SU1596084A1 - Device for finishing wells - Google Patents

Device for finishing wells Download PDF

Info

Publication number
SU1596084A1
SU1596084A1 SU884483941A SU4483941A SU1596084A1 SU 1596084 A1 SU1596084 A1 SU 1596084A1 SU 884483941 A SU884483941 A SU 884483941A SU 4483941 A SU4483941 A SU 4483941A SU 1596084 A1 SU1596084 A1 SU 1596084A1
Authority
SU
USSR - Soviet Union
Prior art keywords
nozzles
partition
casing
filter
nozzle
Prior art date
Application number
SU884483941A
Other languages
Russian (ru)
Inventor
Рауф Рахимович Лукманов
Шамиль Минниханович Асфаган
Игорь Олегович Овцын
Original Assignee
Башкирский государственный научно-исследовательский и проектный институт нефтяной промышленности
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Башкирский государственный научно-исследовательский и проектный институт нефтяной промышленности filed Critical Башкирский государственный научно-исследовательский и проектный институт нефтяной промышленности
Priority to SU884483941A priority Critical patent/SU1596084A1/en
Application granted granted Critical
Publication of SU1596084A1 publication Critical patent/SU1596084A1/en

Links

Landscapes

  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

Изобретение относитс  к горной промышленности и предназначено дл  заканчивани  нефт ных и газовых скважин. Цель - повышение эффективности работы устройства за счет повышени  надежности сообщени  пласта с обсадной колонной. Устройство содержит корпус /К/ 1 с отверстием 2, упором 3 и с элементами дл  св зи с обсадной колонной 4. Внутри К 1 концентрично размещены наружный патрубок 5 и концевой патрубок /КП/ 6. Они выполнены с возможностью телескопического выдвижени  из К 1. Внутренний торец КП 6 перекрыт кислоторастворимой пробкой 7. Его наружный торец выполнен с острой кромкой и перекрыт кислоторастворимой перегородкой 8. В рабочем положении патрубки стопор тс  фиксаторами 9. В отверстии 2 размещен фильтр 10. Перегородка 8 выполнена перфорированной. В транспортном положении патрубки 5 и 6 застопорены срезными штифтами 11. После спуска устройства в скважину цементируют обсадную колонну. Фильтр 10 и перегородка 8 предохран ют К 1 от загр знени  цементом. На пробку 7 и патрубки 5 и 6 действует все возрастающее давление жидкости. При превышении заданного уровн  давлени  штифты 11 срезаютс  и патрубки телескопически выдвигаютс  из К 1. Перегородка 8 смещаетс  к пробке 7, а КП 6 заостренной кромкой внедр етс  в породу 13. Патрубки стопор тс  фиксаторами 9 в рабочем положении. После обработки раствором сол ной кислоты разрушаютс  фильтр 10, пробка 7 и перегородка. Устанавливаетс  надежна  св зь пласта со скважиной. 3 ил.The invention relates to the mining industry and is intended to complete oil and gas wells. The goal is to increase the efficiency of the device by increasing the reliability of the communication of the formation with the casing. The device comprises a housing / K / 1 with a hole 2, an emphasis 3 and with elements for communication with the casing 4. Inside the K 1, the outer nozzle 5 and the end nozzle / KP / 6 are concentrically placed. They are made with the possibility of telescoping extension from K 1. The inner end of the gearbox 6 is blocked with an acid-soluble stopper 7. Its outer end is made with a sharp edge and is blocked with an acid-soluble partition 8. In the working position of the nozzle, the stopper is clamped with clamp 9. The hole 2 contains the filter 10. The partition 8 is perforated. In the transport position, the nozzles 5 and 6 are blocked by shear pins 11. After the device is lowered into the well, the casing is cemented. Filter 10 and partition 8 prevent K 1 from being contaminated with cement. The cork 7 and the nozzles 5 and 6 are affected by the increasing pressure of the fluid. When the preset pressure level is exceeded, the pins 11 are cut off and the nozzles are telescopically moved out of K 1. The partition 8 is displaced to the stopper 7, and the gearbox 6 with a sharp edge is inserted into the rock 13. The nozzles are locked with locks 9 in the working position. After treatment with a solution of hydrochloric acid, the filter 10, the plug 7 and the septum are destroyed. Reliable communication of the formation with the well is established. 3 il.

