SU1642016A1 - Method for mining of tailing dump - Google Patents

Method for mining of tailing dump Download PDF

Info

Publication number
SU1642016A1
SU1642016A1 SU884607755A SU4607755A SU1642016A1 SU 1642016 A1 SU1642016 A1 SU 1642016A1 SU 884607755 A SU884607755 A SU 884607755A SU 4607755 A SU4607755 A SU 4607755A SU 1642016 A1 SU1642016 A1 SU 1642016A1
Authority
SU
USSR - Soviet Union
Prior art keywords
excavator
strip
dam
tailings
radii
Prior art date
Application number
SU884607755A
Other languages
Russian (ru)
Inventor
Климент Николаевич Трубецкой
Анарбек Зиябекович Толумбаев
Александр Владимирович Когут
Владимир Николаевич Уманец
Максим Брониславович Никитин
Юрий Иванович Мальченко
Ринальт Галактионович Петроченков
Original Assignee
Институт Горного Дела Ан Казсср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт Горного Дела Ан Казсср filed Critical Институт Горного Дела Ан Казсср
Priority to SU884607755A priority Critical patent/SU1642016A1/en
Application granted granted Critical
Publication of SU1642016A1 publication Critical patent/SU1642016A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

Изобретение относитс  к горной пром-сти и предназначено дл  разработки хвостохранилищ горно-обогатительных предпри тий . Цель изобретени  - повышение интенсивности разработки хранилища при отработке сло ми сверху вниз. Отрабатывают хвостохранилище сло ми. Перед отработкой каждого сло  на поверхность отсыпают породную полосу (ПП) и устанавливают на нее экскаватор. , Ширину ПП принимают равной двум радиусам вращени  кузова экскаватора и размещают ПП одну над другой и на рассто нии от дамбы, равном двум радиусам черпани  экскаватора. По обе стороны от ПП отрабатывают хвосты пр мым ходом экскаватора с одной точки его сто ни  с формированием дна трением между дамбой и ПП. Отгружают хвосты в транспортные средства и транспортируют за пределы хранилища. По мере отработки хвостов на дно траншеи отсыпают ПП. Оставшиес  под ПП хвосты отрабатывают обратным ходом экскаватора. При этом дно траншеи формируют шириной не менее двух радиусов вращени  кузова экскаватора. После понижени  общего уровн  хвостохранилища отрабатывают дамбу. 2 з. п. ф-лы, 2 ил. SS (ЛThe invention relates to the mining industry and is intended for the development of tailings of mining and concentration plants. The purpose of the invention is to increase the intensity of the development of storage when mining layers from top to bottom. Work out tailing layers. Before working out each layer, a rock strip (PP) is poured onto the surface and an excavator is placed on it. The width of the transducer is taken equal to two radii of rotation of the body of the excavator and locate the transducer one above the other and at a distance from the dam equal to two radii of excavator excavation. On both sides of the PC, the tails are driven by the forward stroke of the excavator from one point of its stand with the formation of friction between the dam and the PC. Tails are shipped to vehicles and transported out of storage. As the tailings are drilled to the bottom of the trench, they pour PP. The tailings left under the PP are processed by the reverse motion of the excavator. In this case, the bottom of the trench is formed with a width of at least two radii of rotation of the excavator body. After lowering the overall level of the tailings dam. 2 h. item f-ly, 2 ill. SS (L

Description

Изобретение относитс  к горной промышленности и может быть использовано при разработке хвостохранилищ горно-обогатительных предпри тий.The invention relates to the mining industry and can be used in the development of tailings of mining and concentration plants.

Цель изобретени  - повышение интенсивности разработки при отработке сло ми сверху вниз.The purpose of the invention is to increase the intensity of development when working from top to bottom.

На фиг. 1 показан способ разработки хвостохранилища; на фиг. 2 - разрез А-А на фиг. 1.FIG. 1 shows a method for developing a tailing dump; in fig. 2 shows section A-A in FIG. one.

Способ осуществл ют следующим образом .The method is carried out as follows.

Хвостохранилище отрабатывают сло ми. Перед отработкой каждого сло  хвостохранилища на поверхности сло  от внутреннего кра  дамбы обваловани  1 на рассто нии, равном двум радиусам черпани , отсыпают из крупнокусковой скальной массы породную полосу 2, шириной, равной двум радиусамThe tailings are processed by layers. Before working each layer of the tailings on the surface of the layer from the inner edge of the embankment of the embankment 1 at a distance equal to two radii of the grab, pour the rock strip 2 of a width equal to two radii from a large rock mass.

