SU1546644A1 - Arrangement for delivering muck when sinking a sinkable well - Google Patents

Arrangement for delivering muck when sinking a sinkable well Download PDF

Info

Publication number
SU1546644A1
SU1546644A1 SU874359793A SU4359793A SU1546644A1 SU 1546644 A1 SU1546644 A1 SU 1546644A1 SU 874359793 A SU874359793 A SU 874359793A SU 4359793 A SU4359793 A SU 4359793A SU 1546644 A1 SU1546644 A1 SU 1546644A1
Authority
SU
USSR - Soviet Union
Prior art keywords
receiving
conveyor
bunker
well
loading conveyor
Prior art date
Application number
SU874359793A
Other languages
Russian (ru)
Inventor
Andrej A Stroev
Yurij I Levitin
Leonid V Muravev
Vladimir P Samojlov
Original Assignee
Sp Kt Byuro Glavmosinzhstroya
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sp Kt Byuro Glavmosinzhstroya filed Critical Sp Kt Byuro Glavmosinzhstroya
Priority to SU874359793A priority Critical patent/SU1546644A1/en
Application granted granted Critical
Publication of SU1546644A1 publication Critical patent/SU1546644A1/en

Links

Landscapes

  • Loading Or Unloading Of Vehicles (AREA)

Description

Изобретение относится к под- . земному строительству и позволяет снизить трудоемкость эксплуатации.The invention relates to sub-. earth construction and reduces the complexity of operation.

Для этого с поворотным в вертикальFor this with a swivel vertical

ной плоскости загрузочным конвейером (К) 5 шарнирно соединена приемная конвейерная секция (ПКС) 9, а иод ней, загрузочным К 5 и его приемным бункером (ПБ) 6 с возможностью контактирования с ними и поворота в , вертикальной и горизонтальной плоскостях установлена опорная рама 4.The loading conveyor section (K) 5 is pivotally connected to the receiving conveyor section (PKS) 9, and iodine, loading K 5 and its receiving bunker (PB) 6 with the possibility of contact with them and turning in, the vertical and horizontal planes have a support frame 4 .

На ней шарнирно с возможностью поворота в вертикальной плоскости закреплен ПБ 6. На внутренних стенках опускного колодца 3 закреплены наклонные К. Кроме того, ПБ 6 и ПКС 9 могут быть снабжены жестко закрепленными на них рычагами,' которые соединены между собой продольными тягами. Последние входят в выполненные по радиусу на одинаковом расстоянии от оси шарниров 12 рычагов ПБ 6 пазы и соединены с ры~PB 6 is fixed on it pivotally with the possibility of rotation in the vertical plane. Inclined K are fixed on the inner walls of the drop well 3. In addition, PB 6 and PKS 9 can be equipped with levers rigidly fixed on them, which are interconnected by longitudinal rods. The latter are included in the 12 levers of the PB 6 slots made along the radius at the same distance from the axis of the hinges and connected to the fish ~

1Ф99НГ"’ П81F99NG "’ P8

Фи-г.6Fi-g6

66

33

15466441546644

4four

чагам’и ПКС 9 и ПБ 6 пальцами. Рама 4 периодически с К 5 и ПБ 6 переставляется на новое место стоянки в плане путем поворота рамы 4 вместе с К 5 в. двухшарнирной'подвеске. Для ! ремонта и очистки ПКС 9 поднимаютchagam’i PKS 9 and PB with 6 fingers. Frame 4 periodically with K 5 and PB 6 is rearranged to a new parking space in the plan by rotating frame 4 together with K 5 c. double-hinged suspension For! repair and cleanup PKS 9 raise

ПБ 6. При этом ПБ 6 поворачивается,' а пазы скользят по пальцам. Тяги, PB 6. At the same time PB 6 turns, 'and the grooves slide on the fingers. Traction

а вместе с ними и ПКС 9 остаются на месте. Одновременно с дальнейшим поворотом ПБ 6 начинает подниматься ПКС 9, поворачиваясь в шарнирах 10. После достижпния ПБ 6 упора 30 на раме 4 раскрываются стыки между ПБ 6, ПКС 9 и рамой 4 для ремонта. 1 з. п. ф-лы, 6 ил.and with them, the PKS 9 remain in place. Simultaneously with the further rotation of PB 6, the PKS 9 starts to rise, turning in the hinges 10. After PB 6 has reached the stop 30 on the frame 4, the joints between PB 6, PKS 9 and frame 4 for repair are opened. 1 h. item f-ly, 6 ill.

