SU1557254A1 - Method of reconstructing open horizontal drainage - Google Patents

Method of reconstructing open horizontal drainage Download PDF

Info

Publication number
SU1557254A1
SU1557254A1 SU884379930A SU4379930A SU1557254A1 SU 1557254 A1 SU1557254 A1 SU 1557254A1 SU 884379930 A SU884379930 A SU 884379930A SU 4379930 A SU4379930 A SU 4379930A SU 1557254 A1 SU1557254 A1 SU 1557254A1
Authority
SU
USSR - Soviet Union
Prior art keywords
drains
collector
laid
closed
open
Prior art date
Application number
SU884379930A
Other languages
Russian (ru)
Inventor
Иван Семенович Николодышев
Владимир Анатольевич Шрейдер
Original Assignee
Всесоюзный научно-исследовательский институт гидротехники и мелиорации им.А.Н.Костякова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский институт гидротехники и мелиорации им.А.Н.Костякова filed Critical Всесоюзный научно-исследовательский институт гидротехники и мелиорации им.А.Н.Костякова
Priority to SU884379930A priority Critical patent/SU1557254A1/en
Application granted granted Critical
Publication of SU1557254A1 publication Critical patent/SU1557254A1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

Изобретение касаетс  мелиорации земель и может быть использовано при реконструкции открытой коллекторно-дренажной сети на орошаемых земл х в закрытую сеть, укладываемую ниже уровн  грунтовых вод. Цель изобретени  - снижение стоимости строительных работ и повышение надежности закрытой коллекторно-дренажной сети. На выключенном из сельхозпользовани  осушаемом массиве чист т и углубл ют основные коллекторы 1. Затем перестраивают открытые каналы (дрены) 2. Бульдозерами разравнивают наход щиес  р дом с ними старые ковальеры грунта 3, планируют придреновую полосу 4 и углубл ют дрены 2 до проектных отметок. В процессе углублени  открытой дрены 2 экскаватор движетс  от коллектора 1 к ее истоку. По дну углубленного открытого канала от его истока укладывают трубопровод (закрытый коллектор) 5. Трубы укладывают на грунт раструбами к коллектору 1. Дл  герметизации кольцевой щели между раструбом 6 и гладким концом труб 7 в раструб 6 закладывают уплотнитель. В местах подключени  к трубопроводу дополнительных закрытых горизонтальных дрен 9 устанавливают опорные железобетонные блоки смотровых колодцев 10 и устьевых концов дрен-поглотителей 11. Затем отсыпают гравийно-песчаный фильтр общей высотой 0,3-0,5 м. Нижний блок смотрового колодца 10 перекрывают перфорированной стальной крышкой 13 и на нее отсыпают слоем 10-15 см гравий крупностью 5-20 мм. Кроме того, при устройстве смотровых колодцев 10 до поверхности земли над дренами-поглотител ми 11 укладывают устьевые участки 15 дополнительных закрытых горизонтальных дрен 9 до их прокладки. 2 з.п.ф-лы, 4 ил.The invention relates to land reclamation and can be used in the reconstruction of an open collector-drainage network on irrigated land in a closed network laid below the groundwater level. The purpose of the invention is to reduce the cost of construction work and increase the reliability of the closed collector-drainage network. On the agricultural land that was turned off, the drained massif cleaned and deepened the main collectors 1. Then rebuild the open channels (drains) 2. Bulldozers level the old soil travers 3 next to them, plan the near-slope strip 4 and deepen the drains 2 to the design grades. In the process of deepening the open drain 2, the excavator moves from the collector 1 to its source. A pipe (closed collector) is laid on the bottom of the deep open channel from its source. 5. The pipes are laid on the ground with sockets to the collector 1. To seal the annular gap between the socket 6 and the smooth end of the pipes 7, a seal is inserted into the socket 6. In the places of connection to the pipeline, additional closed horizontal drains 9 install supporting reinforced concrete blocks of manholes 10 and wellhead ends of sinks-absorbers 11. Then gravel-sand filter is filled with a total height of 0.3-0.5 m. The lower block of the manhole 10 overlaps the perforated steel cover 13 and pour it a layer of 10-15 cm gravel size 5-20 mm. In addition, with the installation of manholes 10, the mouth sections 15 of additional closed horizontal drains 9 are laid above the sinks-absorbers 11 before the laying of them. 2 hp ff, 4 ill.

