SU1620543A1 - Method of erecting foundation pit - Google Patents

Method of erecting foundation pit Download PDF

Info

Publication number
SU1620543A1
SU1620543A1 SU894647929A SU4647929A SU1620543A1 SU 1620543 A1 SU1620543 A1 SU 1620543A1 SU 894647929 A SU894647929 A SU 894647929A SU 4647929 A SU4647929 A SU 4647929A SU 1620543 A1 SU1620543 A1 SU 1620543A1
Authority
SU
USSR - Soviet Union
Prior art keywords
soil
foundation
bulk material
cage
clip
Prior art date
Application number
SU894647929A
Other languages
Russian (ru)
Inventor
Александр Семенович Ковалев
Александр Сергеевич Сызранов
Вячеслав Викторович Наумов
Original Assignee
Центральный научно-исследовательский и проектно-экспериментальный институт организации, механизации и технической помощи строительству
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Центральный научно-исследовательский и проектно-экспериментальный институт организации, механизации и технической помощи строительству filed Critical Центральный научно-исследовательский и проектно-экспериментальный институт организации, механизации и технической помощи строительству
Priority to SU894647929A priority Critical patent/SU1620543A1/en
Application granted granted Critical
Publication of SU1620543A1 publication Critical patent/SU1620543A1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

Изобретение относитс  к способам возведени  фундамента и обеспечивает повышение надежности и несущей способности дамента Способ включает укладку на поверхности слабого грунта 1 сло  минисю- го грунта 3 и последующую отсыпк жесткого сыпучего материала. На этот материал устанавливают обойму 5 с открытым нижним и закрытым верхним торцами. Обойм погружают в грунт, после чего в материал нагнетают быстро твердеющий цементный раствор 7. Затем обойму извлекают и операции повтор ют до достижени  ущирением 9 несущего минерального сло  до отказа при трамбовании Полость , образовавшуюс  посте извлечени  обоймы, бетонируют 1 з. п ф-чы 6 ил U5The invention relates to a method for erecting a foundation and provides an increase in the reliability and carrying capacity of the customer. The method includes laying 1 layer of mini-soil 3 on the surface of weak soil and subsequent dumping of rigid bulk material. On this material set the clip 5 with open lower and closed upper ends. The cage is immersed in the ground, after which fast-hardening cement mortar 7 is injected into the material. The cage is then removed and the operations are repeated until the supporting mineral layer is reached until failure. The cavity that is formed after the cage extraction is cast into concrete 1 s. p f-chy 6 il U5

Description

Фиг. 5FIG. five

Изобретение относитс  к строительству и касаетс  возведени  фундаментов в вытрамбованных котлованах, выполн емых в слабых водонасыщенных глинистых и затор- фованных грунтах.The invention relates to construction and relates to the construction of foundations in rammed trenches carried out in weak, water-saturated clay and ground soil.

Цель изобретени  - повышение надежности и несущей способности фундамента.The purpose of the invention is to increase the reliability and carrying capacity of the foundation.

На фиг. 1 представлен профиль со слабым водонасыщенным грунтом, подстилаемым несущим слоем из минерального грунта с отсыпанным слоем глинистого грунта и объема жесткого сыпучего материала; на фиг. 2 - то же, с установленной на жестком материале обоймы; на фиг. 3 - то же, после погружени  обоймы с сыпучим материалом и нагнетани  через стены обоймы быстротвердеющего раствора; на фиг. 4 - то же, перед повторным погружением обоймы; на фиг. 5 - то же, после повторного погружени  обоймы и нагнетани  раствора; на фиг. 6 - профиль с готовым фундаментом.FIG. Figure 1 shows a profile with a weak, water-saturated soil, the underlying bearing layer of mineral soil with a bed of clay soil and a volume of rigid bulk material; in fig. 2 - the same, with the clip mounted on the rigid material; in fig. 3 - the same, after immersing the cage with bulk material and pumping a quick-hardening mortar through the cage walls; in fig. 4 - the same, before re-immersing the holder; in fig. 5 - the same, after re-immersing the cage and injecting the solution; in fig. 6 - profile with a ready foundation.

Способ осуществл ют следующим образом .The method is carried out as follows.

На поверхности водонасыщенного грунта 1, подстилаемого несущим минеральным слоем грунта 2, отсыпают с уплотнением слой глинистого грунта 3 оптимальной влажности , на который в месте будущего фундамента отсыпают сыпучий жесткий материал (щебень) 4. На этот материал устанавливают обойму 5, имеющую открытый нижний и закрытый верхний торцы. Объем полости обоймы б низок к объему отсыпанного жесткого материала. Обойму 5 забивают в грунт ;i;i t чубину не менее высоты внутренней по loeii обоймы, после чего в сыпучий матери , 1 ( PIM трубопровод 6 и внутренние . ы полают быстродействующий , 1 7 При этом образуютс  е . . i i Koiuvpv обоймы оболочка 8 из глинистого грунта и уширение 9 из закрепленного сыпучего материала 4. После извлечени  обоймы 5 вышеописанные операции неоднократно повтор ют доOn the surface of the water-saturated soil 1, underlain by the bearing mineral layer of soil 2, the layer of clay soil 3 is optimally filled with compaction, on which a loose hard material (crushed stone) is poured into the place of the future foundation 4. The material is mounted on this material 5, which has an open lower and closed upper ends. The volume of the cavity of the clip b is low to the volume of the spilled hard material. The clip 5 is driven into the ground; i; it a chubin is not less than the height of the inner shell over loeii, and then into the loose mother, 1 (PIM pipeline 6 and internal. We pour a fast-acting, 1 7 This forms the shell. I 8 Koiuvpv clips clay soil and the broadening 9 of the fixed bulk material 4. After removing the casing 5, the above operations are repeatedly repeated until