Изобретение относится к подземному строительству и касается уст1ройств для выдачи грунта при погружении опускных колодцев. .The invention relates to an underground construction, and regards one mouth for dispensing roystv soil immersion sunk wells. .

Цель изобретения - снижение трудоемкости эксплуатации.The purpose of the invention is to reduce the complexity of operation.

Па фиг.1 изображено устройство для выдачи разработанного грунта из опускного колодца, вид сбоку; на фиг.2 - то же, вид сверху; на фиг.З вид А на фиг. 2 (.вид на установку приемного бункера и приемной секции за-'· грузочного конвейера); на фиг.4 г разрез Б-Б на фиг.З; на фиг.5 - разрез В-В на фиг.З; на фиг.6 - приемный бункер и приемная секция загрузочного конвейера,поднятое для технического обслуживания положение.PA figure 1 shows a device for the issuance of the developed soil from the bottom of the well, side view; figure 2 is the same, top view; in FIG. 3, view A in FIG. 2 (. View of the installation of the receiving bunker and the receiving section of the loading conveyor); in Fig.4 g section bB in fig.Z; figure 5 - section bb In fig.Z; figure 6 - receiving hopper and the receiving section of the loading conveyor, raised for maintenance position.

Устройство для выдачи грунта при погружении опускного колодца включает наклонные конвейеры 1, закрепленные на внутренних стенках 2 опускного колодца 3, опорную раму 4, .установленную под приемной конвейерной секцией загрузочного конвейера 5 ленточного типа и приемным бунке ром 6. Приемная секция конвейера 5 через опорную раму 4 оперта на забой колодца 3. За загрузочным конвейером 5 установлена нижняя секция 7 наклонных конвейеров 1. Опорная рама 4 закреплена на внутренних стенах 2 крлодца 3 посредством двухшарнирной подвески 8 с возможностью поворота в вертикальной и горизонтальной плоскостях, а приемная секция 9 загрузочного конвейера 5 и приемный бункер 6 выполнены поворотными в вертикальной плоскости и закреплены посредством шарниров 10, 11 и 12. Приемный бункер бможет быть 'снабжен жестко закрепленными на нем рычагами 13 и 14, а приемная конвейерная секция 9 загрузочного конвейера 5 - жестко закрепленными на ней рычагами 15 и 16, Рычаги 13, 14The device for dispensing soil when the drop well is submerged includes inclined conveyors 1 fixed on the inner walls 2 of the drop well 3, the supporting frame 4 installed under the receiving conveyor section of the belt-type loading conveyor 5 and the receiving bin rom 6. The receiving section of the conveyor 5 through the supporting frame 4 supported on the bottom of the well 3. Behind the loading conveyor 5, the lower section 7 of inclined conveyors 1 is installed. The supporting frame 4 is fixed on the inner walls 2 of the worm 3 by means of a double-hinged suspension 8 with the possibility oroty in the vertical and horizontal planes, and the receiving section 9 of the loading conveyor 5 and the receiving bunker 6 are made rotatable in a vertical plane and fixed by means of hinges 10, 11 and 12. The receiving bunker can be 'provided with levers 13 and 14 rigidly fixed on it, and the receiving conveyor section 9 of the loading conveyor 5 - by means of levers 15 and 16 fixed on it, Levers 13, 14

и 15, 16 соединены между собой про15 дольными тягами 17, 18, причем со стороны рычагов 13, 14 приемного бункера 6 тяги 17, 18 входят в круговые пазы 19, 20, выполненные по радиусу на одинаковом расстоянии отand 15, 16 are interconnected by means of longitudinal rods 17, 18, and on the side of the levers 13, 14 of the receiving hopper 6, the rods 17, 18 enter circular grooves 19, 20, which are made along the radius at the same distance from