Description

ные блоки смотровых колодцев 10 и устьевых концов дрен-поглотителей 11. Затем отсыпают гравийно-песча- ный фильтр общей высотой 0,3-0,5 м. Нижний блок смотрового колодца 10 перекрывают перфорированной стальной крышкой 13 и на нее отсыпают слоемThe blocks of the manholes 10 and the wellhead ends of the drain absorbers 11. Then the gravel-sand filter is filled with a total height of 0.3-0.5 m. The lower block of the manhole 10 is covered with a perforated steel lid 13 and covered with a layer

10-15 см гравий крупностью 5-20 мм. Кроме того, при устройстве смотровых колодцев 10 до поверхности земли над дренами-поглотител ми 11 укладывают устьевые участки 15 дополнительных закрытых горизонтальных дрен 9 до их прокладки. 2 з.п. ф-лы, 4 ил.10-15 cm gravel size 5-20 mm. In addition, with the installation of manholes 10, the mouth sections 15 of additional closed horizontal drains 9 are laid above the sinks-absorbers 11 before the laying of them. 2 hp f-ly, 4 ill.

Изобр-етение относитс  к мелиорации земель и может быть использовано при реконструкции открытой коллектор- но-дренажной сети на орошаемых земл х в закрытую сеть, укладываемую ниже уровн  грунтовых вод.The invention relates to land reclamation and can be used in the reconstruction of an open collector-drainage network on irrigated lands into a closed network laid below the groundwater level.

Целью изобретени   вл етс  снижение стоимости строительных работ и повышение надежности закрытой коллек- торно-дренажной сети.The aim of the invention is to reduce the cost of construction and increase the reliability of the closed collector-drainage network.

На фиг 1 представлена схема последовательности работ при реконструкции открытого дренажа, при подключении дополнительных закрытых горизонтальных дрен к смотровым колодцам , выполн емым вначале в виде поглощающих; на фиг, 2 - то же, при подключении дополнительных закрытых горизонтальных дрен к смотровым колодцам с предварительно выполненными их устьевыми участками; на фиг. 3 - поперечный разрез закрытого коллектора через смотровой колодец, выполн емый вначале в виде noraornajoqeroj на фиг, 4 - план участка закрытого коллектора в месте подключени  к нему дополнительных закрытых горизонтальных дрен в случае выполнени  смотрового колодца вначале в виде поглощающего, а также в случае выполнени  смотровых колодцев с устьевыми участками дрен.Fig. 1 shows the sequence of work for the reconstruction of open drainage, with the addition of additional closed horizontal drains to the inspection wells, initially performed as absorbing; FIG. 2 - the same, when connecting additional closed horizontal drains to the observation wells with their mouth sections previously made; in fig. 3 shows a cross section of a closed collector through a manhole, initially made as noraornajoqeroj in FIG. 4, a plan of a section of a closed collector at the point where additional closed horizontal drains are connected to it in the case of the manhole first as an absorbent and also in the case of wells with wellhead areas drains.

Способ реконструкции открытого горизонтального дренажа осуществл ют следующим образом.A method for reconstructing open horizontal drainage is carried out as follows.

