SU1681111A1 - Complex for mounting process pipe lines - Google Patents

Complex for mounting process pipe lines Download PDF

Info

Publication number
SU1681111A1
SU1681111A1 SU884486688A SU4486688A SU1681111A1 SU 1681111 A1 SU1681111 A1 SU 1681111A1 SU 884486688 A SU884486688 A SU 884486688A SU 4486688 A SU4486688 A SU 4486688A SU 1681111 A1 SU1681111 A1 SU 1681111A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pipeline
supports
mounting
construction
installation
Prior art date
Application number
SU884486688A
Other languages
Russian (ru)
Inventor
Николай Николаевич Выбыванец
Павел Николаевич Слюсарчук
Алим Петрович Андриевский
Наталья Егоровна Губенко
Original Assignee
Донецкий Филиал Института "Атомэнергостройпроект"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Донецкий Филиал Института "Атомэнергостройпроект" filed Critical Донецкий Филиал Института "Атомэнергостройпроект"
Priority to SU884486688A priority Critical patent/SU1681111A1/en
Application granted granted Critical
Publication of SU1681111A1 publication Critical patent/SU1681111A1/en

Links

Abstract

Изобретение относитс  к строительству и может быть использовано при сооружении технологических трубопроводов брызгаль- ных установок систем охлаждени  турбинного оборудовани . Цель изобретени  снижение трудозатрат и сроков монтажа технологических трубопроводов. Комплекс обеспечивает сооружение из секций 1 трубопровода , опирающегос  на сваи 2 посредством чередующихс  посто нных опор и монтажных опор, расположенных выше уровн  посто нных опор. Монтаж и сварку секций ведут на монтажной площадке в ви-, де плетевода-кондуктора 5, а наращиваемый трубопровод проталкивают по монтажным опорам посредством плавучей опоры 11, выполненной в виде катамарана, трубопровод опускаетс  на посто нные опоры путем опускани  монтажных опор, которые выполнены в виде балансиров. Плавуча  опора 11 снабжена посадочным захватом трубопроводной секции 1 и перемещаетс  по водоему посредством реверсивных лебедок. 1 з.п.ф-лы, 7 ил.The invention relates to the construction and can be used in the construction of technological pipelines of the spray installations of the cooling systems of turbine equipment. The purpose of the invention is the reduction of labor costs and the timing of installation of technological pipelines. The complex provides the construction of sections 1 of the pipeline supported on piles 2 by means of alternating fixed supports and mounting supports located above the level of the fixed supports. Installation and welding of sections are carried out on the assembly site in the V-de, pletevod-conductor 5, and the expandable pipeline is pushed through the mounting supports by means of a floating support 11 made in the form of a catamaran, the pipeline is lowered onto permanent supports by lowering the mounting supports balancers. The floating support 11 is provided with a landing gripper of the pipeline section 1 and is moved around the reservoir by means of reversible winches. 1 hp ff, 7 ill.

Description

Изобретение относится к строительству и может рыть использовано при сооружении технологических трубопроводов систем охлаждения брызгальных установок турбинного оборудования.The invention relates to the construction and can be used in the construction of technological pipelines of cooling systems for spraying turbine equipment.

Цель изобретения - снижение затрат и сроков монтажа технологических трубопроводов.The purpose of the invention is to reduce the cost and time of installation of technological pipelines.

На фиг.1 показана схема монтажа трубопроводов, вид сверху; на фиг.2 - то же, вид сбоку; на фиг.З - вид А на фиг.2; на фиг.4 - разрез Б - Е> на фиг.З; на фиг.5 разрез В - В на фиг.1; на фиг.6- разрез Г Г на фиг.2; на фиг.7 -- узел I на фиг.2,Figure 1 shows the installation diagram of pipelines, a top view; figure 2 is the same side view; Fig. 3 is a view A in Fig. 2; figure 4 - section B - E> in fig.Z; in Fig. 5, section B - B in Fig. 1; Fig.6 is a section Г Г in Fig.2; in Fig.7 - node I in Fig.2,