20 оси шарниров 12 рычагов 13, 14. Тяги 17, 18 соединены с рычагами 13-16 при помощи пальцев 21-24. Приемная секция 9 загрузочного конвейера 5 в рабочем положении оперта на опор25 ную раму 4 поверхностями 25 и 26, а опорная рама 4 оперта на забой колодца 3. Для разработки и погрузки грунта в колодце служат гидравлический. экскаватор 27 и бульдозер 28,. а20 axis hinges 12 levers 13, 14. Traction 17, 18 are connected with levers 13-16 using fingers 21-24. The receiving section 9 of the loading conveyor 5 in the working position is supported on the supporting frame 4 by surfaces 25 and 26, and the supporting frame 4 is supported on the bottom of the well 3. Hydraulic is used for developing and loading the soil in the well. excavator 27 and bulldozer 28 ,. but

30 для выдачи грунта, за пределы колодца - разгрузочный бункер 29.30 for the issuance of soil, beyond the well - discharge hopper 29.

Опорная рама 4 имеет упор 30 для .ограничения перемещения приемного бункера 6 при его подъеме.The support frame 4 has an abutment 30 for limiting the movement of the receiving hopper 6 when it is raised.

35 Устройство, работает следующим образом.35 The device works as follows.

Внутрь опускного колодца 3 помещают гидравлический экскаватор 27 и бульдозер 28, которые ведут раз40 работку грунта в колодце и его погрузку через приемный бункер 6 наA hydraulic excavator 27 and a bulldozer 28 are placed inside the well 3, which excavates the soil in the well and loads it through the receiving bin 6 on

’ приемную секцию 9 загрузочного конвейера 5. Поступающий грунт передается конвейерами 1 за пределы колодца’Receiving section 9 of the loading conveyor 5. Incoming soil is conveyed by conveyors 1 to the outside of the well

45 через бункер 29. Периодически опорная рама 4 с загрузочным конвейером 5 и приемным бункером 6 переставляется при помощи грузоподъемных средств, например кранов, на новое место стоянки в плане путем поворота рамы. 4 вместе с загрузочным конвейером в двухшарнирной подвеске 8.45 through the bunker 29. Periodically supporting frame 4 with a loading conveyor 5 and receiving hopper 6 is rearranged with the help of lifting means, such as cranes, to a new parking place in the plan by rotating the frame. 4 together with a loading conveyor in a double-hinged suspension 8.

При необходимости выполнения работ по очистке или ремонту приемной секции 9 загрузочного конвейера.If it is necessary to perform work on cleaning or repairing the receiving section 9 of the loading conveyor.

5 приемный бункер 6 поднимают. При.5 receiving hopper 6 lift. At.

этом бункер 6 поворачивается, а пазы 19, 20 скользят по пальцам 23,This bunker 6 is rotated, and the grooves 19, 20 slide on the fingers 23,

24. Тяги 17, 18, а вместе с ними и24. Traction 17, 18, and with them

5five

15466441546644

66

приемная секция 9 остаются на месте. При достижении торцами пазов поверхностей пальцев 23, 24 последние нажимают на тяги 17, 18, после чего одновременно ; с дальнейшим поворотом приемного бункера 6 начинает подниматься, поворачиваясь в шарнирах 10, II, приемная секция 9 загрузочного конвейера 5. Подъем продолжается, пока приемный бункер 6 не дойдет до упора 30 на опорной раме 4. При этом рыскрываются стыки между приемным бункером 6, приемной секцией 9 загрузочного конвейера 5 15receiving section 9 remain in place. When the ends of the grooves of the surfaces of the fingers 23, 24 last click on the thrust 17, 18, then at the same time; with further rotation of the receiving hopper 6 begins to rise, turning in the hinges 10, II, the receiving section 9 of the loading conveyor 5. The lifting continues until the receiving bunker 6 reaches the stop 30 on the supporting frame 4. At the same time, the joints between the receiving bunker 6, the receiving section 9 loading conveyor 5 15

и опорной рамой 4. После выполнения требуемых ремонтных работ возвращают приемный бункер 6 в рабочее положение, при этом предварительно под собственным весом устанавливается в 20 рабочее положение приемная конвейерная секция 9 загрузочного конвейера 5.and the support frame 4. After the required repair work has been completed, the receiving bunker 6 is returned to the working position, while the receiving conveyor section 9 of the loading conveyor 5 is set to 20 working position.