Предварительно на выключенном из сельхозиспользовани  осушаемом мас- сиве чист т и углубл ют основные открытые коллекторы 1. Затем переустраивают открытые дрены 2. При этом вначале бульдозерами разравнивают наход щиес  р дом с ними старые ко- вальеры грунта 3, образованные при чистке открытых дрен 2, планируютPrimarily, the open collectors 1 are cleaned and deepened on the drained mass, turned off from agricultural use. Then, the open drains 2 are rebuilt. At the same time, the old soil rollers 3, which were formed after cleaning of the open drains 2, are level by bulldozers are planning

0 0

5five

00

1515

00

5five

00

5five

придреновые полосы 4 и углубл ют дрены 2 одноковшовым экскаватором (драглайн) до проектных отметок. В процессе углублени  открытой дрены 2 экскаватор движетс  от коллектора 1 к ее истоку. При этом обеспечиваетс  свободный отток воды. Затем по дну углубленного открытого канала (дрены) 2, начина  от его истока, с помощью подъемного крана ведут укладку трубопровода (закрытого коллектора ) 5, выполненного из длинномерных железобетонных труб.Prydrenovye strips 4 and deepen the drains 2 with a single-bucket excavator (dragline) to the design elevations. In the process of deepening the open drain 2, the excavator moves from the collector 1 to its source. This ensures free flow of water. Then along the bottom of the recessed open channel (drains) 2, starting from its source, a pipeline (closed collector) 5 made of long reinforced concrete pipes is laid using a crane.

Трубы укладывают непосредственно на грунт раструбами к коллектору 1. Дл  герметизации кольцевой щели между раструбами 6 и гладким концом труб 7 в раструб 6 каждой трубы до ее спуска в траншею (дрену) 2 закладывают на битумной мастике по нижней половине периметра раструба 6 уплотнитель 8, например, из просмоленной пеньковой веревки или пористого резинового жгута. При наращивании трубопровода 5 на уплотнитель 8 укладывают гладкий конец трубы 7.The pipes are laid directly on the ground with the sockets to the collector 1. To seal the annular gap between the sockets 6 and the smooth end of the pipes 7, the socket 6 of the pipe 6, for example, is laid on the bitumen mastic on the lower half of the perimeter of the socket 6 to the socket of each pipe. , from tarred hemp rope or porous rubber rope. When building the pipeline 5 on the seal 8 stack smooth end of the pipe 7.

В верхнюю половину раструбной щели уплотнитель 8 вставл ют после пристыковки трубы 7. Эту операцию выполн ют с легкого переносного мостика , который устанавливают в канале с опиранием на уложенные трубы 6 и 7 с помощью подъемного крана.A seal 8 is inserted into the upper half of the socket part after fitting the pipe 7. This operation is performed from a lightweight portable bridge, which is installed in the channel with the supporting pipes 6 and 7 supported by means of a crane.

В местах подключени  к трубопрово- .ду (закрытому коллектору) 5 дополнительных закрытых дрен 9 устанавливают нижние (опорные) железобетонные блоки смотровых колодцев 10, изготовленные в виде стаканов с проемами дл  ввода в них концов железобетон-:, ных труб 7, из которых монтируют трубопровод 5, и устьевых концов дрен- поглотителей 11. Дрены-поглотители 11 у смотровых колодцев 10 устраивают дл  того, чтобы облегчить подключение к колодцам действующих дополнительных закрытых горизонтальных дренIn the places of connection to the pipeline (closed collector) 5 additional closed drains 9, lower (supporting) reinforced concrete blocks of manholes 10 are installed, made in the form of glasses with openings for inserting the ends of reinforced concrete: 7 pipes, from which they are mounted pipeline 5, and the mouth ends of the drain-absorbers 11. The drain-absorbers 11 at the observation wells 10 are arranged in order to facilitate the connection to the wells of existing additional closed horizontal drains

9 путем обеспечени  самотечного (без механического водоотлива) осушени  котлованов, отрываемых дл  подключени  действующих дополнительных закрытых горизонтальных дрен, а также дл  того, чтобы уменьшить объем земл ных работ за счет уменьшени  размеров котлованов в осушенных дренами-поглотител ми грунтах.9 by providing gravity (without mechanical drainage) drainage of the pits to be torn off to connect existing additional closed horizontal drains, as well as to reduce the amount of earthworks by reducing the size of the pits in soils drained by drain drains.

