SU1428779A1 - Method of construction of water duct under road embankment on weak foundation - Google Patents
Method of construction of water duct under road embankment on weak foundation Download PDFInfo
- Publication number
- SU1428779A1 SU1428779A1 SU853914248A SU3914248A SU1428779A1 SU 1428779 A1 SU1428779 A1 SU 1428779A1 SU 853914248 A SU853914248 A SU 853914248A SU 3914248 A SU3914248 A SU 3914248A SU 1428779 A1 SU1428779 A1 SU 1428779A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- pipe
- precipitation
- tray
- expected
- slope
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F5/00—Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Изобретение относитс к строительству водопропускных сооружений, в частности водопропускных труб под насьт ми железных и автомобильных дорог.,Цель изобретени - уменьшение трудоемкости возведени трубы и повышение надежности ее работы. В низовой части насыпи I производ т выемку слабого грунта от нижней точки 5 ожидаемой осадки на глубину от поверхности основани 2, определ емую из выражени hi -макс - S, - (i рассто ние горизонтали от наиболее низкой точки кривой ожидаемой осадки лотка трубы в сторо ну низового откоса насьпи; - величина осадки лотка трубы в наиболее низкой точке кривой ожвдаемой осадки без выемки слабого грунта; S;, - величина осадки лотка трубы без выемки слабого грунта в точке с абсциссой х; i - поперечный уклон поверхности основани ; IHUH заданный уклон лотка трубы после стабилизации осадки. После выемки.слабого грунта осуществл ют укладку трубы 3 и отсып , ку насьти. После осадки трубы лоток 9 получает пр молинейное очертание с заданным уклоном IMMH 2 ил. € (ЛThe invention relates to the construction of culverts, in particular culverts under the railways and highways. The purpose of the invention is to reduce the laboriousness of erecting the pipe and increase the reliability of its operation. In the lower part of the embankment I, excavation of the weak ground from the low point 5 of the expected precipitation to the depth from the surface of the base 2 was made, determined from the expression hi-max - S, (i horizontal distance from the lowest point of the expected pipe-pipe precipitation curve from the bottom of the slope; - the amount of precipitation of the pipe tray at the lowest point of the expected precipitation curve without excavating weak soil; S ;, - the precipitation of the pipe tray without excavating weak soil at the point with abscissa x; i - transverse slope of the base surface; IHUH on the pipe tray after the sedimentation has stabilized. After removing the weak soil, pipe 3 is laid and dumped out. After pipe draft, tray 9 receives a straight line with a given IMMH slope 2 or €. (L
Description
4four
ISDISD
оо -vi oo -vi
соwith
Изобретение относитс к строительству водопропускных сооружений, в частности водопропускных труб под на- сьт ми железных и автомобильных до- рог.The invention relates to the construction of culverts, in particular culverts under the iron and highways.
Цель иэобре-тени - уменьшение трудоемкости возведени трубы и повышение надежности ее работы.The aim of the iobre shadow is to reduce the laboriousness of erecting a pipe and increase the reliability of its operation.
На фиг. 1 изображена водопропуск- на труба под насыпью, продольньй разрез, до отсыпки насьпти; на фиг. 2- то же, после отсыпки насыпи и стабилизации осадки.FIG. 1 shows the flow pipe to the pipe under the embankment, a longitudinal section, to the dumping; in fig. 2 - the same, after dumping the embankment and stabilization of precipitation.
V Способ осуществл ют следующим об- разом.V The method is carried out as follows.
Под верховой частью насыпи 1 на участке основани 2 между входным концом трубы 3 и вертикальной пр мой 4, проход щей через нижнюю точку 5 кривой 6 ожидаемой осадки, производ т выемку грунта основани 2 под фундаментную подушку 7 на глубину, равную толщине hf.n. Фундаментной подушки 7. Под низовой частью насьти 1 на участ- ке основани 2 между вертикальной пр мой А и выходнмм концом трубы 3 производ т выемку грунта основани 2 под фундаментную подушку 7 и выемку слабого грунта основани 2 под трубой 3 на глубину h, определ емую из математического выражени Under the upper part of embankment 1, at the base 2 section between the inlet end of pipe 3 and vertical straight 4 passing through the lower point 5 of curve 6 of the expected precipitation, the base 2 is excavated under foundation cushion 7 to a depth equal to the thickness hf.n. Foundation bed 7. Under the lower part of the base 1 at the base 2 between the vertical straight A and the outlet end of the pipe 3, the base 2 is excavated under the foundation 7 and the base 2 under the pipe 3 is dredged to a depth h, from mathematical expression
hx Shx s
млксmlks
S - (i АМИИ ) S - (i AMII)
де Xde x
- рассто ние по горизонтали от вертикальной пр мой, проход щей через наиболее низкую точку кривой ожидаемой осадки лотка тру- 40 бы, в сторону низового откоса насыпи;- horizontal distance from the vertical straight line, passing through the lowest point of the curve of the expected draft of the pipe tray, towards the lower slope of the embankment;
SMQKC величина осадки лоткаSMQKC tray draft
трубы в наиболее низкой точке кривой ожидаемой j осадки без выемки слабого грунта;pipes at the lowest point of the expected precipitation j curve without excavating weak soil;
БХ - величина осадки лоткаBH - the amount of precipitation tray
трубы без выемки слабого грунта в точке с .абсцис- CQ сой х;pipes without excavation of weak soil at point c. abscis-CQ soy x;
i - поперечный уклон поверхности основани ;i is the transverse slope of the base surface;
мвн заданный уклон лотка трубы после стабилизации осадки.mvn set the slope of the pipe tray after stabilization of precipitation.
