SU1564321A1 - Borehole reamer - Google Patents

Borehole reamer Download PDF

Info

Publication number
SU1564321A1
SU1564321A1 SU874361869A SU4361869A SU1564321A1 SU 1564321 A1 SU1564321 A1 SU 1564321A1 SU 874361869 A SU874361869 A SU 874361869A SU 4361869 A SU4361869 A SU 4361869A SU 1564321 A1 SU1564321 A1 SU 1564321A1
Authority
SU
USSR - Soviet Union
Prior art keywords
possibility
parallelogram
strugs
hinges
section
Prior art date
Application number
SU874361869A
Other languages
Russian (ru)
Inventor
Борис Александрович Гей
Original Assignee
Б.А.Гей
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Б.А.Гей filed Critical Б.А.Гей
Priority to SU874361869A priority Critical patent/SU1564321A1/en
Application granted granted Critical
Publication of SU1564321A1 publication Critical patent/SU1564321A1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

Изобретение относитс  к горному делу, конкретно к устройствам дл  расширени  передовой скважины в породах различной крепости, в том числе наклонно залегающих. Цель - повышение эффективности работы за счет равномерной загрузки стругов. Устройство включает шкивную головку 1, плашечные клинь  2, телескопический корпус 3, струги 4, основной 5 и дополнительный 6 шарнирные параллелограммы, буровую колонну 7 и механизм самоустановки стругов. Корпус 3 размещен на колонне 7 с возможностью осевого перемещени  и состоит из верхней и нижней секций (С) 8 и 9. При этом С 8 соединена с головкой 1 с возможностью поворота и в ней выполнены продольные прорези (П) 11. Клинь  2 размещены в головке 1 с возможностью взаимодействи  с С 9. В стругах 4 выполнены наклонные П 12 и 13 и вертикальные П 14, сообщенные между собой. Верхние шарниры (Ш) 17 параллелограмма 5 расположены на С 8, нижние Ш 18 - на С 9, а боковые Ш 19 - в П 12 или 14. Верхние Ш 20 параллелограмма 6 расположены на С 8, нижние Ш 21 - в П 11 и С 9, а боковые Ш 22 - в П 13 или 14. Механизм самоустановки включает звездочки 23 и 24 на С 8 и Ш 22, охватываемые цеп ми 25. В подвешенном положении параллелограммы 5 и 6 и струги 4 сложены. При подъеме устройства параллелограммы 5 и 6 раскладываютс  и струги разрушают стенки скважины. 4 ил.The invention relates to mining, specifically to devices for expanding an advanced well in rocks of various strengths, including oblique deposits. The goal is to increase work efficiency due to uniform loading of plows. The device includes a pulley head 1, a die wedge 2, a telescopic body 3, planes 4, primary 5 and an additional 6 articulated parallelograms, a drill string 7 and a planer self-setting mechanism. The housing 3 is placed on the column 7 with the possibility of axial movement and consists of the upper and lower sections (C) 8 and 9. At the same time, the C 8 is connected with the head 1 with the possibility of rotation and longitudinal slots (P) 11 are made in it. The wedge 2 is placed in the head 1 with the possibility of interaction with C 9. In the struts 4 there are inclined P 12 and 13 and vertical P 14 communicated with each other. The upper hinges (W) 17 of the parallelogram 5 are located at C 8, the lower W 18 - at C 9, and the lateral W 19 - at P 12 or 14. The upper W 20 of parallelogram 6 are located at C 8, the lower W 21 - at P 11 and C 9, and side W 22 - in P 13 or 14. The self-installation mechanism includes asterisks 23 and 24 on C 8 and W 22, covered by chains 25. In the suspended position, parallelograms 5 and 6 and planes 4 are folded. When the device is lifted, the parallelograms 5 and 6 unfold and strugs destroy the walls of the well. 4 il.

Description

Изобретение относитс  к горному делу, а конкретно к устройству дл  расширени  передовой скважины в породах различной крепости, в т.ч. наклонно залегающих.The invention relates to mining, and specifically to a device for expanding an advanced well in rocks of various strengths, including obliquely overlying.