вращени  кузова, от последней на таком же рассто нии отсыпают следующую породную полосу и т. д. до перекрыти  предназначенной к отработке площади хвостохранилища . Отсыпкой породных полос выдел ютс  зоны последовательной разработки, при этом исключаетс  возможность прорыва обводненных хвостов через дамбу обваловани , котора  отрабатываетс  после понижени  общего уровн  хвостохранилища, создаетс  уплотн юща  пригрузка, и снижаетс  опорное давление экскаватора непосредственно на хвосты, повышаетс  его устойчивость. Затем на дамбу обваловани  1 и породные полосы 2 устанавливают драглайны и приступают к отработке сло  пород. Установка драглайнов на породные полосы повышает их устойчивость и улучшает услови  дл  нижнего черпани  за счет образовани  первоначального при мка.rotation of the body, the next breeding strip, etc., is poured from the latter at the same distance, etc., to the overlap of the tailings storage area intended for mining. By dumping the rock bands, sequential development zones are identified, this eliminates the possibility of the flooded tails breaking through the embankment dam, which is worked out after the general level of the tailings is lowered, compaction loading is created, and the excavator bearing pressure decreases directly, increasing its stability. Then, on the dam of embankment 1 and rock lanes 2, install draglines and proceed to working out the layer of rocks. Installing draglines on rock bands increases their stability and improves the conditions for bottom scoop by forming initial mark.

О5 Јь 1CО5 ь 1C

ОABOUT

Отработку хвостов с дамбой обваловани  1 ведут одной траншеей. С породной полосы 2 производ т отработку хвостов по обе стороны от полосы. Отработку ведут с одной точки сто ни  экскаватора пр мым ходом . При отработке хвостов с обеих сторон полосы формируют траншеи 3 и 4. По мере отработки хвостов на дно 5 траншеи 3, ближайшей к дамбе 1 и расположенной между полосой 2 и дамбой 1, отсыпают породную полосу 6 дл  отработки нижележащего сло  7. Дно траншеи при этом формируют шириной не менее двух радиусов вращени  экскаватора. Хвосты, имеющие естественную влажность, отгружают в автотранспорт 8, а мокрые укладывают в штабель 9 на породную полосу 2 за экскаватор, по достижении хвостами штабел  естественной влажности их загружают в автотранспорт и транспортируют за пределы хранилища. После отработки хвостов с обеих сторон полосы обратным ходом экскаватора отрабатывают оставшиес  под породной полосой необработанные хвосты 10, при этом мокрые хвосты также укладывают в штабель на породную полосу 6 нижнего сло .The development of tailings with a bank dike 1 is carried out in one trench. From the breeding strip 2 tailings are tested on both sides of the strip. The excavation is carried out from one point of one hundred of the excavator forward. When mining tailings on both sides of the strip, trenches 3 and 4 are formed. As tailings to the bottom 5 of the trench 3 closest to the dam 1 and located between strip 2 and the dam 1 are mined, the rock strip 6 is poured to work out the underlying layer 7. The bottom of the trench form a width of at least two radii of rotation of the excavator. Tails with natural moisture are shipped to motor transport 8, and wet tails are placed in stack 9 on the breeding strip 2 behind an excavator, when tails reach a stack of natural moisture they are loaded into motor transport and transported outside the storage. After testing the tails on both sides of the strip with the reverse stroke of an excavator, the raw tails 10 remaining under the rock strip are worked out, while the wet tails are also stacked on the rock strip 6 of the lower layer.

Дл  отработки следующего сло  экскаватор устанавливают на породную полосу, ранее сформированную на дне траншеи 3.To work out the next layer, the excavator is installed on the rock strip, previously formed at the bottom of the trench 3.

Отработка хвостов каждой последующей полосы и каждого нижележащего сло  производитс  в аналогичном пор дке.The tailings of each subsequent strip and each underlying layer are worked out in a similar order.

Дамбу обваловани  отрабатывают после понижени  общего уровн  хвостохрани- лища.The embankment dam is processed after lowering the overall level of the tailing dump.

Claims (3)