Description

пор тс  фиксаторами 9. В отверстии 2 размещен фильтр 10. Перегородка 8 выполнена перфорированной. В транспортном положении патрубки 5 и 6 застопорены срезными штифтами 11, После спуска устр-ва в скважину цементируют обсадную колонну. Фильтр 10 и перегородка 8 предохран ют К 1 от загр знени  цементом. На пробку 7 и патрубки 5 и 6 действует все возрастающее давление жидкости. При превышенииpins with clips 9. A filter 10 is placed in aperture 2. A partition 8 is perforated. In the transport position, the nozzles 5 and 6 are blocked by shear pins 11. After the device is lowered into the well, the casing string is cemented. Filter 10 and partition 8 prevent K 1 from being contaminated with cement. The cork 7 and the nozzles 5 and 6 are affected by the increasing pressure of the fluid. When exceeding

заданного уровн  давлени  штифты 11 срезаютс  и патрубки телескопически выдвигаютс  из К 1. Перегородка 8 смещаетс  к пробке 7, а КП 6 заостренной кромкой внедр етс  в породу 13. Патрубки стопор тс  фиксаторами 9 в рабочем положении. После обработки раствором сол ной кислоты разрушаютс  фильтр 10, пробка 7 и перегородка . Устанавливаетс  надежна  св зь пласта со скважиной. 3 ил.of a predetermined level of pressure, the pins 11 are cut off and the nozzles are telescopically moved out of K 1. The partition 8 is displaced towards the plug 7, and the gearbox 6 has a sharp edge inserted into the rock 13. The nozzles are locked with locks 9 in the working position. After treatment with a solution of hydrochloric acid, the filter 10, the plug 7 and the septum are destroyed. Reliable communication of the formation with the well is established. 3 il.

Изобретение относитс  к горной промышленности и предназначено дл  закан- чивани  нефт ных и газовых скважин.The invention relates to the mining industry and is intended for the completion of oil and gas wells.

Цель изобретени  - повышение эффективности работы устройства за счет повы- шени  надежности сообщени  пласта с обсадной колонной.The purpose of the invention is to increase the efficiency of the device by increasing the reliability of the communication of the formation with the casing.

На фиг.1 представлено устройство в транспортном положении, общий вид, разрез; на фиг.2 - устройство после телескопи- ческого выдвижени  патрубков, общий вид; на фиг.З.- устройство после кислотной обработки , общий вид.Figure 1 shows the device in the transport position, General view, section; Fig. 2 shows the device after telescopic extension of nozzles, general view; on fig.Z.- device after acid treatment, general view.

Устройство дл  заканчивани  скважины содержит корпус 1 с отверстием 2, упором 3, выполненным с противоположной от отверсти  2 стороны корпуса 1, и с элементами дл  св зи с обсадной колонной 4. В корпусе 1 концентрично размещены и выполнены с возможностью телескопического перемещени  относительно корпуса 1 до его упора 3 и друг относительно друга наружный патрубок 5 и концевой патрубок 6, внутренний торец которого перекрыт пробкой 7 из кислоторазрушаемого материа- ла, а наружный торец - перегородкой 8 из кислоторазрушаемого материала. Устройство имеет фиксаторы 9 рабочего положени  патрубков. Устройство снабжено размещенным в отверстии 2 корпуса 1 филь- Гром 10 из кислоторазрушаемого материала , а перегородка 8 выполнена перфорированной, причем наружный торец концевого патрубка 6 выполнен с острой кромкой, а патрубки 5 и 6 застопорены в корпусе 1 срезными штифтами 11 в транспортном положении.The device for completing a well comprises a housing 1 with an opening 2, an emphasis 3 made from the side opposite to the opening 2 of the housing 1, and with elements for communicating with the casing 4. The housing 1 is concentrically arranged and adapted for telescopic movement relative to the housing 1 to its stop 3 and relative to each other are the outer nozzle 5 and the end nozzle 6, the inner end of which is blocked by a plug 7 of acid-destructible material, and the outer end face - by a partition 8 of acid-destructive material. The device has clamps 9 of the working position of the nozzles. The device is equipped with a Thunder 10 filter made of acid-ruptured material placed in the opening 2 of the housing 1, and the partition 8 is perforated, the outer end of the end pipe 6 is made with a sharp edge, and the pipes 5 and 6 are locked in the case 1 by shear pins 11 in the transport position.