Цепь изобретени  - повышение эффективности работы за счет равномерной загрузки стругов.The circuit of the invention is an increase in operating efficiency due to the uniform loading of plows.

На фиг.1 показано устройство, об- |щий вид| на фиг.2 - нижн   часть уст- ройства, общий вид; на фиг.З - разрез А-А на фиг.1; на фиг.4 - верхн   часть устройства, разрез.Figure 1 shows the device, a general view | 2 shows the lower part of the device, a general view; on fig.Z - section aa in figure 1; figure 4 - the upper part of the device, the cut.

Устройство дл  расширени  скважин включает шкивную головку 1, плашеч- ные клинь  2, телескопический корпус 3, струги 4, основной 5 и дополнительный 6 шарнирные параллелограммы, буровую колонну 7, например пульпо- эрлифтную, на которой размещен с воз- можностью осевого перемещени  корпус 3, механизм самоустаиовки стругов, верхний и нижние трособлочные меха- низ мы.The device for expanding the wells includes a pulley head 1, a ram wedge 2, a telescopic body 3, planes 4, a main 5 and an additional 6 articulated parallelograms, a drill string 7, for example, a pulpo lift, on which case 3 is axially displaced. , plow self-propelling mechanism, upper and lower cable-block mechanisms.

Телескопический корпус 3 состоит из верхней 8 и нижней 9 секций. Верхний конец секции 8 расположен в шкив- ной головке 1 с возможностью поворота на подшипниках 10. Верхний конец секции 9 пропущен внутри секции 8 и раз- мещен в шкивной головке 1 с возможностью осевого перемещени  и фиксации ее посредством клиньев 2. В верхней секции 8 выполнены продольные прорези 1 1 .Telescopic body 3 consists of the upper 8 and lower 9 sections. The upper end of section 8 is located in the pulley head 1 rotatably on the bearings 10. The upper end of section 9 is missed inside section 8 and placed in the pulley head 1 with the possibility of axial movement and fixing it by means of wedges 2. In the upper section 8, longitudinal slots 1 1.

В стругах выполнены нижние 12 и верхние 13 наклонные прорези, а также вертикальные прорези 14, сообщающиес  с наклонными прорез ми 12 или 13. На боковых поверхност х стругов 4 укреплены резцы 15. К нижней части секции 8 прикреплены амортизаторы 16. Верхние шарниры 17 параллелограмма 5 расположены на секции 8, нижние шарниры 18 - на секции 9, а боковые шарниры, а именно их св зи 19 - в наклонных 12 или вертикальных 14 прорез х стругов. Верхние шарниры 20The struts have lower 12 and upper 13 inclined slots, as well as vertical slots 14 communicating with inclined slots 12 or 13. On the lateral surfaces of the struts 4, incisors 15 are fixed. Shock absorbers 16 are attached to the lower part of section 8. Upper hinges 17 of parallelogram 5 are located on section 8, lower hinges 18 on section 9, and side hinges, namely their connections 19, in inclined 12 or vertical 14 slits of plows. Upper hinges 20

5five

® ®

35 40 4535 40 45

JQ 5- параллелограмма 6 расположены на секции 8, нижние шарниры 21 в прорез х 11 на секции 9, а боковые шарниры (их св зи) 22 - в прорез х 13 или 14 стругов 4. Каждый параллелограмм состоит из четырех т г (не обозначены). Механизм самоустановки стругов выполнен из звездочек 23, размешенных на верхней секции 8, звездочек 24 на св з х 22 и цепей 25, охватывающих эти звездочки. Концы цепей закреплены на стругах 4. Верхний трособлочный механизм (фиг.4) состоит из рычагов 26, установленных на стойках 27, прикрепленных к верхнему концу секции 8, из т г 28, соедин ющих клинь  2 и наружные концы рычагов, и из выступов 29, установленных на колонне 7 с возможностью взаимодействи  с внутренними концами рычагов 26.JQ 5 is a parallelogram 6 located on section 8, lower hinges 21 in slots x 11 on section 9, and side hinges (their connections) 22 in slots x 13 or 14 ply 4. Each parallelogram consists of four tons g (not indicated ). The self-installation mechanism of the plows is made of sprockets 23 placed on the upper section 8, sprockets 24 on connections x 22, and chains 25 spanning these asterisks. The ends of the chains are fastened to the struts 4. The upper cable-blocking mechanism (Fig. 4) consists of levers 26 mounted on racks 27 attached to the upper end of section 8, of t g 28 connecting the wedge 2 and the outer ends of the levers, and of the projections 29 mounted on the column 7 with the ability to interact with the inner ends of the levers 26.