Комплекс обеспечива.ет сооружение из секций 1 технологического трубопровода, опирающегося на сваи 2 посредством постоянных опор 3, чередующихся с монтажными опорами 4, расположенными выше уровня постоянных опор 3. В состав комп-’ лекса входит монтажная площадка в виде плетевода-кондуктора 5, снабженного приемопосадочными блоками 6 с наклонными роликами 7, положение которых регулируется винтом 8. Плетевод-кондуктор 5 имеет съемные монтажные площадки 9 и снабжен ограждением 10. Постоянные опоры 3 й монтажные опоры 4 монтируются посредством плавучей опоры 11 катамаранного типа, которая перемещается по водоему с помощью реверсивных лебедок 12,13 и 14 посредством канатов 15,16. Плавучая опора 11 снабжена понтонами 17, подъемной балкойThe complex provides for the construction of sections 1 of the technological pipeline, supported by piles 2 by means of permanent supports 3, alternating with mounting supports 4 located above the level of permanent supports 3. The complex includes an assembly platform in the form of a conductor 5 conduit 5, equipped with receiving and landing blocks 6 with inclined rollers 7, the position of which is regulated by screw 8. The conductor 5 braid is equipped with removable mounting pads 9 and is equipped with a guard 10. Permanent bearings 3rd mounting supports 4 are mounted by melt whose support 11 catamaran type which moves on a reservoir by means of reversible winches 12,13 and 14 via cables 15,16. The floating support 11 is equipped with pontoons 17, a lifting beam

18, перемещаемой винтовыми домкратами18 moved by screw jacks

19, и посадочным захватом 20 трубопроводной секции 1.19, and the landing gripper 20 of the pipeline section 1.

Плетевод-кондуктор 5 опирается на берег и ближайшую к нему сваю 2. Секции 1 мобильным краном 21 подаются на наклонные ролики 7 приемопосадочных блоков 6 плетевода-кондуктора 5, при этом конец секции 1 размещается в посадочном захвате 20 плавучей опоры 11, после чего она посредством лебедок 12,13 перемещается в направлении развертывания трубопровода. Плавучая опора 11 удерживается от сноса течением с помощью лебедки 14. При перемещении плавучая опора 11 проходит над монтажными опорами 4 и по мере наращивания секций 1 под воздействием возрастающего веса . трубопровода глубже погружается в воду до опирания трубопровода на монтажные опоры 4 балансирного типа. Перемещение плавучей опоры 11 прекращается, когда конец секции 1 переместится на сварочный пост плетевода-кондуктора 5, где осуществляется наращивание монтируемого трубопровода очередной секцией 1.The conductor whip 5 rests on the shore and the pile nearest to it 2. Sections 1 are moved by a mobile crane 21 to the inclined rollers 7 of the pick-up blocks 6 of the conductor 5 whip 5, while the end of the section 1 is placed in the landing gripper 20 of the floating support 11, after which it winches 12,13 moves in the direction of deployment of the pipeline. The floating support 11 is kept from drift by the current with the winch 14. When moving, the floating support 11 passes over the mounting supports 4 and as the sections 1 increase under the influence of an increasing weight. the pipeline is deeper immersed in water until the pipeline rests on the mounting supports 4 of the balancer type. The movement of the floating support 11 is stopped when the end of section 1 moves to the welding post of the wire-guide conductor 5, where the mounted pipeline is extended by the next section 1.

После окончания монтажа трубопровода монтажные опоры 4 опускаются и трубопровод укладывается на постоянные опоры 3, после чего монтажные опоры 4 демонтируются. Вслед за этим подводятся наклонные ролики 7, отсоединяются монтажные площадки плетевода-кондуктора 5, который выводят из-под трубопровода.After the installation of the pipeline, the mounting supports 4 are lowered and the pipeline is laid on the permanent supports 3, after which the mounting supports 4 are dismantled. Following this, the inclined rollers 7 are brought in, the mounting pads of the conductor 5, which are removed from under the pipeline, are disconnected.

Использование комплекса обеспечивает монтаж трубопроводов при наличии значительного перепада высот берегового участка трубопровода и участка трубопровода, размещенного на сваях.The use of the complex ensures the installation of pipelines in the presence of a significant difference in elevation of the coastal section of the pipeline and the section of the pipeline placed on piles.