Устройство работает следующим образом .The device works as follows.

После определени  местоположени  продуктивных пластов в скважину опускают в составе обсадной колонны устройство дл  заканчивани  скважины. Количество таких устройств, устанавливаемых за один спуск, определ етс  количеством и мощно- стью продуктивных пропластков. Цементируют обсадную колонну 12. В этот период фильтр 10 предохран ет корпус 1 от попадани  в него цемента и пропускает жидкость из цементного раствора в зазор между фильтром 10 и пробкой 7. Перегородка 8 в виде фильтра предохран ет канал концевого патрубка 6 от загр знени  цементом. На пробку 7 и патрубки 5, 6 действует все возрастающее давление. При превышении заданного уровн  давлени  штифты 11 срезаютс  и патрубки 5 и 6 выдвигаютс  телескопически из корпуса в затрубное пространство . При упоре в породу 13 элемент 8 срезает фиксирующий его штифт и переме- -щаетс  к пробке 7. Концевой -патрубок 6 заостренной кромкой внедр етс  в породу 13. Патрубки 5 и 6 фиксируютс  в рабочем положении стопорными пружинными фиксаторами 9. После твердени  цемента в колонну 12 закачивают раствор сол ной кислоты, который разрушает фильтр 10, пробку 7 и перегородку 8. В результате создаетс  надежное сообщение между продуктивным пластом и обсадной трубой скважины.After determining the location of the producing formations, a device for completing the well is lowered within the casing. The number of such devices installed in one descent is determined by the number and power of productive layers. Cement casing 12 is cemented. During this period, filter 10 protects body 1 from cement ingestion and passes fluid from cement mortar into the gap between filter 10 and plug 7. Partition 8 in the form of a filter prevents end-channel 6 from contamination with cement. The cork 7 and the nozzles 5, 6 are under increasing pressure. When the preset pressure level is exceeded, the pins 11 are cut off and the nozzles 5 and 6 extend telescopically from the housing into the annulus. With the emphasis in the rock 13, the element 8 cuts off the pin fixing it and moves to the plug 7. The end sleeve 6 of the pointed edge is inserted into the rock 13. The nozzles 5 and 6 are fixed in the working position with retainer spring clamps 9. After the cement has hardened into the column 12, a solution of hydrochloric acid is injected, which destroys the filter 10, plug 7 and septum 8. As a result, reliable communication is created between the producing formation and the casing of the well.

Claims (1)

