SU1467168A2 - Support for permanent mine workings - Google Patents

Support for permanent mine workings Download PDF

Info

Publication number
SU1467168A2
SU1467168A2 SU874248632A SU4248632A SU1467168A2 SU 1467168 A2 SU1467168 A2 SU 1467168A2 SU 874248632 A SU874248632 A SU 874248632A SU 4248632 A SU4248632 A SU 4248632A SU 1467168 A2 SU1467168 A2 SU 1467168A2
Authority
SU
USSR - Soviet Union
Prior art keywords
flanges
grooves
special profile
mine workings
support
Prior art date
Application number
SU874248632A
Other languages
Russian (ru)
Inventor
Анатолий Михайлович Симанович
Сергей Владимирович Зиньковский
Геннадий Анатольевич Симанович
Original Assignee
Днепропетровский Государственный Проектный Институт "Днепрогипрошахт"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Днепропетровский Государственный Проектный Институт "Днепрогипрошахт" filed Critical Днепропетровский Государственный Проектный Институт "Днепрогипрошахт"
Priority to SU874248632A priority Critical patent/SU1467168A2/en
Application granted granted Critical
Publication of SU1467168A2 publication Critical patent/SU1467168A2/en

Links

Landscapes

  • Combined Means For Separation Of Solids (AREA)

Abstract

Изобретение относитс  к горному делу и м.б. использовано дл  креплени  горизонтальных горных выработок. Цель - упрощение конструкции путем использовани  отходов спецпрофил . Крепь включает верхн к I и 2, соединенные шарнирно податливыми узлами . Последние выполнены в виде составной из двух отрезков спецпрофил  V-образной обоймы 3 с наклонно расположенными к продольной оси двутавра стенками. На фланцах 4 обоймы 3 дйа- , гонально расположены пазы дл  уста- йовки торцов соедин емых элементов. На скосах торцов полок двутавра вы- полнены пазы противоположно пазам фланцев 4.- При вертикальном смещений пород д;вутавра верхн ка 1 передают нагрузки на наклонньге стенки (QThe invention relates to mining and m. used to mount horizontal mine workings. The goal is to simplify the design by using special profile waste. The support includes upper to I and 2, connected by hinge-compliant nodes. The latter are made in the form of a special profile of a V-shaped holder 3 with two segments with walls inclined to the longitudinal axis of the I-beam. On the flanges 4 of the holder 3 are dy- nally, grooves are located for fitting the ends of the elements to be connected. On the bevels of the flanks of the I-beam, grooves are made opposite to the grooves of the flanges 4.- With vertical displacements of rocks e; the upper one transfers the loads to the inclined walls (Q

Description

; . . г; . . g

; Изобретение относитс  к горному делу, может быть использовано дл  креплени  горизонтальных горных выра- боток и  вл етс  усовершенствованием 1известной крепи по авт,св.№ 1214934. Целью изобретени   вл етс  упро- щение конструкции путем использовани  отходов спецпрофил .; The invention relates to mining, can be used for securing horizontal mining, and is an improvement of the well-known lining according to the model number 1214934. The purpose of the invention is to simplify the design by using special profile waste.

jl На фиг. I изображена крепь в по- перечном сечении горной выработки; на фиг.2 - разрез А-А на фигЛ; на I фиг.3 - вид Б на фиг.1, до осадки крепи; на фиг. 4 - то же, после осад- ;:ки крепи; на фиг, 5 - узел I на фиг.1; на фиг. 6 - часть обоймы из отрезка спецпрофил ; на фиг. 7 - узел I на фиг,1, аксонометри ; на фиг. 8 - соедин емые концы сегментов металлической рамы; на фиг. 9 - видВ ; на фиг.8.jl FIG. I shows the support in cross section of the mine workings; figure 2 - section aa on figl; in I figure 3 - view B in figure 1, to precipitate lining; in fig. 4 - the same, after the siege;; ki lining; in FIG. 5, node I in FIG. in fig. 6 - part of the clip from the special section; in fig. 7 - node I in FIG. 1, axonometrics; in fig. 8 - connectable ends of metal frame segments; in fig. 9 - viewV; on Fig.

П Крепь капитальных горных вырабо- iJTOK состоит из верхн ка 1, стоек 2, I соединенных, шарнирно податливыми уз- Iламй, выполненными в виде составной из двух отрезков спецпрофил  У-образ ной обоймы 3 с наклонно расположенньг ми к продольной оси -двутавра стенками . Фланцы 4 обоймы 3, выполненной из отрезков спецпрофил , имеют диа- тонально расположенные пазы 5 дл  установки торцов соедин емых элементов , Межцу обойками 3 и стенкой двутавра устанавливают податливые прокладки 6, Днища обойм 3 и концы сое- дин емых верхн ка 1 и стойки 2 снабже- . ны отверсти ми 7 под болты В с гайками .The support of capital mining units consists of a top 1, a rack 2, I connected, with hingedly flexible knots made in the form of a special profile made of two pieces of a special yoke 3 with inclined walls to the longitudinal axis. The flanges 4 of the clip 3, made of special profile segments, have diatonally positioned grooves 5 for mounting the ends of the elements to be joined. supply- 7 holes for bolts B with nuts.