Размещение дрен-поглотителей 11 зависит от того, как заканчивают прокладку дополнительных закрытых горизонтальных дрен 9 у смотровых колодцев 10 и от того, как выполн ют последние. При окончании прокладки дополнительных закрытых горизонтальных дрен 9 над коллектором 5 смотровые колодцы вначале выполн ют в виде поглощающих, а дрены-поглотители проThe placement of the sinks-absorbers 11 depends on how the laying of the additional closed horizontal drains 9 at the observation wells 10 and on how the latter are completed. At the end of the laying of additional closed horizontal drains 9 above the collector 5, the inspection shafts are initially carried out in the form of absorbing, and the absorber drains are

кладывают длиной по 3-4 м в обе стороны от колодцев 10 в пределах ширины открытой дрены 2 ниже верха поглощающих колодцев на 0,3-0,5 м и ниже дополнительных закрытых горизонтальных дрен 9. Дрены-поглотители 11 выполн ют из перфорированных асбесто- цементных труб диаметром 100-150 мм.lay 3-4 m long in both directions from wells 10 within the width of open drain 2 below the top of absorbing wells 0.3-0.5 m and below additional closed horizontal drains 9. Absorption drains 11 are made of perforated asbestos cement pipes with a diameter of 100-150 mm.

Над ними отсыпают гравийно-песча- ный объемный фильтр 12 общей высотой 0,3-0,5 м.A gravel-sand volume filter 12 with a total height of 0.3-0.5 m is poured over them.

Нижний блок смотрового колодца 10 перекрывают перфорированной (с отверсти ми в виде щелей мм) стальной крышкой 13 и на нее отсыпают ело- ем 10-15 см гравий 14 крупностью 5- 20 мм.The lower block of the manhole 10 is covered with a steel lid 13 punched (with holes in the form of mm slits) and covered with 10–15 cm gravel 14 with a size of 5-20 mm on it.

Выполненные таким образом поглощающие колодцы 10 и дрены-поглотители 11 засыпают грунтом на всю глубину открытой дрены 2. Во избежани.е просадки грунта под давлением дреноукладчи- ка его вокруг колодцев уплотн ют путем укатки бульдозером.The absorbing wells 10 thus constructed and the absorbing drains 11 are covered with soil over the entire depth of the open drain 2. To avoid subsidence of the soil under pressure from the puller around the wells, it is compacted by rolling with a bulldozer.

При окончании прокладки дополнительных закрытых горизонтальных дренAt the end of the laying of additional closed horizontal drains

9перед колодцами 10, смонтированными до поверхности земли, дрены-поглотители 11 прокладывают с одной стороны от колодцев 10 вверх по уклону. От смотровых колодцев 10 одноковшовым экскаватором отрывают траншеи глубиной на 0,3-0,5 большей глубины заложени  дополнительных закрытых горизонтальных дрен 9 и в них прокладывают дрены-поглотители 11 длиной по 810м , прин той из услови  обеспечени  свободного перетока воды из пред- устьевых участков дополнительных9 before the wells 10, mounted to the surface of the earth, the drain-absorber 11 is laid on one side of the wells 10 up the slope. From viewing wells 10, trenches 0.3-0.5 deeper in depth with additional horizontal horizontal drains 9 are laid out with a single-bucket excavator and sink-absorbers 11 are laid with a length of 810m, taken from the condition of providing free flow of water from the mouth sections additional