Формула изобретени  Устройство дл  заканчивани  скважины , содержащее корпус с отверстием, упором , выполненным с противоположной от отверсти  стороны, и с элементами дл  св зи с обсадной колонной, концентрично размещенные в корпусе и выполненные с возможностью телескопического перемещени  относительно корпуса до его упора и друг относительно друга наружный патрубок и концевой патрубок, внутренний торец которого перекрыт пробкой из кислотораз- рушаемого материала, а наружный торец - перегородкой из кислоторазрушаемого материала , и фиксаторы рабочего положени  патрубков, отличающеес  тем, что, с целью повышени  эффективности его работы за счет повышени  надежности сообщени  пласта с обсадной колонной, оно снабжено размещенным в отверстии корпуса фильтром из кислоторазрушаемого мате515960846The invention The device for completing a well, comprising a housing with a hole, a stop made from the side opposite to the hole, and with elements for communicating with the casing, concentrically arranged in the body and made with the possibility of telescopic movement relative to the body to its stop relative to each other the outer nozzle and the end nozzle, the inner end of which is blocked by a plug made of acid-breakable material, and the outer end face - with a partition made of acid-breakable material, and iksatory nozzles operative position, characterized in that, in order to increase its efficiency by increasing the reliability of communication with the reservoir casing is provided with a hole arranged in the housing of the filter kislotorazrushaemogo mate515960846 ппй ннпй пп ° ° выполнена перфори- патрубки зафиксированы относительно кор- m пТп R торец концево- пуса срезными штифтами в транспортном го патрубка выполнен с острой кромкой, а положении.ppny npp ° °, the perforated nozzles are made relative to the cortex m of the RTP R the end of the spindle end with shear pins in the transport nozzle is made with a sharp edge and position. 1212 Фиг. 7FIG. 7 Фиг. JFIG. J
SU884483941A 1988-09-19 1988-09-19 Device for finishing wells SU1596084A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884483941A SU1596084A1 (en) 1988-09-19 1988-09-19 Device for finishing wells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884483941A SU1596084A1 (en) 1988-09-19 1988-09-19 Device for finishing wells

Publications (1)

Publication Number Publication Date
SU1596084A1 true SU1596084A1 (en) 1990-09-30

Family

ID=21399846

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884483941A SU1596084A1 (en) 1988-09-19 1988-09-19 Device for finishing wells

Country Status (1)

Country Link
SU (1) SU1596084A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР 742580, кл. Е 21 В 43/00, 1978. Кочешков А.А. и др. Опыт заканчивани скважин в US. М.: Гостоптехиздат, 1962, с. 65 - 67. *

Similar Documents

Publication Publication Date Title
US5513703A (en) Methods and apparatus for perforating and treating production zones and otherwise performing related activities within a well
AU644764B2 (en) Overbalance perforating and stimulation method for wells
US5188183A (en) Method and apparatus for controlling the flow of well bore fluids
US4401158A (en) One trip multi-zone gravel packing apparatus
AU2001236978B2 (en) Method and apparatus for stimulation of multiple formation intervals
US6220357B1 (en) Downhole flow control tool
US6394184B2 (en) Method and apparatus for stimulation of multiple formation intervals
US4846281A (en) Dual flapper valve assembly
CA2375045C (en) Tubing conveyed fracturing tool and method
US4031955A (en) Down hole inhibitor injector
US2822048A (en) Permanent well completion apparatus
US6915856B2 (en) Apparatus and methods for preventing axial movement of downhole tool assemblies
BR112015004235B1 (en) METHODS FOR REMOVING A BUFFER AND FOR REMOVING A DEGRADABLE BARRIER BUFFER, AND, APPLIANCE FOR USE IN AN UNDERGROUND WELL AND FOR REMOVING A DEGRADABLE BUFFER
EP0421822A2 (en) Method and apparatus for single trip injection of fluid for well treatment and for gravel packing thereafter
US3517743A (en) Selective interval packer
US6460619B1 (en) Method and apparatus for creation and isolation of multiple fracture zones in an earth formation
US3119450A (en) Plural well packers
US4979567A (en) Method and apparatus for selective retraction of a tubing carried perforating gun
SU1596084A1 (en) Device for finishing wells
US2894588A (en) Permanent well completion apparatus
US4420044A (en) Flow control system
US4510999A (en) Well cleanup and completion method and apparatus
US3463248A (en) Apparatus for discharging fluent substances into well bores
RU2123106C1 (en) Method of producing fissure by hydraulic fracture within preset interval of formation and device for its embodiment
US4027730A (en) Seal assembly for fluid injection pump-down tools