Крепь содержит также межрамный бетонный по с 9 с продольными пере- городками 10, выполненными из легко деформируемого материала. Между рамами установлены распорки 11 с зат жка ми. Стойки 2 рамы установлены на опорные плиты 12. Торцы соедин емых элементов рамы выполнены со скосами 13 к содержат диагонально располоThe support also contains interframe concrete with 9 with longitudinal partitions 10 made of easily deformable material. Between the frames there are spacers 11 with fasteners. Racks 2 frames mounted on the support plates 12. The ends of the joining frame elements are made with bevels 13 K contain diagonally

женные пазы 14, которые устроены противоположно установочным пазам 5 на фланцах 4 V-образной обоймы.grooves 14, which are arranged oppositely to the installation grooves 5 on the flanges 4 of the V-ring.

Крепь возвод т следующим образом.The support was erected as follows.

Стойки 2 устанавливают на опорные плиты 12, уложенные в лунки, выполненные в почве выработки, и соедин ют их со стойками ранее установленной рамы посредстовм жестких распорок П. Затем собранный на заводе у шарнирно-податливый узел устанавлива- йт на стойке 2 и после размещени  прокладок 6 между нижними фланцами 4 обоймы 3 и выступающей частью стенки стойки 2 ст гивают обойму 3 посредством болтов 8. При этом между торцами верхних фланцев спецпрофил  обоймы 3 образуетс  увеличенный по отношению к толщине стенки стойки 2 (вьшолненной из двутавра ) зазор, в , который ввод т стенку верхн ка 1 и обкладьгоают ее податливыми прокладками 6. После чего обе обоймы 3 ст гивают болтами 8 с гайками. Между рамами устанавливают зат жки по кон- -туру рамы. Затем заполн ют межрамное и закрепное пространство - твердеющим составом; сначала возвод т из бетона стенки до уровн  шарнирно- податливого узла рамы, а затем возвод т , например из карбамидного пенопласта, продольные перегородки 10, после чего из бетонной смеси возвод т верхнюю (ароч ную7 часть межрамного бетонного по са.Racks 2 are mounted on base plates 12, laid in holes made in the soil of the mine, and connected to racks of a previously installed frame by means of rigid struts P. Then assembled at the plant at the hinge-flexible installation site on the rack 2 and after laying the gaskets 6 between the lower flanges 4 of the yoke 3 and the protruding part of the wall of the stand 2, they tighten the yoke 3 by means of bolts 8. In this case, between the ends of the upper flanges of the special profile of the yoke 3, the stand 2 is increased with respect to the wall thickness a) a gap into which the wall of the top 1 is inserted and wrapped around it with compliant gaskets 6. After which both clips 3 are bolted 8 with nuts. Between the frames, set the fasteners on the frame frame. Then the interframe and anchor space is filled with a hardening compound; First, walls are erected from concrete to the level of a hinge-compliant frame assembly, and then, for example, from urea foam, longitudinal partitions 10 are erected, after which the top (arched 7 part of interframe concrete) is erected from the concrete mix.

Крепь работает следующим образом .The support works as follows.

При вертикальном смещении пород полки двутавра верхн ка 1 передают . нагрузки на наклонные стенки обой- мы 3, под действием которых последние смыкаютс , обеспечива  таким образом вертикальную податливость крепи . При этом по мере уменьшени  угла наклона стенок обоймы 3 под действием смещающегос  верхн ка I нарастает сопротивление этим смещени м шарнир- но-податливого узла за счет увеличени  распора, создаваемого наклонными стенками обоймы 3. Величину распо ра регулируют деформируемостью подат ливых прокладок 6. При полном исчерпании вертикальной податливости верхн к 1 и стойки 2 опираютс  скоса ми 13 на поверхность обоймы 3. При боковом смещении пород стойки 2 раны вместе с нижней частью бетонного по са поворачиваютс  вовнутрь выработки с помощью установочных пазов 5 и 14, обеспечива  боковую податливость . После этого металлобетонна  крепь работает в более благопри тномWith a vertical displacement of rocks, the flanges of the I-beam top 1 are transmitted. loads on the inclined walls of the collar 3, under the action of which the latter are closed, thus providing a vertical compliance of the lining. At the same time, as the angle of inclination of the casing walls 3 decreases, under the action of the biasable top I, the resistance of these displacements of the hinge-flexible node increases, due to an increase in the thrust created by the inclined walls of the casing 3. when the vertical compliance is exhausted, top to 1 and the pillars 2 are supported by bevels 13 on the surface of the casing 3. When the lateral displacement of the pillars of the rack 2, the wounds, along with the lower part of the concrete, are turned inside the mine work installation slots 5 and 14, providing lateral compliance. After that metal lining works in a more favorable manner.

ff fff frff fffiT ffff ххуу . fff ff Л УУ уУ/Ь /vyy улуff fff frff fffiT ffff hhuu. fff ff l yu yu / b / vyy ulu

жесткой режиме вследствие уменьшени  вертикадьнь1Х и боковых нагрузок.hard mode due to a decrease in vertical and lateral loads.