дновременно до или после выемки слаого грунта основани 2 устраивают заданным уклоном отвод щее русло 8At the same time, before or after the excavation of the loose soil, the base 2 arranges a diversion channel 8
5555
путем заглублени его в основание 2 с с отметкой около трубы 3, равной отметке лотка 9 у выходного конца трубы 3. by digging it into the base 2 with a mark near the pipe 3, equal to the mark of the tray 9 at the output end of the pipe 3.
На грунте основани 2 по. дну выемки грунта под трубой 3 устраивают фундаментную подушку 7. На фундамент- ную подущку 7 укладьгоают трубу 3, например металлическую гофрированную, и производ т засыпку трубы 3 грунтом и отсыпку насыпи 1 над ней.On subgrade bottom 2 through. The bottom of the excavation under the pipe 3 arranges a foundation cushion 7. A pipe 3, such as a metal corrugated one, is placed on the foundation underlayer 7, and the pipe 3 is filled with soil and the embankment 1 is filled.
После отсыпки насыпи 1 под воздействием ее веса происходит осадка трубы 3 на ожидаемые (расчетные) величины . При этом под верховой частью насыпи 1 лоток 9 трубы 3 занимает положение по кривой 6 осадки с наименьшей отметкой в месте наиболее низкой точки 5 кривой 6 осадки. При устройстве фундаментной подушки 7 со строительным подъемом, равным стреле прогиба кривой 6 осадки на этом участке, продольный профиль лотка 9 трубы 3 имеет пр молинейное очертание с наименьшей отметкой в той же точке 5 и с наибольшей у входного конца трубы 3. Под низовой частью насьти 1 на участке между вертикальной пр мой 4, проход щей через наиболее низкую точку 5 кривой 6 осадки, лоток 9 благодар его первоначальному расположению на глубине hy получает пр молинейное очертание с заданным уклоном IMMH и с наибольшей отметкой в наиболее низкой точке 5 кривой 6 осадки. При этом по-прежнему кажда точка в лотке 9 трубы 3 и в отвод щем русле 8 располагаетс ниже предьщущей, чем обеспечиваетс беспреп тственньй пропуск воды по трубе 3 и после ее осадки.After filling the embankment 1 under the influence of its weight, the sediment of the pipe 3 occurs on the expected (calculated) values. At the same time, under the upper part of the embankment 1, the tray 9 of the pipe 3 takes a position along curve 6 of the draft with the smallest mark in place of the lowest point 5 of curve 6 of the draft. When constructing a foundation cushion 7 with a building height equal to the deflection arrow of curve 6 of the precipitation in this area, the longitudinal profile of tray 9 of pipe 3 has a straight line with the smallest mark at the same point 5 and with the largest at the inlet end of pipe 3. Under the lower part 1, between the vertical straight 4 passing through the lowest point 5 of the curve 6 of the draft, tray 9, due to its initial position at a depth of hy, gets a straight line with a given IMMH slope and with the greatest mark to the lowest Coy point 5 curve 6 precipitation. However, as before, each point in the tray 9 of the pipe 3 and in the discharge channel 8 is located lower than the previous one, which ensures uninterrupted passage of water through the pipe 3 and after its settlement.