Нижний трособлочный механизм (фиг.2) состоит из втулки 30, подвижно установленной во внутренней полости уширенного нижнего конца 31 секции 9, блоков 32, установленное на конце 31 секции 9, на ос х нижнего и боковых шарниров параллелограмма 5, тросов 33 и упорного буртика 34, прикрепленного к буровой колонне 7 с возможностью взаимодействи  с втулкой 30 . Одни концы гросов прикреплены к втулке 30, а другие - пропущены через кольца 35, прикрепленные к стругам 4. На этих концах тросой закреплены грузы-упоры 36 .The lower cable-blocking mechanism (figure 2) consists of a sleeve 30 movably mounted in the inner cavity of the broadened lower end 31 of section 9, blocks 32, mounted on the end 31 of section 9, on the axles of the lower and side hinges of the parallelogram 5, cables 33 and the stop shoulder 34 attached to the drill string 7 with the ability to interact with the sleeve 30. Some ends of the gros are attached to the sleeve 30, while others are passed through rings 35 attached to the pads 4. At these ends, weights-lugs 36 are fixed with a cable.

Устройство дл  расширени  скважинWell spreader

работает следующим образом. iworks as follows. i

Устройство подвешено на полиспастной системе буровой установки (не показана ) с возможностью перемещени  вдоль расшир емой передовой скважины по буровой колонне 7.The device is suspended on a polyspast drilling rig system (not shown) with the ability to move along an expandable forward well along the drill string 7.

При опускании устройства втулка 30 взаимодействует с буртиком 34, поднимаетс  вверх и нат гивает тросы 33 до упора грузов-упоров 36 в кольцо 35 на более опущенном струге 4 иWhen the device is lowered, the sleeve 30 interacts with the shoulder 34, rises up and pulls the cables 33 until it stops the load stops 36 into the ring 35 on the lower plane 4 and

10ten

поднимает его. Затем поднимаютс  оба струга до упора св зей 19 в нижние торцы наклонных прорезей 12, вследствие чего струги максимально сблиз тс  между собой. При дальнейшем опускании устройства секци  9 начинарт перемещатьс  вверх относительно секции 8, благодар  чему оба параллелограмма 5 и 6 раздвигаютс  до упора резцов 15 в породу.raises it. Then, both strugues are raised up to the rest of the links 19 into the lower ends of the inclined slots 12, as a result of which the strugs closely approach each other. Upon further lowering of the device, section 9 starts moving upwards relative to section 8, whereby both parallelograms 5 and 6 are pushed as far as the cutters 15 into the rock.