1.Способ разработки хвостохранилища, включающий отсыпку на поверхность породной полосы, установку на полосу экскаватора , отбойку хвостов пр мым ходом экскаватора с формированием дна траншеи, располагаемой между дамбой и породной полосой , отличающийс  тем, что, с целью повышени  интенсивности разработки хранилища при отработке сло ми сверху вниз, полосы1. A method of developing a tailing dump, including dumping onto the surface of the rock strip, installing it on the excavator strip, breaking the tails with a forward stroke of the excavator to form the bottom of the trench, located between the dam and the rock strip, characterized in that mi from top to bottom strip шириной, равной двум радиусам вращени  кузова экскаватора, размещают одна от другой и от дамбы на рассто нии, равном двум радиусам черпани  экскаватора, хвосты по обе стороны от полосы отрабатывают с одной точки сто ни  экскаватора при пр мом ходе, отгружают их в транспортные средства и транспортируют за пределы хранилища , по мере отработки хвостов на дно траншеи, расположенной между дамбой обваловани  и полосой, отсыпают породу,, аa width equal to two radii of rotation of the excavator body, placed one from the other and the dam at a distance equal to two radii of the excavator excavation, the tails on either side of the strip are worked from one point one hundred times the excavator during forward running, they are shipped to vehicles and transported out of the storage, as the tailings are drilled to the bottom of the trench, located between the dam embankment and the strip, the rock is poured, and оставшиес  под породной полосой хвосты отрабатывают обратным ходом экскаватора.the tails remaining under the breeding strip are worked out with the return stroke of the excavator. 2.Способ по п. 1, отличающийс  тем, что дно траншеи формируют шириной не менее двух радиусов вращени  кузова экскаватора.2. A method according to claim 1, characterized in that the bottom of the trench is formed with a width of at least two rotation radii of the excavator body. 3.Способ по п. 1, отличающийс  тем, что дамбу обваловани  отрабатывают после3. The method according to claim 1, characterized in that the embankment dam is worked after понижени  общего уровн  хранилища.lowering the overall storage level. , ХХ, XX х 7/x 7 / - етпттт| nMLifn v il - estptt | nMLifn v il VV - утттпттгг х .- utttptggg x. ,iiiifmrn-ifr ,lebCOncn, iiiifmrn-ifr, lebCOncn лЭйШЗЕЗТШЛь пш пгтпТ7ипгу.LEYSHZEZTSHL psh pgtpT7ipgu. LXIх7 IILXIx7 II Х |/ | X | / | iJia. отгстпттК S ИОООПСрiJia otgstpttK S IOOOPSr .. -h XX Кда / /Kda / / . /. 4ТСР. /. 4TCR .сЗЭГСЕСЮ.SEGSESYU х 7/x 7 / - етпттт| nMLifn v il - estptt | nMLifn v il VV ,lebCOncnlebCOncn // IIII
SU884607755A 1988-11-22 1988-11-22 Method for mining of tailing dump SU1642016A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884607755A SU1642016A1 (en) 1988-11-22 1988-11-22 Method for mining of tailing dump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884607755A SU1642016A1 (en) 1988-11-22 1988-11-22 Method for mining of tailing dump

Publications (1)

Publication Number Publication Date
SU1642016A1 true SU1642016A1 (en) 1991-04-15

Family

ID=21410401

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884607755A SU1642016A1 (en) 1988-11-22 1988-11-22 Method for mining of tailing dump

Country Status (1)

Country Link
SU (1) SU1642016A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2465462C1 (en) * 2011-04-22 2012-10-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Tailing storage development method
RU2466274C1 (en) * 2011-05-10 2012-11-10 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method to mine tailing storage facility
CN103470262A (en) * 2013-09-12 2013-12-25 中国矿业大学 Mining method of nearly horizontal mineral deposit of opencast coal field by casting and internally dumping

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 924374, кл. Е 21 С 41/00, 1980. Авторское свидетельство СССР № 1465573, кл. Е 21 С 41/02, 1987. *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2465462C1 (en) * 2011-04-22 2012-10-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Tailing storage development method
RU2466274C1 (en) * 2011-05-10 2012-11-10 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method to mine tailing storage facility
CN103470262A (en) * 2013-09-12 2013-12-25 中国矿业大学 Mining method of nearly horizontal mineral deposit of opencast coal field by casting and internally dumping

Similar Documents

Publication Publication Date Title
US5194689A (en) Earth excavation using blast casting and excavating apparatus
SU1642016A1 (en) Method for mining of tailing dump
US5140907A (en) Method for surface mining with dragline and blast casting
SU723138A1 (en) Trench-driving method
RU1830103C (en) Method for mining mineral deposits
SU1113546A1 (en) Method of dumping overburden rock under flooding conditions
SU667671A1 (en) Stripped soil dumping method
SU1756566A1 (en) Method for mineral opencast mining
SU706530A1 (en) Trenching method
SU1049662A1 (en) Method of internal dumping of water-saturated rock
SU1023087A1 (en) Method of strip mining of adjoining and horizontal and gently-sloping beds of minerals
RU2187647C1 (en) Method of softening of surface layer of opencast benches in seasonal ground freezing
RU2023160C1 (en) Method for extraction of sapropel and other loose grounds from water reservoir bottom and device for its realization
SU1416694A1 (en) Method of open mining of mineral deposits
SU1162977A1 (en) Method of mining thin steep veins
SU1097793A1 (en) Method of strip mining of horizontal and gently-sloping beds of minerals
SU1509531A1 (en) Method of mining ore bodies in layers with filling-up
SU912932A1 (en) Method of driving a split trench
SU899950A1 (en) Method of forming internal dumps
SU1511391A1 (en) Method of open-cast mining of mineral deposits
SU798300A1 (en) Method of open-cast mineral mining
SU685752A1 (en) Method of forming dumps
SU1036925A1 (en) Method of removing oversize in open-pit working of mineral deposits
RU2062879C1 (en) Method for open exploitation of drawn together inclined mineral seam
SU972095A1 (en) Method of strip mining of horizontal and gently-sloping beds of minerals