00

00

5five

00

,, ,,

закрытых горизонтальных дрен в дрены-поглотители . Над последними укладывают устьевые участки 15 дополнительных закрытых горизонтальных дрен 9 в чехлах длиной по 3-4 м из асбес- тоцементных труб. После этого засыпают коллектор грунтом с уплотнением его у колодцев. По окончании засыпки трубопровода 6 и смонтированных по его длине смотровых (поглощающих) колодцев 10 с дренами-поглотител ми 11 в предшествующей переустраиваемой открытой дрене 2, в такой же последовательности провод т работы на следующем коллекторе 5, двига сь вверх по уклону основного открытого коллектора 1.closed horizontal drains in sinks absorbers. Over the latter, the mouth sections of 15 additional closed horizontal drains 9 are laid in covers 3-4 m long from asbestos-cement pipes. After this, the collector is filled up with soil and compacted at wells. Upon completion of filling the pipeline 6 and viewing (absorbing) wells 10 installed along its length with absorber drains 11 in the previous open drain 2 that is being rebuilt, the next collector 5 is moved upwards along the slope of the main open collector 1 .

В процессе переустройства очередной открытой дрены 2 перед засыпкой траншеи у смотровых колодцев 10 от них начинают прокладку дополнительных горизонтальных дрен 9 вниз по уклону в сторону предыдущего коллек- 5 тора 5, которую заканчивают над дренами-поглотител ми 11 .In the process of rebuilding the regular open drain 2 before backfilling the trench at the observation wells 10, they begin to lay additional horizontal drains 9 down the slope in the direction of the previous collector 5, which ends above the drain sinks 11.

Прокладку дополнительных закрытых дрен 9 осуществл ют узкотраншейным дреноукладчиком, например ЭТЦ-406 АУ или ДУ-3502. Дренажные трубопроводы 9 выполн ют из гофрированных пластмассовых труб с фильтром, создающим наименьшее фильтрационное сопротивление дрены и обеспечивающим приток воды в дренажный трубопровод 9 по всей поверхности контакта с водо- вмешающим грунтом. Укладку дрен 9 ведут в водонасыщенных грунтах (под уровнем грунтовых вод), Истоковые конец его затыкают пробкой, уложенный вAdditional closed drains 9 are laid by a narrow-pitched pitcher, for example, ETC-406 AU or DU-3502. Drainage pipelines 9 are made of corrugated plastic pipes with a filter that creates the lowest filtration resistance of the drain and ensures the flow of water into the drainage pipe 9 over the entire surface of contact with water-interfering soil. Laying of drains 9 is carried out in water-saturated soils (below the groundwater level). Its source end is plugged with a plug, laid in

траншею (щель) дренажный трубопровод 9 засыпают сразу же грунтом, который насыщаетс  водой. Из грунта вода постепенно проникает через фильтровую оболочку в дренажный трубопровод 9 и наполн ет его на участке от истока дрены. По мере продвижени  дреноуклад- чика вниз по уклону в полости дренажного трубопровода 9 образуетс  поток воды, движущейс  вслед за дреноуклад0The trench (slit) of the drainage pipe 9 is immediately filled up with soil, which is saturated with water. From the soil, water gradually penetrates through the filter sheath into the drainage pipe 9 and fills it in the area from the source of the drain. As the draining machine moves down the slope in the cavity of the drainage pipe 9, a stream of water flows following the drainage structure.

5five

5five

чиком. На участке укладки дренажного трубопровода 9 на дно траншеи (щели) и его засыпки грунтом, а также в зоне неполного насыщени  грунта водой происходит истечение воды из дренажного трубопровода 9 в траншею и в грунт обратной засыпки. Благодар  этому на данном участке не происходит интенсивна  кольматаци  фильтра глинистойchikom. At the site of laying the drainage pipeline 9 to the bottom of the trench (slot) and filling it with soil, as well as in the zone of incomplete soil saturation with water, water flows out of the drainage pipeline 9 into the trench and into the backfill soil. Due to this, there is no intensive mud filtering at this site.

