SU1474242A1 - Arrangement for assembling dome-like structures - Google Patents
Arrangement for assembling dome-like structures Download PDFInfo
- Publication number
- SU1474242A1 SU1474242A1 SU874193127A SU4193127A SU1474242A1 SU 1474242 A1 SU1474242 A1 SU 1474242A1 SU 874193127 A SU874193127 A SU 874193127A SU 4193127 A SU4193127 A SU 4193127A SU 1474242 A1 SU1474242 A1 SU 1474242A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- elements
- frames
- cables
- base
- shaped
- Prior art date
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Изобретение относитс к строительству, в частности к по сному монтажу сферических и куполообразных сооружений. Целью изобретени вл етс повышение удобства производства работ. Устройство дл монтажа содержит установленные за контурами возводимого сооружени с его диаметрально противоположных сторон опоры в виде рам 1 и 2. Причем две рамы 1 вл ютс просто опорными, а две рамы 2 вл ютс рабочими. Все рамы установлены на основании 3. Через рамы перекинуты несущие тросы 5, соединенные одними концами с т говыми элементами в виде установленных у основани рабочих рам 2 приводных барабанов 4. На тросах 5 смонтированы подвижно вдоль них фиксаторы дл монтируемых элементов сооружени . Каждый фиксатор 8 выполнен в виде установленных с верхней стороны троса 5 и шарнирно соединенных между собой П - образных элементов, ориентированных полкой вниз. Каждый из элементов оснащен зажимом 13 дл монтируемых элементов и расчалкой 10, соединенной с соответствующим основанием 3 рамы 1 или 2. 4 ил.The invention relates to the construction, in particular to the clear installation of spherical and dome-shaped structures. The aim of the invention is to improve the ease of operation. The device for installation contains supports in the form of frames 1 and 2 installed behind the contours of the erected structure with its diametrically opposite sides. Moreover, two frames 1 are simply supporting, and two frames 2 are working. All frames are mounted on the base 3. Carrier cables 5 are overlaid through the frames, connected at one end to the pull elements in the form of the driving drums 4 installed at the base of the working frames 4. On the cables 5, clamps for the installed building elements are mounted movably along them. Each latch 8 is made in the form of U-shaped elements installed from the upper side of the cable 5 and pivotally interconnected P-shaped elements, oriented with the shelf down. Each of the elements is equipped with a clip 13 for the mounted elements and a brace 10 connected to the corresponding base 3 of the frame 1 or 2. 4 sludge.
Description
г/g /
7777
//
/ Ц1/ C 1
4Х2 Фие.14X2 Fie.1
1one
4Х2 Ю Фие.14Х2 Ю Фие.1
Изобретение относитс к устройствам дл возведени сферических и куполообразных сооружений, преимущественно из стеклопластиков, и может быть использовано при сборке сферических и куполообразных сооружений из сборного железобетона и при сборке металлических резервуаров больших размеров сферических и цилиндрических форм.The invention relates to devices for the erection of spherical and dome-shaped structures, mainly of glass-reinforced plastics, and can be used in the assembly of spherical and dome-shaped structures from precast concrete and in the assembly of metal tanks of large spherical and cylindrical shapes.
Целью изобретени вл етс повышение удобства производства работ.The aim of the invention is to improve the ease of operation.
На фиг. 1 изображено устройство, вид сбоку; на фиг. 2 - то же, план; на фиг. 3 - зажим дл монтируемых элементов; на фиг. 4 - вид А на фиг. 3.FIG. 1 shows a device, side view; in fig. 2 - the same plan; in fig. 3 - clamp for mounted elements; in fig. 4 is a view A of FIG. 3
Устройство состоит из четырех опор в ви- де рам - двух поддерживающих рам 1 и двух рабочим рам 2, изготовленных из уголков, жестко прикрепленных к основанию 3.The device consists of four supports in the form of - two supporting frames 1 and two working frames 2, made of corners, rigidly attached to the base 3.