Далее начинают подъем устройства. В начале подъема клинь  2 фиксируют секцию 9 от осевого перемещени , исключа  возможность сдвижки паралпело- j граммов. После того, как корпус 3 и параллелограммы 5 и 6 поднимутс  вверх, струги А повиснут на концах цепей 25 и начнет подниматьс  струг, имеющий меньшее количество резцов в контакте с породой. В начале подъема св зи 19 и 22 пройдут по наклонным прорез м 12 и 13 и вдав т резцы 15 в породу. Менее нагруженный струг будет подниматьс  до тех пор, пока оба струга займут положение, соответствующее наклону пласта породы. Затем оба струга будут подниматьс  одновременно, строга  породу. Дл  уменьшени  трени  св зей 19 и 22 о стенки прорезей, св зи могут иметь подшипники или быть покрыты резиной.Next, begin lifting the device. At the beginning of the lift, the wedge 2 fixes the section 9 against axial movement, excluding the possibility of shifting the paralpello j grams. After body 3 and parallelograms 5 and 6 are raised up, strugs A will hang at the ends of chains 25 and a strug will begin to rise, having a smaller number of incisors in contact with the rock. At the beginning of the ascent, the links 19 and 22 will pass along the inclined slots m 12 and 13 and press the incisors 15 into the rock. The less loaded plow will rise until both plows take up a position corresponding to the slope of the rock formation. Then both planes will rise simultaneously, a strict breed. To reduce the friction of the bonds 19 and 22 against the walls of the slits, the connections may have bearings or be covered with rubber.

2020

2525

30thirty

подъеме устройства порода режетс  передовыми резцами 15, а нижерасположенные резцы в каждой линии резани  обеспечивают пр молинейность движени  и  вл ютс  резервными на случай скола передового речца. Рекомендуетс  устанавливать в стругах поворотные, самозатачивающиес  резцы. when the device is raised, the rock is cut by the advanced cutters 15, and the downward cutters in each cutting line ensure the straightness of movement and are redundant in case of cleavage of the forward river. It is recommended to install turning, self-sharpening cutters in the strugs.

В крепких абразивных породах скорость подъема устройства не должна быть выше 0,5 м/с, а в породах менее крепких - до 2 м/с.In strong abrasive rocks, the lifting speed of the device should not be higher than 0.5 m / s, and in rocks less strong - up to 2 m / s.

В конце подъема после выхода стругов в расширенное устье устройство складываетс  вследствие взаимодействи  выступов 29 с рычагами 26, в результате чего рычаги через т ги 28 поднимут плашечные клинь  2 и будет расфикси- рована секци  9. Силой веса шарнирные параллелограммы 5 и 6 сложатс  до упора их сторон в амортизаторы 16 с обеспечением зазора между стругами и корпусом устройства дл  возможностиAt the end of the ascent, after the release of the planes into the extended mouth, the device folds due to the interaction of the projections 29 with the levers 26, as a result of which the levers will raise the die wedges 2 through the pulls 28 and section 9 will be unlocked. The weight of the hinged parallelograms 5 and 6 will be the sides of the shock absorbers 16, ensuring the gap between the struts and the device body to

15643211564321

00

00

5five

00

5five

00

5five

00

5five

сближени  стругов перед раздвижкой устройства.approximation of the plows before the device is extended.

Поворачивают колонну 7 и корпус 3 и устройство пускают дл  осуществлени  следующего цикла строгани .The column 7 and case 3 are rotated and the device is started up for the next planing cycle.

При применении дл  очистки скважины от породы обратной промывки (эр- лИфта), целесообразно производить периодические подъемы буровой пуль- поэрлифтной колонны 7 дл  создани  конусной формы забо , обеспечивающей оптимальные услови  дл  перемещени  разрушенной породы к колонне 7.When used to clean the well from the backwash rock (erlIFT), it is advisable to periodically raise the drillpower-lifting drill string 7 to create a conical bottom shape that provides optimal conditions for moving the fractured rock to the string 7.

Claims (1)

