SU1657610A1 - Method of insulation of absorbing or water-bearing stratum - Google Patents

Method of insulation of absorbing or water-bearing stratum Download PDF

Info

Publication number
SU1657610A1
SU1657610A1 SU894718070A SU4718070A SU1657610A1 SU 1657610 A1 SU1657610 A1 SU 1657610A1 SU 894718070 A SU894718070 A SU 894718070A SU 4718070 A SU4718070 A SU 4718070A SU 1657610 A1 SU1657610 A1 SU 1657610A1
Authority
SU
USSR - Soviet Union
Prior art keywords
component
formation
plugging mixture
mixture
water
Prior art date
Application number
SU894718070A
Other languages
Russian (ru)
Inventor
Владимир Николаевич Поляков
Original Assignee
Красноярский филиал Сибирского научно-исследовательского института геологии, геофизики и минерального сырья
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Красноярский филиал Сибирского научно-исследовательского института геологии, геофизики и минерального сырья filed Critical Красноярский филиал Сибирского научно-исследовательского института геологии, геофизики и минерального сырья
Priority to SU894718070A priority Critical patent/SU1657610A1/en
Application granted granted Critical
Publication of SU1657610A1 publication Critical patent/SU1657610A1/en

Links

Abstract

Изобретение относитс  к нефтегазодобывающей пром-сти. Цель - повышение качества процесса изол ции. Дл  этого производ т обработку ствола в интервале поглощени  или водопро влени  гидромониторными стру ми первого компонента тампонирующей смеси. Смешение компонентов производ т прокачиванием первого компонента через турбулентный поток гидромониторной струи второго компонента при статическом положении колонны заливочных труб. Полученную тампонирующую смесь нагнетают в каналы пород пласта с расходом, создающим перепад давлени  на кровлю пласта, равный или больший 3,0 МПа. При этом расход жидкости поддерживают в пределах, достаточных дл  создани  перепада давлени  на кровлю изолируемого объекта, равного или большего 30 МПа Это интенсифицирует процесс отделени  из смеси воды затворени  и необратимого роста ее реологических свойств. 1 ил. ёThe invention relates to the oil and gas industry. The goal is to improve the quality of the insulation process. For this, the stem is treated in the range of absorption or water supply by jetting jets of the first component of the plugging mixture. The components are mixed by pumping the first component through the turbulent flow of the jetting jet of the second component at the static position of the filling pipe string. The resulting plugging mixture is injected into the channels of the formation rocks with a flow rate that creates a pressure drop across the top of the formation equal to or greater than 3.0 MPa. At the same time, the fluid flow rate is maintained within the limits sufficient to create a pressure drop over the roof of the insulated object equal to or greater than 30 MPa. This intensifies the process of separation from the mixture of mixing water and irreversible growth of its rheological properties. 1 il. yo

Description

Изобретение относитс  к нефтегазодобывающей промышленности, в частности к способам изол ции поглощающих или водо- про вл ющих пластов в скважинах различного назначени .The invention relates to the oil and gas industry, in particular to methods for isolating absorbing or water-producing formations in wells for various purposes.

Целью изобретени   вл етс  повышение качества процесса изол ции.The aim of the invention is to improve the quality of the insulation process.

На чертеже изображена схема осуществлени  предлагаемого способа изол ции.The drawing shows the scheme of the proposed insulation method.

В скважине 1 размещены заливочные трубы 2, продавочна  жидкость в заливочных трубах 2, промывочна  жидкость, заполн юща  скважину 1, первый компонент 5, размещаемый в заливочных трубах 2 и скважине 1. второй компонент 6 смеси о колонне заливочных труб 2, гидромониторна  головка 3, поглощающий пласт 4. зоны 7 кольматации гидромониторными стру ми, зоны 8 изол ции нагнетанием в них смеси.In the borehole 1, the filling pipes 2, the flow liquid in the filling pipes 2, the washing liquid filling the well 1, the first component 5 placed in the filling pipes 2 and the well 1 are placed. The second component 6 mixes about the column of the filling pipes 2, the monitor head 3, absorbing layer 4. zones 7 of clogging with jetting jets, zones 8 of isolation by injection of a mixture into them.

Способ осуществл ют следующим образом .The method is carried out as follows.