Claims (1)

Формула изобре-тени Formula of the invented shadow Крепь капитальных горных выработок по авт. св. № 1214,934, отличающа с  тем, что, с цельюStrengthen capital mine workings auth. St. No. 1214,934, characterized in that, with the aim упрощени  конструкции путем исполь- зовани  отходов спецпрофил , V-об- разна  обойма выполнена из отрезков спецпрофил  с диагонально расположенными на фланцах пазами дл  ус та-г to simplify the design by using a special profile waste; the V-shaped clip is made of special profile segments with diagonally disposed flanges on the flanges новки торцов соедин емых элементов, а на скосах торцов полок двутавра вьтолнены пазы противоположно пазам на фланцах У -образной обоймы.The nozzles of the ends of the elements to be joined, and on the bevels of the ends of the flanges of the I-beams, the grooves are opposite to the grooves on the flanges of the U-shaped yoke. Вид бView b В ид 5In id 5 (ри.З(R.W. фиг. FIG. 5 .five . qjut.Sqjut.S Составитель Л, Чистова Редактор А. Шандор ТехредЛ.Олийньш:: Корректор С.ЧерниCompiled by L, Chistova Editor A. Shandor TehredL.Olijins :: Proofreader S.Cherni Заказ 1122/26 Тираж 4А9ПодписноеOrder 1122/26 Circulation 4A9Subscription ВНИИ1Ш Государственного комитета по изобретени м и открыти м при ГКНТ СССР 113035, Москва, Ж-35, Раушска  наб., д. 4/5VNII1SH of the State Committee for Inventions and Discoveries at the State Committee on Science and Technology of the USSR 4/5, Moscow, Zh-35, Raushsk nab. 113035 фуг. 5fug. five ./%и./%and тt 1414 Щ Фие.9U Fi.9
SU874248632A 1987-05-20 1987-05-20 Support for permanent mine workings SU1467168A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU874248632A SU1467168A2 (en) 1987-05-20 1987-05-20 Support for permanent mine workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU874248632A SU1467168A2 (en) 1987-05-20 1987-05-20 Support for permanent mine workings

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
SU1214934 Addition

Publications (1)

Publication Number Publication Date
SU1467168A2 true SU1467168A2 (en) 1989-03-23

Family

ID=21305682

Family Applications (1)

Application Number Title Priority Date Filing Date
SU874248632A SU1467168A2 (en) 1987-05-20 1987-05-20 Support for permanent mine workings

Country Status (1)

Country Link
SU (1) SU1467168A2 (en)

Similar Documents

Publication Publication Date Title
SU1467168A2 (en) Support for permanent mine workings
JPH1144188A (en) Constructing method for bulkhead inside shielded tunnel
SU1296724A1 (en) Roof-bolt metal arch support
SU1216355A1 (en) Method of constructing tunnel lining
SU1084448A1 (en) Mine working support
SU1427074A1 (en) Method of supporting mine workings
SU1555501A1 (en) Method of erecting a permanent mine support
SU1263871A1 (en) Roof support for mine roadways
SU1350299A1 (en) Forms for erecting walls
SU1318690A2 (en) Frame support of special rolled shape
SU1714143A1 (en) Ferroconcrete support tubing
SU1112126A1 (en) Multiple roof bolting
GB560006A (en) Improvements in and relating to pre-fabricated structural elements and to buildings made therefrom
SU1460349A1 (en) Filling dam
SU1096361A1 (en) Reinforcement/forms block
SU732536A1 (en) Steel and concrete mining roof support
SU1350228A1 (en) Prefabricated knock-down ferroconcrete overpass for makeshift roads in open mines
SU1252498A1 (en) Method of constructing tunnels of large section
RU2018680C1 (en) Prefabricated reinforced concrete support
SU737574A1 (en) Retaining wall
SU1411379A1 (en) Arrangement for securing trenches
SU1337523A2 (en) Support for inventory mine workings
SU1033781A1 (en) Filling bridge
SU926307A1 (en) Method for supporting extraction working with pillarless process of working adjacent recoverable pillars
SU1610030A1 (en) Yielding metal-concrete support and method of erecting same