Рама 2 агрегатирована приводным барабаном 4. Несущий трос 5, сматыва сь или наматыва сь на барабан 4, контактирует с роликом 6, вращающимс на оси, прикрепленной к раме 2 в верхней ее части, и закрепл етс жестко на раме 1. Кажда симметрична пара опор - рабоча 2 и поддерживающа 1, соединены между собой двум тросами 5 так, что в центре при перекрещивании тросов 5 образуетс квадрат, сторона которого равна стороне квадрата, вписанного в окружность, которой вл етс периметр верхнего по са (крышки) монтируемого сооружени 7. На каждой паре тросов 5 рагположены два фиксатора 8, свободное перемещение которых вдоль тросов 5 и контакт с ними обеспечиваетс кольцами 9, шарнирно закрепленными на фиксаторах 8. Обеспечение уставов- ки в период подъема и после подъема смонтированного любого по са сооружени 7 в заданных проектных координатных точках пространства производитс при помощи расчалок 10, изготовленных из тросов заданных длин дл каждого по са, закреп- л ющихс одним концом к фиксатору 8, а другим - к соответствующему основанию рамы 1 или 2. Подставки 11 обеспечивают регулировку зазоров при стыковке последующего по са сооружени 7 с предыдущим при их сборке.The frame 2 is aggregated by the drive drum 4. The carrier cable 5, winding or winding on the drum 4, contacts the roller 6 rotating on an axis attached to the frame 2 in its upper part, and is fixed rigidly on the frame 1. Each symmetrical pair of supports - working 2 and supporting 1 are interconnected by two cables 5 so that in the center when crossing cables 5, a square is formed, the side of which is equal to the side of the square inscribed in a circle, which is the perimeter of the upper belt (cover) of the erected structure 7. On each pair of troso 5 Two clamps 8 are placed, the free movement of which along the cables 5 and contact with them is ensured by rings 9 hinged on clamps 8. The installation during the lifting period and after the lifting of the mounted 7 at the given space coordinates is provided using braces 10 made of cables of specified lengths for each belt, fixed at one end to latch 8, and at the other end to the corresponding base of frame 1 or 2. Stands 11 provide adjustment for Hur during the docking of the belt construction applications subsequent to the previous 7 is assembled.
Фиксатор 8 выполнен в виде П-образ- ных элементов, соединенных между собой шарниром 12. Каждый фиксатор 8 оснащен зажимом 13.The latch 8 is made in the form of U-shaped elements interconnected by a hinge 12. Each latch 8 is equipped with a clip 13.
Устройство работает следующим образом.The device works as follows.
На размотанные с барабанов 4 рабочих рам 2 тросы 5, которые в этот период просто лежат на основании 3, устанавливают верхний по с сооружени 7, он, как правило, состоит из одной секции, изготовленной в виде крышки, затем с четырех сторон по тросам 5 подвод т фиксаторы 8 к крышке сооружени 7 и закрепл ют ее в этих фиксаторах 8 при помощи зажимов 13, которые обеспечивают надежную фиксацию крышки сооружени 7. Одновременным включением приводов и вращением барабанов 4 соответствующих рабочих рам 2 обеспечиваетс нат жение тросов 5 между рамами 1 и 2, что приводит к подъему крышки сооружени 7 на высоту, обусловленную габаритными размерами последующего собираемого по са сооружени 7 по высоте , при этом фиксаторы 8 самоустанавливаютс относительно вертикальной оси сооружени 7 при помощи соответствующих дл данного по са сооружени 7 расчалок 10, контактиру с тросами 5 рам 1 и 2 своими кольцами 9, шарнирное соединение которых обеспечивает свободную ориентацию плоскости кольца относительно движени троса 5 при различных сложившихс обсто тельствах подъема крышки сооружени 7.On the unrolled from the drums 4 working frames 2 cables 5, which during this period simply lie on the base 3, the upper part of the structure 7 is installed, it, as a rule, consists of one section, made in the form of a cover, then from four sides along the cables 5 clamps 8 are brought to the lid of the structure 7 and secured in these clamps 8 by means of clamps 13, which ensure reliable fixation of the lid of the structure 7. Simultaneously switching on the drives and rotating the drums 4 of the respective working frames 2, the cables 5 are tensioned between frames 1 and 2 h This leads to raising the cover of the structure 7 to a height due to the overall dimensions of the subsequent assembly 7 of the structure 7 in height, while the clips 8 self-aligning with the vertical axis of the construction 7 using the braces 10 that are suitable for this construction 7, contacting the cables 5 of the frames 1 and 2 with its rings 9, the hinged connection of which provides for the free orientation of the ring plane relative to the movement of the cable 5 in the various circumstances of lifting the cover of the structure 7.
