5) source analyzing and sampling device based on multichannel parallel feedback control | |
CN102445498B (en) | Automatic calibration method of process chromatograph | |
US5834656A (en) | Sampling interface for continuous monitoring of emissions | |
CN108776194B (en) | Analysis device and gas analyzer | |
CN2431565Y (en) | Industrial gas phase chromatography sampler | |
CN207832762U (en) | A kind of gas measurement device and its measuring system | |
CN105092301A (en) | Automatic online sampling and conveying technology for granular material | |
CN109991364A (en) | Gas measurement device and its measuring system | |
CN218628853U (en) | On-line automatic switching circulation detection system for leakage of membrane separator | |
CN207488249U (en) | For the air source filter device of the chromatograph of oil exploration | |
CN217059605U (en) | Coal gasifier analytical instrument multi-flow path pretreatment system |