В скважину 1 спускаетс  колонна заливочных труб 2 с гидромонитором 3 и устанавливаетс  у подошвы поглощающего пласта 4. Буровым насосом в заливочные трубы последовательно закачивают компоненты тамлонажных смесей - глинистый 5 и цементный 6 растворы и продавливают до выхода первого компонента из труб 2. В это врем  гидромонитор 3 поднимают на 12-15 м над подошвой поглощени  (на длину рабочей трубы) и в направлении сверху вниз с одновременным вращением инструмента производ т обработку стенок скважины гидромониторными стру ми суспензии, формиру  в приствольной зоне кольматаци онный слой 7 на участках, где фильтрационные свойства пород поддаютс In the well 1, a column of filling pipes 2 with hydraulic monitor 3 is lowered and installed at the bottom of the absorbing reservoir 4. The components of the cement mixtures — clay 5 and cement 6 — are pumped into the filling pipes successively and pushed until the first component emerges from the pipes 2. At this time 3 is raised 12–15 m above the absorption base (for the length of the working tube) and from the top downwards with simultaneous rotation of the tool, the walls of the well are processed by means of a jetting slurry, forming in the stalk zone, the colmatage layer 7 in areas where the filtration properties of the rocks are amenable to

OsOs

елate

vj Оvj o

гидроизол ции этим способом. По окончании обработки первого интервала инструмент поднимают выше его кровли на 13- 15 м и операцию повтор ют.waterproofing in this way. At the end of the processing of the first interval, the tool is raised above its roof by 13-15 m and the operation is repeated.

Таким образом обрабатываетс  весь поглощенный интервал от подошвы до кровли, но с таким расчетом, чтобы к концу первого этапа изол ции второй компонент (цементный раствор) подошел к нижнему концу заливочных труб 2. Честь поглощенного пластом первого компоненте 5 при этом располагаетс  в затрубном пространстве выше гидромонитора 3.In this way, the entire absorbed interval from the sole to the roof is processed, but in such a way that by the end of the first isolation phase the second component (cement mortar) approaches the lower end of the filling pipes 2. The honor of the first component 5 absorbed by the formation is located in the annulus above hydro monitor 3.

Затрубное пространство герметизируют превентором. Одновременной подачей по заливочным трубам цементного раствора и затрубному пространству глинистого раствора при статическом положении инструмента , прокачиванием первого компонента через турбулентны струи цементного раствора производ т смешивание последних и нагнетание в поглощающие каналы 8. Расход жидкости при этом поддерживаетс  в пределах, достаточных дл  создани  перепада давлени  на кровлю изолируемого объекта, равного или больше- . j 3,0 МПа. Это интенсифицирует процесс отделени  из смеси воды затворени  и необратимого роста ее реологических свойств. По завершении операции превентор открывают , инструмент из скважины поднимают .The tubular space is sealed with a preventer. Simultaneously feeding the cement mortar and the annular space of the slurry through the casting pipes at the static position of the tool, pumping the first component through the turbulent streams of the cement slurry mixes the latter and injects into the absorption channels 8. At the same time, the flow rate is maintained to the extent sufficient to create a pressure differential the roof of the insulated object is equal to or greater than-. j 3.0 MPa. This intensifies the process of separation from the mixture of mixing water and irreversible growth of its rheological properties. Upon completion of the operation, the preventer is opened, the tool is lifted from the well.

Ф о р м у л а и з о б р е т е н и  FORUMAWLAH AND ISLANDS

Способ изол ции поглощающего или водопро вл ющего пласта путем закачивани  через колонну заливочных труб первого компонента тампонирующей смеси с закупоривающими свойствами, ввода второго компонента в интервал размещени  первого гидромониторными стру ми, смешивание обоих компонентов и нагнетание полученной тампонирующей смеси в каналы пород пласта, отличающийс  тем, что, с целью повышени  качества процесса изол ции, производ т обработку ствола в интервале поглощени  или водопро влени  гидромониторными стру ми первого компонента тампонирующей смеси, смешивание компонентов производ т прокачиванием первого через турбулентный поток гидромониторных струй второго компонента при статическом положении колонны заливочных труб, нагнетание полученной тампонирующей смеси в каналы пород пласта осуществл ют с расходом, создающим перепад давлени  на кровлю пласта, равный или больший 3.0 МПа.A method of isolating an absorbing or water-bearing formation by pumping a first component of a plugging mixture with clogging properties through a column of injection pipes, introducing a second component into the spacing of the first jetting jets, mixing both components and injecting the resulting plugging mixture into the rock channels of the formation, that, in order to improve the quality of the insulation process, the stem is treated in the interval of absorption or water supply by jetting jets of the first component that plugging mixture, mixing the components is produced t pumping the first through the turbulent flow of jetting streams of the second component in the static state column casting pipes, pumping the resulting plugging mixture into the channels of the reservoir rock is carried out at a flow rate that creates a pressure drop in the reservoir roof, equal to or greater than 3.0 MPa.