Таким образом, способ строительства водопропускного сооружени обеспечивает уменьшение трудоемкости его возведени за счет уменьшени объема выемки слабого грунта основани и исключени укладки взамен его малосжимаемого дренирующего, грунта и одновременное повышение надежности его работы во врем строительства и эксплуатации сооружени за счет обеспечени беспреп тственного пропуска воды, исключени обводнени основани ,Thus, the method of construction of the culvert construction reduces the laboriousness of its construction by reducing the amount of excavation of the weak ground of the base and eliminating laying instead of its slightly compressible draining soil and simultaneously increasing the reliability of its work during the construction and operation of the structure by ensuring unhindered water passage, eliminating watering base
Ф, ормула изобретени F, formula of invention
Способ строительства водопропускного сооружени под дорожной насыпью на слабом основании, заключающийс вThe method of construction of the culvert under the road embankment on a weak foundation, consisting in
3142877931428779
подготовке основани дл трубы путем выемки слабого грунта в низовой части насыпи, укладке трубы и отсыпке насыпи, отличающийс тем, что, с целью уменьшени трудоемкости и повьшени надежности работы, выемку слабого грунта производ т от нижней точки ожидаемой осадки на глубину от поверхности основани , опре- Q дел емую из выражени preparing the base for the pipe by excavating weak soil in the lower part of the embankment, laying the pipe and filling the embankment, characterized in that, in order to reduce the labor intensity and increase the reliability of operation, the excavation of the weak soil takes place from the lowest point of the expected precipitation to a depth from the base surface, - Q made from the expression
h;( SMOKC - SK - (i - i-Httn )h; (SMOKC - SK - (i - i-Httn)
где X - рассто ние по горизонтали от наиболее низкой точки кривой ожидаемойwhere X is the horizontal distance from the lowest point of the expected curve
Q Q
5five
осадки лотка трубы в сторону низового откоса насыпи;precipitation of the pipe tray in the direction of the lower slope of the embankment;
маис величина осадки лоткаmaize trays precipitation
трубы в наиболее низкой точке кривой ожидаемой осадки без выемки слабого грунта;pipes at the lowest point of the expected precipitation curve without excavating weak soil;
S - величина осадки лоткаS - the amount of precipitation tray
трубы без выемки слабого грунта в точке с абсциссой х;pipes without excavation of weak ground at the point with abscissa x;
i - поперечный уклон поверхности основани ;i is the transverse slope of the base surface;
ifiiw - заданный уклон лотка трубы после стабилизации осадки.ifiiw is the specified slope of the pipe tray after sediment stabilization.
53 Птггггттг53 Ptggggtg
SS
Ц)иг.1C) ig.1
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU853914248A SU1428779A1 (en) | 1985-04-04 | 1985-04-04 | Method of construction of water duct under road embankment on weak foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU853914248A SU1428779A1 (en) | 1985-04-04 | 1985-04-04 | Method of construction of water duct under road embankment on weak foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1428779A1 true SU1428779A1 (en) | 1988-10-07 |
Family
ID=21183923
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU853914248A SU1428779A1 (en) | 1985-04-04 | 1985-04-04 | Method of construction of water duct under road embankment on weak foundation |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1428779A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103290788B (en) * | 2012-03-03 | 2017-05-24 | 四川华西绿舍预制构件有限公司 | Prefabricated corner box culvert, and manufacturing method and manufacturing mold of prefabricated corner box culvert |
-
1985
- 1985-04-04 SU SU853914248A patent/SU1428779A1/en active
Non-Patent Citations (1)
Title |
---|
Транспортное строительство, 1973, № 5, с. 9. * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103290788B (en) * | 2012-03-03 | 2017-05-24 | 四川华西绿舍预制构件有限公司 | Prefabricated corner box culvert, and manufacturing method and manufacturing mold of prefabricated corner box culvert |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4666334A (en) | Erosion control system for bluffs located adjacent a body of water | |
CN210395607U (en) | Side slope buried drainage structure | |
SU1428779A1 (en) | Method of construction of water duct under road embankment on weak foundation | |
CN110172884B (en) | Mountain highway subgrade and construction method | |
CN108316077A (en) | One kind underlies shallow embedding cave dwelling roadbed treatment structures and method | |
Sandeman | THE DERWENT VALLEY WATERWORKS.(INCLUDES PLATES AT BACK OF VOLUME). | |
CN218479134U (en) | High-fill roadbed settlement stable high-bearing earthwork structure | |
CN217078251U (en) | Foundation ditch road bed backfill structure | |
RU2660699C1 (en) | Culvert under the embankment | |
CN210341522U (en) | Highway abrupt slope roadbed in rainy season area | |
SU1375724A1 (en) | Method of producing enclosed horizontal drainage | |
Southgate | I-75 Kenton County Slide | |
SU1654418A1 (en) | Culvert | |
JPH0627402B2 (en) | Revetment retaining wall block with road plate and road widening method using it | |
SU1395737A1 (en) | Protective reinforcement for slopes | |
SU1763545A1 (en) | Method of repairing gulf part of roadbed | |
RU2028534C1 (en) | Method of construction of pipeline in complicated natural conditions | |
TABLE | STAGE 3A | |
SU1273436A1 (en) | Method of constructing dams on weak foundation | |
SU1710747A1 (en) | Method of making artificial water basin on coal-bearing area | |
CN116397475A (en) | In-situ reconstruction and expansion structure of embankment and construction method | |
Civil | BXD_400 Luas Cross City Infrastructure Works | |
SU1463857A1 (en) | Method of constructing trenchless drainage system | |
Hallett | Settling Fills on Muck Lands | |
SU829942A1 (en) | Dam for defining a hydraulically-filled dump |