SU1576874A1 - Method of determining full conductance of insulation of three-phase network with insulated neutral - Google Patents

Method of determining full conductance of insulation of three-phase network with insulated neutral Download PDF

Info

Publication number
SU1576874A1
SU1576874A1 SU874259307A SU4259307A SU1576874A1 SU 1576874 A1 SU1576874 A1 SU 1576874A1 SU 874259307 A SU874259307 A SU 874259307A SU 4259307 A SU4259307 A SU 4259307A SU 1576874 A1 SU1576874 A1 SU 1576874A1
Authority
SU
USSR - Soviet Union
Prior art keywords
network
earth
measured
phases
phase
Prior art date
Application number
SU874259307A
Other languages
Russian (ru)
Inventor
Виталий Иванович Шуцкий
Юрий Павлович Голубков
Лев Степанович Тонкошкур
Original Assignee
Криворожский горнорудный институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Криворожский горнорудный институт filed Critical Криворожский горнорудный институт
Priority to SU874259307A priority Critical patent/SU1576874A1/en
Application granted granted Critical
Publication of SU1576874A1 publication Critical patent/SU1576874A1/en

Links

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)

Abstract

Изобретение относитс  к измерительной технике, в частности к измерени м параметров электрических сетей, и может быть использовано дл  определени  модул  полной проводимости изол ции трехфазной сети с изолированной нейтралью с целью повышени  электробезопасности. Способ основан на создании замыкани  одной из фаз сети на землю в измер емой линии после отключени  ее от общей сети с сохранением питани  других неизмер емых линий, при этом энергию отключенных вращающихс  по инерции электродвигателей и рабочих машин измер емой линии используют дл  питани  трехфазной сети отключенной линии, причем измерение величины тока замыкани  выполн ют в интервале существовани  ЭДС выбега дл  одного периода, а величину напр жени  измер ют в тот же период дл  одной из незамкнутых на землю фаз относительно земли по отношению измеренных величин суд т о модуле полной проводимости изол ции. 1 ил.The invention relates to a measurement technique, in particular to measurements of the parameters of electrical networks, and can be used to determine the modulus of total conductivity of the insulation of a three-phase network with insulated neutral in order to improve electrical safety. The method is based on creating a circuit of one of the network phases to earth in the measured line after it is disconnected from the common network while maintaining the power of other non-measurable lines, while the energy of the off-speed electric motors and working machines of the measured line is used to power the three-phase network of the disconnected line , moreover, the measurement of the current of the circuit is performed in the range of the EMF of the overrun for one period, and the voltage is measured in the same period for one of the phases not connected to the earth relative to the earth The ratio of the measured values is judged on the module of full conductivity of the insulation. 1 il.

Description

Изобретение относитс  к измери тельной технике, в частности к электрическим измерени м параметров трехфазных сетей с изолированной нейтралью , и может быть использовано дл  определени  модул  полной проводимости изол ции.The invention relates to a measurement technique, in particular to electrical measurements of parameters of three-phase networks with insulated neutral, and can be used to determine the modulus of the admittance of the insulation.

Целью изобретени   вл етс  повышение электробезопасности.The aim of the invention is to increase electrical safety.

Способ заключаетс  в том, что определ ют полную проводимость изол ции трехфазной сети с изолированной нейтралыо, создают замыкание одной из фаз сети на землю в измер емой линии и измер ют величины тока замыкани  и напр жени  фазы относительно земли, по величине отношени  которых суд т о полной проводимости изол ции измер емой линии, замыкание одной из фаз сети на землю производ т после отключени  ее от общей сети, при этом энергию отключенных вращающихс  по инерции электродвигателей измер емой линии используют как источник измерительного напр жени , измер ют величину тока замыкани  в интервале существовани  ЭДС выбега дл  одного периода , а величину напр жени  в тот же период - дл  одной из незамкнутых на землю фаз относительно чемли.The method consists in determining the total conductivity of the isolation of a three-phase network with an insulated neutral, creating a circuit of one of the phases of the network to the earth in the measured line and measuring the values of the circuit current and phase voltage relative to earth, according to the value of which the total conductivity of the insulation of the measured line, the closure of one of the phases of the network to earth is made after disconnecting it from the common network, and the energy of the electromotors of the measured line turned off by inertia is used as the source measure It is estimated that the value of the closing current in the range of the EMF of the overrun for one period is measured, and the value of the voltage in the same period is measured for one of the phases that are not closed to the ground relative to the voltage.