После подъема верхнего по са (крышки) сооружени 7 в проектное положение на освободившемс месте под ним производ т сборку последующего по са сооружени 7, причем дл безопасного проведени работ под подн тый по с сооружени 7 подвод т сперва и устанавливают симметрично четыре секции последующего по са сооружени 7 и после их надежного закреплени с верхним по сом производ т сборку остальных панелей данного собираемого по са . При этом панели устанавливают на подставки 11, расставленные на основании 3 по периметру нижней части собираемого по са сооружени . По мере подхода сборочных работ к местам закреплени фиксаторов 8 с верхним по сом сооружени , они раскрепл ютс и разматыванием с барабанов 4 тросов 5 опускаютс на основание 3. Это позвол ет произвести окончательную сборку данного по са сооружени и требуемые технологические операции. Затем под собранную конструкцию части сооружени , состо щую из верхнего и последующего по сов, подвод т фиксаторы 8, фиксируют их и циклы подъема и производства работ повтор ютс , при этом из-за разных геометрических размеров по сов расчалки 10 мен ютс . Длина расчалок 10 рассчитана как длина гипотенузы треугольника, образованного высотой подъема соответствующего по са сооружени и рассто нием от соответствующей рамы 1 или 2 до места проекции на основании закреплени фиксатора 8 с по сом сооружени 7.After raising the upper body (lid) of the building 7 to the design position, the subsequent building 7 is assembled at the vacant place under it, and for safe work, raised up from building 7, the first four sections are installed symmetrically structures 7 and after they are securely fastened with the upper sam, the remaining panels of this assembled vehicle are assembled. At the same time, the panels are mounted on stands 11 placed on the base 3 along the perimeter of the lower part of the structure assembled by the sa. As assembly work approaches to the fixing points of the fixtures 8 with the top som, they are fastened and unwinding from the reels 4 cables 5 are lowered onto the base 3. This allows the final assembly of the plant and the required technological operations. Then, under the assembled structure of the part of the structure, consisting of the upper and the subsequent, the fixers 8 are brought in, fix them and the lifting and production cycles are repeated, and due to the different geometrical dimensions, the braces 10 change. The length of the braces 10 is calculated as the length of the hypotenuse of the triangle formed by the height of the rise of the corresponding structure and distance from the corresponding frame 1 or 2 to the projection site based on the fixation of the fixture 8 s on the structure 7.
Предлагаемым устройством возможно проводить работы по монтажу разнообразных в плане и по высоте крупногабаритных сооружений, собираемых из горизонтальных по сов методом набора готовых панелей, изготовленных в заводских услови х и доставленных к месту сборки сооружени .The proposed device makes it possible to carry out work on the installation of large-sized structures of various sizes and height, assembled from horizontal boards by a set of prefabricated panels, manufactured in factory conditions and delivered to the place of assembly of the structure.
Такое выполнение устройства обеспечивает безопасное проведение работ, проведение работ одновременно с двух сторонThis embodiment of the device ensures safe work, work simultaneously on both sides
сооружени (с наружной и внутренней), сам же процесс сборки сооружени при этом происходит на относительно незначительных высотах (как правило, панели по габаритам размером не превышают более трех метров), что обусловлено оснасткой (печами ) дл их изготовлени .structures (with external and internal), the process of building the structure itself takes place at relatively small heights (as a rule, panels are not larger than three meters in size), which is due to equipment (furnaces) for their manufacture.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874193127A SU1474242A1 (en) | 1987-02-11 | 1987-02-11 | Arrangement for assembling dome-like structures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU874193127A SU1474242A1 (en) | 1987-02-11 | 1987-02-11 | Arrangement for assembling dome-like structures |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1474242A1 true SU1474242A1 (en) | 1989-04-23 |
Family
ID=21285017
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU874193127A SU1474242A1 (en) | 1987-02-11 | 1987-02-11 | Arrangement for assembling dome-like structures |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1474242A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109822528A (en) * | 2018-12-21 | 2019-05-31 | 台州建筑安装工程公司 | A kind of construction fixed device of reinforcing bar storage |
-
1987
- 1987-02-11 SU SU874193127A patent/SU1474242A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 850854, кл. Е 04 G 21/26, 1979. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109822528A (en) * | 2018-12-21 | 2019-05-31 | 台州建筑安装工程公司 | A kind of construction fixed device of reinforcing bar storage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1474242A1 (en) | Arrangement for assembling dome-like structures | |
KR102112354B1 (en) | Photoviltaic modoule apparatus and photovoltaic power generation facility having the same | |
KR101616718B1 (en) | A tracking type solar power generation apparatus | |
DE3162505D1 (en) | Base support for a tripod tower | |
SU690157A1 (en) | Method of erecting water tower-type structures | |
SU1047829A1 (en) | Arrangement for mounting vertical structure on foundation | |
SU1399247A1 (en) | Crosspiece | |
RU1811554C (en) | Safeguard of constructed building | |
SU1721003A1 (en) | Method for erection of structure | |
SU1521705A1 (en) | Device for securing ballast on portal with inclined pillars | |
JP3128178B2 (en) | How to build a tent frame | |
JP2023156201A (en) | Solar panel installation device and solar panel installation method | |
SU937684A1 (en) | Method and apparatus for erecting a mast | |
SU1027353A1 (en) | Collapsible struct | |
SU1678752A1 (en) | Load-crane | |
SU1539456A1 (en) | Method of mounting boiler-modules | |
RU1782453C (en) | Hothouse | |
SU1291541A1 (en) | Method of erecting supports of power transmission line | |
SU1312070A1 (en) | Arrangement for hoisting long structure | |
JPH09268757A (en) | Scaffolding device | |
SU1709060A1 (en) | Drilling structure | |
SU1625819A1 (en) | Jib swing crane | |
SU1254249A1 (en) | Method of assembling boiler unit | |
SU1735522A1 (en) | Method for erection of pendant covering | |
SU471286A1 (en) | Device for mounting a tower crane |