достижени  необходимой по расчету глубины заложени  и несущей способности фундамента , т. е. достижени  жестким сыпучим материалом 4 несущего минерального сло  грунта 2 или до отказа при втрамбовывании жесткого материала. Затем обойму извлекают и оставшуюс  полость бетонируют .achieve the necessary for the calculation of the depth of laying and the carrying capacity of the foundation, i.e., the hard bulk material 4 achieves a bearing mineral layer of the soil 2 or until it fails when the hard material is tamped down. Then the holder is removed and the remaining cavity is concreted.

Выполнение комплекса этих технологических операций повышает надежность возведени  фундамента и его несущую способность .The implementation of the complex of these technological operations increases the reliability of the construction of the foundation and its carrying capacity.

Claims (2)

1.Способ возведени  фундамента, включающий укладку на поверхности грунта глинистого сло , втрамбовывание в грунт через глинистый слой сыпучего материала отдельными порци ми и заполнение оставшейс  после втрамбовывани  полости бетонной смесью, отличающийс  тем, что, с целью1. A method for building a foundation, including laying a clay layer on the soil surface, tamping the bulk material into the soil through the clay layer in separate portions and filling the cavity with the concrete mixture, which is characterized in that повышени  надежности и несущей способности фундамента, перед втрамбовыванием каждой порции сыпучего материала его заключают в вертикальную с открытым нижним и закрытым верхним торцами обойму, повтор ющую в плане конфигурацию возводимого фундамента, а после втрамбовывани  в сыпучий материал, заключенный в обойму, нагнетают твердеющий раствор, и затем обойму извлекают.to increase the reliability and carrying capacity of the foundation, before embedding each portion of the bulk material, it is enclosed in a vertical case with an open bottom and closed upper ends, repeating in terms of the configuration of the constructed foundation, and after embedding it in the bulk material enclosed in the holder, the hardening solution is pumped then the clip is removed. 2.Способ по п. 1, отличающийс  тем, что перед отсыпкой первой порции сыпучего материала на поверхность глинистого сло  укладывают водонепроницаемый материал .2. A method according to claim 1, characterized in that a waterproof material is laid on the surface of the clay layer prior to dumping the first batch of bulk material. .v:-:-:: ;:-.; фиг.1.v: -: - ::;::; figure 1 JJ Vy VVVV V„VV „V A . Л,   A. L, i уi y лl tt .Z.Z лl tt --Л. А ..1  --L. A. ..1 ЛL VV Шиг4Shig4 А BUT VV 8eight
SU894647929A 1989-02-07 1989-02-07 Method of erecting foundation pit SU1620543A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894647929A SU1620543A1 (en) 1989-02-07 1989-02-07 Method of erecting foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894647929A SU1620543A1 (en) 1989-02-07 1989-02-07 Method of erecting foundation pit

Publications (1)

Publication Number Publication Date
SU1620543A1 true SU1620543A1 (en) 1991-01-15

Family

ID=21427561

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894647929A SU1620543A1 (en) 1989-02-07 1989-02-07 Method of erecting foundation pit

Country Status (1)

Country Link
SU (1) SU1620543A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Пособие по проектированию оснований зданий и сооружений (к СНиП 2.02 01 - 83). М.: Стройиздат, 1986, с. 300-324. Крутое В. И., Багдасаров Ю. А.. Рабинович И. Г. Фундаменты в вытрамбованных котлованах. М.: Стройиздат, 1985, с. 15-16. *

Similar Documents

Publication Publication Date Title
US6503025B1 (en) Precast concrete beam element and methods of making and installing same
CN105401589B (en) A kind of GPS for frozen soil and swelled ground area monitors pier and its construction technology
RU2582530C2 (en) Drive pile device in punched well with wider base
US4124963A (en) Method for forming a continuous footing
RU2634912C1 (en) Method of arranging driven pile in punched well in weak water-saturated soils (versions)
SU1620543A1 (en) Method of erecting foundation pit
JPS63233120A (en) Foundation work for wooden building
SU1434034A1 (en) Method of constructing a foundation of a circular tank
US20030131544A1 (en) Precast concrete beam element and methods of making and installing same
JP2002121754A (en) Method for constructing underwater foundation
RU2746894C1 (en) Method for manufacturing slab of quay superstructure
DE3360897D1 (en) Hollow foundation element and manufacturing method thereof
US4818142A (en) Method and apparatus for constructing a walled pool excavation
SU1622527A1 (en) Method of erecting pile
SU1694779A1 (en) Method for consolidating subsiding soil
SU1735494A1 (en) Method of erecting foundation
RU2184188C2 (en) Method for erection of piles foundation on sagged grounds
SU1025793A1 (en) Method of erecting wall in soil
SU1606613A1 (en) Method of errecting cast-in-place pile
SU887733A1 (en) Method of constructing a foundation
SU1118742A1 (en) Method of producing cast-in-place pile
SU1728382A1 (en) Foundation construction method
SU1231144A1 (en) Method of constructing foundation
SU1263751A1 (en) Method of constructing a foundation
RU2200796C2 (en) Technique of foundation reinforcement