сд sd

05 0005 00

1one

4i

На чертеже приведена схема устройства дл  реализации предлагаемого способа.The drawing shows a diagram of the device for implementing the proposed method.

Устройство содержит линейный кон- тактор 1, силовые контакты которого включены в трехфазную сеть измер емой линии, двухканальный осциллограф 2, первый вход которого присоединен параллельно шунту 3, включенному в цепь замыкани  фазы на землю, а второй вход подсоединен через делитель 4 напр жени  между одной из незамкнутых на землю фаз и землей, при этом осциллограф 2 подключен к источнику 5 питани .The device contains a linear contactor 1, the power contacts of which are included in the three-phase network of the measured line, a two-channel oscilloscope 2, the first input of which is connected in parallel with the shunt 3 connected to the ground-to-ground circuit, and the second input is connected through a voltage divider 4 between one of phases and earth that are not closed to earth, while oscilloscope 2 is connected to power supply 5.

Устройство работает следующим образом .The device works as follows.

При наличии тока нагрузки в измер емой линии ее отключают от общей сети, оставл   в .работе остальные неизмер емые линии. Возникающую ЭДС выбега отключенного электродвигател  в измер емой линии используют в качестве источника питани  ее трехфаз- ной сети. Измер ют при помощи двухка- нального осциллографа 2 величину тока замыкани .одной из фаз на землю, сигнал которого снимаетс  с шуйта 3 и подаетс  на первый вход осциллогра- фа 2. Измер ют величину напр жени  другой фазы относительно земли, которое через делитель 4 подаетс  на второй вход осциллографа, измер емые величины тока и напр жени  фиксируютс  по осциллограммам дл  одного и того же периода.If there is a load current in the measured line, it is disconnected from the common network, leaving the remaining non-measurable lines in operation. The emerging emf of the shutdown of the disconnected electric motor in the measured line is used as the power source of its three-phase network. Measured by a two-channel oscilloscope 2, the value of the closing current. One phase to earth, the signal of which is removed from the beam 3 and fed to the first input of the oscilloscope 2. The voltage value of the other phase relative to the earth is measured, which through the divider 4 is fed At the second input of the oscilloscope, the measured values of current and voltage are recorded by oscillograms for the same period.

Значение полной проводимости изол ции дл  линии определ етс  из соотношени The total conduction value of the insulation for the line is determined from the ratio

у . I-J-ЈL Uy I-j-Ul u

где 1 и U - измер емые величины тока и напр жени .where 1 and U are the measured values of current and voltage.

Claims (1)

Формула изобретени Invention Formula 5five Способ определени  модул  полной проводимости изол ции трехфазной сети с изолированной нейтралью, состо щий в том, что замыкают одну из фаз сети на землю, замыкают одну из фаз сети на землю в измер емой сети, измер ют величины тока замыкани  и напр жени  фазы относительно земли, по величине отношени  которых суд т о полной проводимости изол ции сети, отличающийс  тем, что, с целью повышени  электробёзопасности, замыкание одной из фаз сети на землю осуществл ют после отключени  ее от общей сети с сохранением питани  других неизмер емых фаз сети, при этом энергию отключенных вращающихс  по инерции электродвигателей и рабочих машин измер емой сети используют дл  питани  отключенной фазы сети, измерение тока замыкани  выполн ют в интервале существовани  ЭДС выбега, а измерение величины напр жени  осуществл ют в тот же период дл  одной из незамкнутых на землю фаз сети.The method of determining the module of full conductivity of the isolation of a three-phase network with an isolated neutral, consisting in closing one of the phases of the network to earth, closing one of the phases of the network to earth in the measured network, measuring the values of the current of the circuit and the phase voltage relative to earth by the ratio of which the total conduction of the network insulation is judged, characterized in that, in order to increase electrical safety, the closure of one of the network phases to earth is carried out after disconnecting it from the general network while maintaining the power of other non-measurable the mains phases, while the energy of the off-rotating inertia of the electric motors and the working machines of the network being measured is used to power the disconnected mains phase, the measurement of the closing current is performed in the range of the EMF overrun, and the voltage is measured in the same period for one of the open circuits on the ground of the network phase. ОABOUT 33 UU
SU874259307A 1987-06-10 1987-06-10 Method of determining full conductance of insulation of three-phase network with insulated neutral SU1576874A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874259307A SU1576874A1 (en) 1987-06-10 1987-06-10 Method of determining full conductance of insulation of three-phase network with insulated neutral