Claims (2)

Формула изобретенияClaim 2525
  • 1. Устройство для выдачи грунта при погружении опускного колодца,, включающее разгрузочный бункер, закрепленные на стенах опускного колодца наклонные конвейеры, поворотный ™ 1. A device for dispensing soil when the bottoming well is submerged, including a discharge bunker, mounted on the bottoming pit walls, inclined conveyors, rotary ™
в вертикальной плоскости загрузочный конвейер и приемный бункер загрузочного конвейера, о т л и ч а тоще е с я тем, что, с целью снижения трудоемкости эксплуатации, оно снабжено приемной · конвейерной секцией, шарнирно соединенной с загрузочным конвейером, и опорной рамой, установленной под приемной конвейерной секцией, загрузочным конвейером и приемным бункером с возможностью контактирования с ними и поворота в вертикальной и горизонтальной плоскостях, а приемный бункер шарнирно закреплен на опорной раме с возможностью поворота в вертикальной плоскости,in the vertical plane, the loading conveyor and the receiving bunker of the loading conveyor, that is, so that, in order to reduce the complexity of operation, it is equipped with a receiving conveyor section, hinged to the loading conveyor, and a supporting frame installed under the receiving conveyor section, the loading conveyor and the receiving bunker with the possibility of contacting with them and turning in the vertical and horizontal planes, and the receiving bunker is pivotally fixed to the supporting frame with the possibility of turning in the vertical kalny plane,
2 о Устройство поп.1, отличающееся тем, оно снабжено тягами и установленными в шарнирах приемной конвейерной секции и приемного бункера рычагами, причем рычат ги, установленные в шарнирах приемного бункера, выполнены с круговыми пазами, а тяги шарнирно соединены одними концами с рычагами, установленными в шарнирах приемной конве- йерной секций, и установлены другими концами в круговых пазах.2 o Device pop.1, characterized in that it is equipped with rods and levers installed in the hinges of the receiving conveyor section and receiving hopper, the levers installed in the joints of the receiving hopper are made with circular grooves, and the rods are pivotally connected to the ends of the levers installed in the joints of the receiving conveyor sections, and installed with other ends in circular slots. 15466441546644 15466441546644 6-56-5 Фиг.44 з-βs-b
SU874359793A 1987-12-21 1987-12-21 Arrangement for delivering muck when sinking a sinkable well SU1546644A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874359793A SU1546644A1 (en) 1987-12-21 1987-12-21 Arrangement for delivering muck when sinking a sinkable well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874359793A SU1546644A1 (en) 1987-12-21 1987-12-21 Arrangement for delivering muck when sinking a sinkable well

Publications (1)

Publication Number Publication Date
SU1546644A1 true SU1546644A1 (en) 1990-02-28

Family

ID=21348132

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874359793A SU1546644A1 (en) 1987-12-21 1987-12-21 Arrangement for delivering muck when sinking a sinkable well

Country Status (1)

Country Link
SU (1) SU1546644A1 (en)

Similar Documents

Publication Publication Date Title
US3965995A (en) Machine for boring a large diameter blind hole
GB1505128A (en) Semi-submersible supporting platform
US2910274A (en) Excavating apparatus
SU1546644A1 (en) Arrangement for delivering muck when sinking a sinkable well
US3747697A (en) Self-loading drill rig hopper
US3791464A (en) Auger drill and conveyor
CN221683019U (en) Novel soil discharging device
RU1793057C (en) Vertical mine working drive device
US2957581A (en) Portable slush pit assembly
SU1479654A1 (en) Arrangement for sinking vertical shafts
SU1553644A1 (en) Mobile drilling unit
US3045841A (en) Silo unloader
SU1434123A1 (en) Excavating complex
SU1682561A1 (en) Powered mine roof support
JPS6378928A (en) Continuous and vertical soil discharger for pit in steel tower foundation
US4249845A (en) System for reclaiming bulk solids from a storage pile
US3729231A (en) Narrow rock cutting trencher
SU1636524A1 (en) Floating underwater soil placer
SU1023056A1 (en) Apparatus for drilling test pits
SU1116168A1 (en) Machinery unit for working steep seams
SU926279A1 (en) Device for charging boreholes with containerized explosives
SU134630A1 (en) Device for cleaning the bottom of pools from solid precipitation
JPH11148254A (en) Vertically carrying device and drilling device
JPS61238605A (en) Conveyor
SU1110851A1 (en) Support structure