ракцией пульпы и на его поверхности е образуетс  слабопроницаемый слой з глинистых частиц, который резко снижает приток воды в дренажный тру- с бопровод 9. Такой слой (пленка) на фильтре, как правило, образуетс  при укладке дрены от усть  (коллектора) к истоку.A poorly permeable layer of clay particles is formed by pulpation and on its surface, which drastically reduces the flow of water into the drainage pipeline 9. Such a layer (film) on the filter usually forms when laying drains from the mouth (collector) to the source.

По мере удалени  дреноукпадчика JQ от истока дрены зона притока воды в дренажный трубопровод 9 постепенно удлин етс  и напор воды в нем у дре- ноукладчика возрастает.As JQ is removed from the drain source, the area of water inflow into the drain pipe 9 gradually lengthens and the water pressure in it at the borehole grows.

Вследствие этого увеличиваетс  jj истечение воды из дренажного трубопровода 9 в траншею, уровень воды в ней повышаетс  и создаетс  гидростатическое противодавление на стенки траншей. Это противодавление предот- JQ вращает фильтрационный выпор грунта и обрушение стенок траншеи на ее длине от забо  до места засыпки вынутым грунтом позади трубоукладчика (бункера ) , обеспечивает разработку грунта 25 на забое и равномерное движение дреноукпадчика .As a result, jj increases in the outflow of water from the drainage pipeline 9 into the trench, the water level in it rises and hydrostatic back pressure is created on the walls of the trenches. This backpressure prevents JQ from rotating the soil outflow and collapsing the trench walls from the bottom to the backfill site with excavated material behind the pipelayer (bunker), ensures the development of the soil 25 to the bottom and the uniform movement of the plow.

При приближении к смотровому колод- цу 10 на предыдущем коллекторе 5 дренажный трубопровод 9 обрезают на 0 барабане дреноукпадчика так, чтобы его конец перекрыл поглощающий колодец (дрену-поглотитель) 11 или разместилс  в траншее перед устьевым участком 15, если смотровой колодец 10 смонтирован до поверхности земли.When approaching to the observation well 10 on the previous collector 5, the drainage pipe 9 is cut off at the 0th drum of the incanion shaft so that its end blocks the absorbing well (drain-absorber) 11 or placed in the trench in front of the wellhead section 15, if the observation well 10 is mounted to the surface land.

Торец дренажного трубопровода 9 во избежание сосредоточенного истечени  из него воды закрывают негерметичной пробкой, например, из меткови- , ны. По окончании укладки дренажного трубопровода 9 трубоукладчик (бункер ) дреноукпадчика выглубл ют и переезжают на очередную позицию. Уложенна  дрена 9 работает и вода из нее через фильтр вытекает на конечном (предустьевом) участке дренажно го трубопровода 9 длиной 4-6 м и через песчаный фильтр 12 перетекает в дрену-поглотитель 11, а из нее - в стакан смотрового колодца 10.The end of the drainage pipe 9 in order to avoid concentrated outflow of water from it is closed by an unpressurized plug, for example, from a vial. At the end of the laying of the drainage pipe 9, the pipelayer (bunker) of the plow maker is excavated and moved to the next position. The installed drain 9 works and water from it through the filter flows out at the final (pre-outlet) section of the drainage pipeline 9 with a length of 4-6 m and flows through the sand filter 12 into the drain-absorber 11, and from it into the glass of the manhole 10.

В дальнейшем дополнительные закры- тые горизонтальные дрены 9 вскрывают над поглощающими колодцами 10 и дренами-поглотител ми 11 с помощью одно- ковшового экскаватора и подключают к колодцам 10. Если смотровые колодцы 10 смонтированы до поверхности земли , то котлованы 16 дл  подключени Subsequently, additional closed horizontal drains 9 are opened above the absorbing wells 10 and the absorber drains 11 using a single bucket excavator and connected to the wells 10. If the observation wells 10 are mounted to the ground, the pits 16 are to be connected

3535

4545

5050

5 five

0 0

5five

5five

00

дополнительных закрытых горизонтальных дрен 9 отрывают р дом с ними вверх по уклону над дренами-поглотител ми 11 и подключают дополнительные закрытые горизонтальные дрены 9 к их устьевым участкам 15.Additional closed horizontal drains 9 are pulled up with them up the slope above the sinks-absorbers 11 and connect additional closed horizontal drains 9 to their wellhead sections 15.