Claims (2)

Формула изобретения пn 1. Комплекс для монтажа технологических трубопроводных коммуникаций, содержащий пролетное строение, плавающую опору, монтажную площадку, тяговую и удерживающие лебедки, грузоподъемное средство, роликовую опору, отличающийся тем, что, с целью снижения Трудозатрат, пролетное строение выполнено в виде заглубленных в дно водоема свай, на оголовках которых с чередованием и на разных уровнях установлены роликовые постоянные и монтажные опоры, а монтажная площадка снабжена плетеводом-кондуктором и размещена с опиранием на берег и ближайшую к нему сваю, при этом плавучая опора выполнена в виде катамарана и снабжена посадочным захватом трубопровода.1. A complex for the installation of technological pipeline communications, comprising a span, a floating support, an installation site, traction and holding winches, a lifting means, a roller support, characterized in that, in order to reduce labor costs, the span is made in the form of piles buried in the bottom of the reservoir , on the heads of which, with alternating and at different levels, roller fixed and mounting supports are installed, and the mounting platform is equipped with a conductor whip and placed with the bank on the shore and the nearest it pile, wherein the floating bearing is designed as a catamaran, and is provided with a mounting capture pipeline. 2. Комплекс по п.1,отличающийся тем, что монтажные роликовые опоры выполнены раздвижными, регулируемыми по высоте и размещены на верхнем относительно постоянных опор уровне.2. The complex according to claim 1, characterized in that the mounting roller bearings are sliding, adjustable in height and placed on the upper level relative to the constant bearings. Фиг. /FIG. / Фиг.5Figure 5 Г- ГG-D
SU884486688A 1988-09-26 1988-09-26 Complex for mounting process pipe lines SU1681111A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884486688A SU1681111A1 (en) 1988-09-26 1988-09-26 Complex for mounting process pipe lines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884486688A SU1681111A1 (en) 1988-09-26 1988-09-26 Complex for mounting process pipe lines

Publications (1)

Publication Number Publication Date
SU1681111A1 true SU1681111A1 (en) 1991-09-30

Family

ID=21401008

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884486688A SU1681111A1 (en) 1988-09-26 1988-09-26 Complex for mounting process pipe lines

Country Status (1)

Country Link
SU (1) SU1681111A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Энергетика и электрификаци . - Сери : Сооружение атомных электростанций. М.: 1987, вып.5. с.4-7. *

Similar Documents

Publication Publication Date Title
US4744697A (en) Installation and removal vessel
JP5264853B2 (en) Construction method of deck lifting work platform ship and offshore wind power generation facility
RU2140595C1 (en) Unit for vertical laying of pipe line in water basin (versions)
US8783478B2 (en) Hoisting crane and offshore vessel
NL2017937B1 (en) A wave-induced motion compensating crane for use on an offshore vessel, vessel and load transferring method
GB1562614A (en) Underwater hoisting and handling frames
KR20130113380A (en) Offshore wind turbine foundation, corresponding offshore wind turbine and method for their installation on site
KR20170018001A (en) Method for building a bridge and bridge-building apparatus
SU1681111A1 (en) Complex for mounting process pipe lines
CN210391496U (en) Special sinking ship for immersed tube tunnel
US3702539A (en) Method and apparatus for installing risers
US4284385A (en) Method and equipment for handling pipe mounted carriage
GB2156286A (en) Installation and removal vessel
US4662784A (en) Method of installing pipe strings through offshore drilling platforms already in place
CN212316874U (en) Sliding installation device for self-elevating drilling platform cantilever beam
JPH06322764A (en) Underwater concrete construction method and device thereof
FR2396127A1 (en) METHOD FOR IMPLEMENTING A TORCHER SUPPORT STRUCTURE FOR OIL PLATFORM
RU2055773C1 (en) Floating semi-submerged ice-resistant platform
JP2000265485A (en) Sinking device for underwater structure
EP2363340A1 (en) Method and installation for making a cut in a shipwreck
EP4183672A1 (en) Installation for the load-out into the water of a heavy load
JP4298879B2 (en) Water bottom transfer device and structure bottom water transfer method
CN210684703U (en) Adjusting device and pile equipment for pile
CN108071101B (en) Conduit frame lifting device and method for lifting conduit frame by using same
JPH1082062A (en) Immersion device of immersed tube