Claims (1)

Формула изобретенияClaim Способ изоляции поглощающего или водопроявляющего пласта путем закачивания через колонну заливочных труб первого компонента тампонирующей смеси с закупоривающими свойствами, ввода второго компонента в интервал размещения первого гидромониторными струями, смешивание обоих компонентов и нагнетание полученной тампонирующей смеси в каналы пород пласта, отличающийся тем. что, с целью повышения качества процесса изоляции, производят обработку ствола в интервале поглощения или водопроявления гидромониторными струями первого компонента тампонирующей смеси, смешивание компонентов производят прокачиванием первого через турбулентный поток гидромониторных струй второго компонента при статическом положении колонны заливочных труб, нагнетание полученной тампонирующей смеси в каналы пород пласта осуществляют с расходом, создающим перепад давления на кровлю пласта, равный или больший 3.0 МПа.A method of isolating an absorbing or water-developing formation by pumping through the column of filling pipes the first component of the plugging mixture with clogging properties, introducing the second component into the interval of placement of the first hydraulic jets, mixing both components and injecting the resulting plugging mixture into the rock channels of the formation, characterized in that, in order to improve the quality of the isolation process, the barrel is processed in the interval of absorption or water development by the jet jets of the first component of the plugging mixture, the components are mixed by pumping the first through a turbulent stream of jet jets of the second component with a static position of the casting pipe string, and the resulting plugging mixture is injected into the rock channels the formation is carried out at a rate that creates a pressure drop across the roof of the formation equal to or greater than 3.0 MPa.
SU894718070A 1989-06-08 1989-06-08 Method of insulation of absorbing or water-bearing stratum SU1657610A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894718070A SU1657610A1 (en) 1989-06-08 1989-06-08 Method of insulation of absorbing or water-bearing stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894718070A SU1657610A1 (en) 1989-06-08 1989-06-08 Method of insulation of absorbing or water-bearing stratum

Publications (1)

Publication Number Publication Date
SU1657610A1 true SU1657610A1 (en) 1991-06-23

Family

ID=21460443

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894718070A SU1657610A1 (en) 1989-06-08 1989-06-08 Method of insulation of absorbing or water-bearing stratum

Country Status (1)

Country Link
SU (1) SU1657610A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР Nfe 819306, кл. Е 21 В 33/138. 1981. Авторское свидетельство СССР гФ 1193268, кл. Е 21 В 33/13, 1985. *

Similar Documents

Publication Publication Date Title
US4305463A (en) Oil recovery method and apparatus
US6719054B2 (en) Method for acid stimulating a subterranean well formation for improving hydrocarbon production
CN100482918C (en) Method and device for acid exciting of underwell structure layer
US3814187A (en) Subsurface formation plugging
RU2315171C1 (en) Method for water influx zone isolation inside well
CN112253070B (en) Method for sectional seam making, coal washing and outburst elimination of thick coal seam top-bottom linkage horizontal well
SU1657610A1 (en) Method of insulation of absorbing or water-bearing stratum
RU2258803C1 (en) Production bed treatment method
RU2740505C1 (en) Acid treatment method of open horizontal shaft of wells
SU1618870A1 (en) Method of cementing wells
SU1193268A1 (en) Method of isolating absorption formations
RU2270327C1 (en) Method for disastrous drilling mud loss zones isolation during oil and gas hole drilling
SU1206431A1 (en) Method of isolating bottom water in oil well
RU2208129C2 (en) Method of well cementing
RU2211303C2 (en) Method of shutoff of water inflow to well
RU2211301C2 (en) Method of wellbore treatment
RU2067158C1 (en) Method for reverse cementing of casing in well
SU1155721A1 (en) Method of isolating absorption zones
RU2784138C1 (en) The method for pumping binary mixtures into the reservoir
RU2194842C2 (en) Method of hydraulic isolation of formations in completion of well construction
SU1507977A1 (en) Method of constructing antiseepage curtains
RU2139465C1 (en) Method of trenchless laying of pipe lines on soil
SU1571218A1 (en) Method of isolating absorbing seams in boreholes
RU2224875C2 (en) Method of limiting water influx into extracting wells
SU1208191A1 (en) Method of repair-isolation cementing of operating string under absorption and water inflow conditions