На заключительном этапе работ отстраивают смотровые колодцы 10 (монтируют на них оголовки с крышками) и планируют поверхность обратной засыпки над коллектором 5. В дальнейшем работы в такой же последовательности ведут не выше расположенных по уклону переустраиваемых открытых дренах.At the final stage of the work, the manholes 10 are rebuilt (they are mounted on the heads with lids) and the backfilling surface above the collector 5 is planned. In the future, work in the same sequence is carried out not higher than the open drains located along the slope.

В случае, когда закрытые горизонтальные дрены подключают непосредственно к открытому коллектору, открытые дрены углубл ют и используют в качестве пионерных дл  предварительного осушени . Параллельно им и в направлении от истоков к усть м прокладывают закрытые горизонтальные дрены. Подключение их к открытому коллектору осуществл ют обычным способом , например путем выполнени  прорези экскаватором или гидропроколом. После этого открытые дрены засыпают.In the case where closed horizontal drains are connected directly to an open collector, open drains are deepened and used as pioneers for pre-drainage. Parallel to them and in the direction from the headwaters to the mouths, closed horizontal drains are laid. Connecting them to an open collector is carried out in the usual way, for example, by making a slot with an excavator or a hydraulic drill. After this, the open drains fall asleep.

Claims (3)

1. Способ реконструкции открытого горизонтального дренажа, включающий переустройство открытых дрен в закрытые дрены или коллекторы путем углублени  их прокладки в них трубопроводов с одновременным устройством смотровых колодцев в местах подключени  дополнительных закрытых горизонтальных дрен и последующей засыпки грунтом, прокладку дополнительных закрытых горизонтальных дрен и подключение их к закрытым коллекторам в смотровых колодцах, отличающийс  тем, что, с целью снижени  стоимости строительных работ и повышени  надежности закрытой коллекторно-дренажной сети, прокладку трубопроводов ведут по дну углубленных открытых дрен в направлении от истоков к усть м, от смотровых колодцев прокладывают дрены-поглотители на глубине, превышающей глубину заложени  дополнительных закрытых горизонтальных дрен,-после чего осуществл ют засыпку коллектора и дрен-поглотителей грунтом с уплотнением его у колодцев, при этом перед засыпкой1. A method of reconstructing open horizontal drainage, which includes rebuilding open drains into closed drains or collectors by deepening their pipelines in them with simultaneous installation of manholes in the places where additional closed horizontal drains are connected and then filled with soil, laying additional closed horizontal drains and connecting them to closed collectors in manholes, characterized in that, in order to reduce construction costs and increase reliability a closed collector-drainage network, pipelines are laid along the bottom of deep open drains in the direction from the sources to the mouths, from the manholes lay absorbing drains at a depth exceeding the laying depth of additional closed horizontal drains, after which the collector and drains are filled up sinks with soil with its consolidation at wells, at the same time before filling коллектора и дрен-поглотителей у колодцев от последних начинают прокладку дополнительных закрытых горизонтальных дрен вниз по уклону в сторону уложенного коллектора, которую заканчивают над дренами-поглотител ми колодца ранее уложенного коллектора, вскрывают устьевый участок дополнительной закрытой дрены путем отрывки котлована и подключают его к колодцу с последующей засыпкой котлована.the collector and sinks at wells from the latter begin laying additional closed horizontal drains down the slope towards the laid collector, which is completed above the drain sinks of the well of the previously laid collector, opening the wellhead section of the additional closed drain by fragments of the pit and connecting it to the well with subsequent backfilling of the pit. 2. Способ по п. 1, отличающийс  тем, что смотровые ко92. The method according to claim 1, characterized in that the inspection rooms н & n & 5Yu Фиг 2Fig 2 лодцы вначале выполн ют в виде поглощающих , а достраивают их после прокладки и подключени  к ним дополнительных закрытых горизонтальных дрен.The boats are initially made in the form of absorbing ones, and they are completed after laying and connecting to them additional closed horizontal drains. 3. Способ по п. 1, отличающийс  тем, что при устройстве смотровых колодцев до поверхности земли над дренами-поглотител ми укладывают устьевые участки дополнительных закрытых горизонтальных дрен до прокладки этих дрен.3. A method according to claim 1, characterized in that when arranging viewing wells, the wellhead sections of additional closed horizontal drains are laid above the sink drains before the laying of these drains. //// 1313 && . - | ч-цжтт тгту|11 w f. - | | h-tszhtt tgtu | 11 w f й ЩгйЩщ  Ч SCHGSCHSCHSCH Фиг АFIG A
SU884379930A 1988-01-22 1988-01-22 Method of reconstructing open horizontal drainage SU1557254A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884379930A SU1557254A1 (en) 1988-01-22 1988-01-22 Method of reconstructing open horizontal drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884379930A SU1557254A1 (en) 1988-01-22 1988-01-22 Method of reconstructing open horizontal drainage