Формула изобретени Invention Formula Устройство дл  расширени  скважин, включающее шкивную головку, буровую колонну, на которой с возможностью осевого перемещени  размещен телескопический корпус, верхн   секци  которого соединена со шкивной головкой с возможностью поворота, плашечные клинь , установленные с возможностью взаимодействи  с нижней секцией корпуса, струги с наклонными прорез ми, шарнирный параллелограмм, верхние и нижние шарниры которого соединены с секци ми телескопического корпуса, а боковые - со стругами с возможностью размещени  в их наклонных прорез х, и т ги, одни концы которых шарнирно соединены с нижней секцией корпуса, а другие соединены со стругами с возможностью размещени  в их наклонных прорез х, отличающеес  тем, что, с целью повышени  эффективности работы за счет равномерной загрузки стругов, оно снабжено дополнительными т гами и механизмом самоустановки стругов, выполненным из цепей, концы которых закреплены на стругах, и из охватываемых цеп ми звездочек, одни из которых размещены на верхней секции, а другие - на боковых шарнирах параллелограмма , при этом одни концы дополнительных т г шарнирно соединены с верхней секцией, а другие шарнирно соединены с концами основных т г дл  образовани  дополнительного параллелограмма, а в стругах выполнены вертикальные прорези, сообщенные с наклонными прорез ми, в которых размещены шарниры параллелограммов .A device for expanding wells, including a pulley head, a drill string on which a telescopic body is axially displaced, the upper section of which is connected to the pulley head in a rotatable manner, die wedges that are installed with the possibility of interaction with the lower section of the body, and strands with inclined slots hinge parallelogram, the upper and lower hinges of which are connected to sections of the telescopic body, and the lateral - with strugs with the possibility of placement in their inclined holes x, and ti, some ends of which are pivotally connected to the lower section of the body, while others are connected to the strugs with the possibility of being placed in their inclined slots, characterized in that, in order to increase work efficiency due to uniform loading of the plows, it is equipped with additional tons gami and the self-installation mechanism of plows, made of chains, the ends of which are fixed on the strugs, and of the sprockets covered by the chains, some of which are placed on the upper section, and others on the side hinges of the parallelogram, with some ends added itelnyh rods are pivotally connected to the upper section and the other ends are pivotally connected to the main connecting rods to form a further parallelogram, and in Strugi formed vertical slits communicated with inclined slots in which parallelogram hinges are arranged. 1 one ok.ok.
SU874361869A 1987-12-03 1987-12-03 Borehole reamer SU1564321A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874361869A SU1564321A1 (en) 1987-12-03 1987-12-03 Borehole reamer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874361869A SU1564321A1 (en) 1987-12-03 1987-12-03 Borehole reamer

Publications (1)

Publication Number Publication Date
SU1564321A1 true SU1564321A1 (en) 1990-05-15

Family

ID=21349010

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874361869A SU1564321A1 (en) 1987-12-03 1987-12-03 Borehole reamer

Country Status (1)

Country Link
SU (1) SU1564321A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1270341, кл. Е 21 D 1/00, 1981. Авторское свидетельство СССР № 348737, кл. Е 21 D 1/03, 1970. *

Similar Documents

Publication Publication Date Title
EP0285385B1 (en) Top head drive assembly for earth drilling machine and components thereof
EP0548900B1 (en) nydraulic drilling machine of telescopic tower type
CA1062239A (en) Multi-stage well drilling mast assembly
GB2077809A (en) Continuous mining machine
US3650339A (en) Slant hole drilling rig
US3539024A (en) Apparatus for drilling inclined boreholes with drill bit support
US4190119A (en) Earth drilling apparatus
US4812080A (en) Offshore platform jacket and method of installation
CN110454100A (en) A kind of super single operation industrial robot device of drilling and repairing well and method
SU1564321A1 (en) Borehole reamer
CN113882813B (en) Underground rapid tunneling advanced drilling device and method for coal mine
US4351398A (en) Well drilling apparatus
US3791464A (en) Auger drill and conveyor
EP0279819A1 (en) An arrangement relating to a drilling tower
GB2053318A (en) Installing well conductors
SU1281662A1 (en) Assembly for horizontal extension of drilling string
SU1084250A2 (en) Side-wall soil sampler
RU2188295C1 (en) Drill
SU1121381A1 (en) Drilling rig
US3039547A (en) Rock bucket for earth drilling
CN214365932U (en) Compact type efficient operation drilling machine
SU968442A2 (en) Power roof support unit
WO2013065013A2 (en) Drilling arrangement
SU857431A1 (en) Core separating device
US1751348A (en) Tubular derrick