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874259307A SU1576874A1 (en) 1987-06-10 1987-06-10 Method of determining full conductance of insulation of three-phase network with insulated neutral

Publications (1)

Publication Number Publication Date
SU1576874A1 true SU1576874A1 (en) 1990-07-07

Family

ID=21309803

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874259307A SU1576874A1 (en) 1987-06-10 1987-06-10 Method of determining full conductance of insulation of three-phase network with insulated neutral

Country Status (1)

Country Link
SU (1) SU1576874A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Шуцкий В.И. и др. Электробезопасность в горнодобывающей промышленности. - М. : Недра, 1977, с. 168. Равикович И.Д. Техника безопасности в передвижных электроустановках. - М.: Энерги , 1971, с. 49. *

Similar Documents

Publication Publication Date Title
CN108226645A (en) A kind of vacuum circuit breaker divide-shut brake coil direct current resistance m easurem ent device
GB2320625A (en) Controlled semiconductor switches
SU1576874A1 (en) Method of determining full conductance of insulation of three-phase network with insulated neutral
US4573012A (en) Method and apparatus for measuring core loss of a laminated ferromagnetic structure
Boglietti et al. Loss items evaluation in induction motors fed by six-step VSI
IE810253L (en) Measurement of electric power-polyphase network
SU1215057A1 (en) Method of determining parameters of insulation of three-phase electric networks with insulated neutral up to 1000 v
SU1275629A1 (en) Device for thermal protection of electric machine
RU55153U1 (en) DEVICE FOR DETERMINING THE LOCATION OF DAMAGE TO THE ELECTRIC VOLTAGE NETWORK OF 6 (10) -35 KV WITH ISOLATED OR COMPENSATED NEUTRAL
RU1812506C (en) Method for determining single phase fault-to-ground current in insulated neutral network
SU1229886A2 (en) Device for checking current protection relays of electric motor
Hart An experimental study of short-circuit currents on a low-voltage system
SU1061065A2 (en) Device for measuring switch contact insulation resistance
SU458782A1 (en) Control method of inter-turn insulation of windings
SU1265923A2 (en) Device for measuring instantaneous values of currents in commutated sections of electric machines
SU1467651A1 (en) Method of leak current protection in a.c.electric network with rectifier converter
SU1695441A1 (en) Device for protection against leakage of current in a c network with solidly grounded neutral
SU1283676A1 (en) Method of determining distance to location of break in electric power line
SU501450A1 (en) The method for determining the inductive resistance of electrical machines
RU1812507C (en) Method for determining single phase fault-to-ground current in insulated neutral network
SU789900A1 (en) Apparatus for measuring insulation resistance relative to earth of electric circuits with electric motors
SU1751691A1 (en) Method and device for testing insulation resistance in current drying of windings an electric three-phase motor
SU1061217A1 (en) Method of determining synchronous inductive reactances of three-phase synchronous electric machine
SU917257A1 (en) Method of protecting interturn shortings in three-phase electric machine windings
SU65636A1 (en) Method for determining insulation resistance of three-phase AC mains with insulated neutral