Publications (1)

Publication Number Publication Date
SU1557254A1 true SU1557254A1 (en) 1990-04-15

Family

ID=21356259

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884379930A SU1557254A1 (en) 1988-01-22 1988-01-22 Method of reconstructing open horizontal drainage

Country Status (1)

Country Link
SU (1) SU1557254A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ВСН 33-2.2 03-86 Мелиоративные системы и сооружени . Дренаж на орошаемых земл х. Нормы проектировани . Альбом. Конструкции горизонтального, вертикального и комбинированного дренажа. Минводхоз СССР, В/О Союзвод- проект, 1986, л. 5, 10. *

Similar Documents

Publication Publication Date Title
CN110219359A (en) A kind of Submersed type inspection well and its construction method
KR100721225B1 (en) Drainage structure for soft ground treatment and dehydration method
CN107700507B (en) Dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank
CN114606964B (en) Foundation pit dewatering method used under complex geological conditions
CN111608174A (en) Karst area karst cave treatment method based on punched cast-in-place pile
SU1557254A1 (en) Method of reconstructing open horizontal drainage
CN113152633B (en) Construction method of permeable structural system
RU2195530C2 (en) Process of construction of drainage system
CN210315908U (en) Immersed tube type inspection well
CN109779682B (en) Water-rich section highway tunnel escape canal structure system
KR20020000318A (en) Method of horizontal drainage for pore water pumping of soft ground improvement
CN221167881U (en) Foundation pit hydrophobic structure suitable for under rich water stratum condition
RU2074924C1 (en) Method for construction of combination drainage
CN109630192A (en) A kind of precipitation method suitable for the construction of half diagenesis bored tunnel
CN108570998A (en) The construction method of lowering of watertable during a kind of subgrade construction
CN113833524B (en) Double-hole box culvert for treating karst area tunnel water burst and construction method thereof
CN217839567U (en) Asphalt pavement structure permeates water
CN114775620B (en) Construction method for progressive excavation of plain riverbank under mucky soil condition
CN212153647U (en) Drainage facility suitable for water source area protection district excavation highway section
CN109973147B (en) Construction method of highway tunnel drainage ditch
KR200322969Y1 (en) A drainage promotion apparatus of subsurface water
JP2562066Y2 (en) Structure of rainwater storage and infiltration facility
JPH0465932B2 (en)
SU1463857A1 (en) Method of constructing trenchless drainage system
JPH0841956A (en) Drain infiltrating structure