SU1404662A1 - Steam-turbine plant - Google Patents

Steam-turbine plant Download PDF

Info

Publication number
SU1404662A1
SU1404662A1 SU864051436A SU4051436A SU1404662A1 SU 1404662 A1 SU1404662 A1 SU 1404662A1 SU 864051436 A SU864051436 A SU 864051436A SU 4051436 A SU4051436 A SU 4051436A SU 1404662 A1 SU1404662 A1 SU 1404662A1
Authority
SU
USSR - Soviet Union
Prior art keywords
steam
regenerative
valves
heating
lines
Prior art date
Application number
SU864051436A
Other languages
Russian (ru)
Inventor
Игорь Викторович Шерстобитов
Александр Михайлович Тимошенко
Олег Викторович Чуносов
Original Assignee
Краснодарский политехнический институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Краснодарский политехнический институт filed Critical Краснодарский политехнический институт
Priority to SU864051436A priority Critical patent/SU1404662A1/en
Application granted granted Critical
Publication of SU1404662A1 publication Critical patent/SU1404662A1/en

Links

Landscapes

  • Control Of Turbines (AREA)

Abstract

Изобретение относитс  к теплоэнергетике и позвол ет повысить экономичность установки на частичных нагрузках. Эжекторы 24 и 25 размещены на трубопроводах регенеративного отбора пара 3 и 4 перед ступен ми 20 и 22 нагрева и подключены по эжекти- руемой среде через запорную арматуру 45 и 42 к трубопроводам отбора 4 и 6 более низкого потенциала. Выходы ступеней 20 и 22 по воде подключены пе- ремычками 27 и 28 с запорной арматурой 34 и 37 к входу ступеней 21 и 23 другой линии нагрева. Такое выполнение позвол ет использовать дл  подогрева питательной воды пара более низких параметров в период частичных нагрузок паротурбинной установки. 1 ил.The invention relates to a power system and improves the efficiency of the installation at partial loads. Ejectors 24 and 25 are placed on the regenerative extraction pipelines 3 and 4 in front of the heating stages 20 and 22 and are connected to the extraction lines 4 and 6 of lower potential through the ejected medium through the shut-off valves 45 and 42. The water outlets of steps 20 and 22 are connected by jumpers 27 and 28 with shutoff valves 34 and 37 to the inlet of steps 21 and 23 of another heating line. This embodiment makes it possible to use lower parameters for heating the steam feed water during the period of partial loads of the steam turbine plant. 1 il.

Description

(L

it. - it. -

Од О) 1ч9Od O) 1h9

Изобретение относитс  к теплоэнергетике , в частности к паротурбиннымThis invention relates to a power system, in particular to steam turbines.

10ten

41,42,44 и 45 открыта, а запорна  арматура 32,35,36,39,40 и 43 открыта .41,42,44 and 45 is open, and valves 32,35,36,39,40 and 43 are open.

При увеличении расхода питательной воды до величины, превышающей пропускную способность двухпоточного подогревател  высокого давлени , запорна  арматура 32,35,36,39,40 и 43 открыта, а запорна  арматура 33,34, 37,38,41,42,44 и 45 открыта и паротурбинна  установка работае по известной схеме.With an increase in feedwater flow rate to a value exceeding the throughput capacity of a double-flow high-pressure preheater, the shut-off valves 32,35,36,39,40 and 43 are open, and the shut-off valves 33,34, 37,38,41,42,44 and 45 are open and steam turbine installation work in a known pattern.

установкам с многопоточной системой регенерации.installations with a multithreaded regeneration system.

Целью изобретени   вл етс  повьше- ние экономичности на частичных нагрузках .The aim of the invention is to increase the efficiency with partial loads.

На чертеже изображена паротурбинна  установка, содержаща  парогенератор 1, турбину 2 с регенеративными отборами 3-11 пара, электрогенератор 12, конденсатор 13, конденсатный насос 14, регенеративные подогреватели 15, деаэратор 16, питательный на- J5 сое 17, ступени 18-23 регенеративного двухпоточного подогревател  высокого давлени  в эжекторы 24 и 25. Установка содержит перемычки 26-29,The drawing shows a steam turbine plant comprising a steam generator 1, a turbine 2 with regenerative selections 3–11 steam, an electric generator 12, a condenser 13, a condensate pump 14, regenerative heaters 15, a deaerator 16, a nutrient pump J5 17, steps 18–23 of a regenerative double flow a high pressure preheater to ejectors 24 and 25. The installation contains jumpers 26-29,

трубопроводы 30-31 подвода пара и за-2о °й установки, порную арматуру 32-45,pipelines 30-31 of steam supply and for-2 ° installation, waste valves 32-45,

Установка работает следующим образом .The installation works as follows.

При частичных нагрузках паротурбинной установки основной поток пара 25 турбину с трубопроводами регене- из парогенератора 1 поступает в тур- ративного отбора пара, подключенными бину 2, и расшир  сь в ней, совершает работу и вырабатывает электроэнергию , при этом часть пара основного потока через отборы 3-11 поступает jn на регенеративные подогреватели 15 низкого давлени , деаэратор 16 и сту- пени 18-23 регенеративного двухпоточного подогревател , где конденсиру сь подогревает питательную воду и основной конденсат. При этом ступени 18 и 19 подогревател  отключены по греющему пару от отбора 5 турбины . Питательна  вода после деаэратора 16 и ступеней 18 и 19 подогревател  последовательно проходит через ступени 20-23 по перемычкам 26-29, Часть пара из отборов 3 и 4 непосредственно поступает в ступени по трубопроводам 30 и 31, а друга  его часть д- эжектируемой среде через запорную поступает в эжекторы 24 и 25, где арматуру к трубопроводу отбора болееAt partial loads of a steam-turbine plant, the main steam flow 25 turbine with regene pipelines from the steam generator 1 enters the steam extraction plant connected to bin 2 and expands in it, does work and generates electric power, while part of the main flow steam through selections 3 -11 enters jn to low-pressure regenerative heaters 15, deaerator 16 and stages 18-23 of a regenerative double-flow heater, where condensation heats feed water and main condensate. In this case, stages 18 and 19 of the preheater are disconnected in the heating pair from the selection of 5 turbines. The feed water after deaerator 16 and stages 18 and 19 of the preheater successively passes through stages 20-23 through bridges 26-29. Part of the steam from selections 3 and 4 directly enters the stages through pipelines 30 and 31, and another part of the e-ejected medium through the shut-off valve enters the ejectors 24 and 25, where the armature to the extraction pipeline is more

3535

4040

Изобретение позволит повысить экономичность установки путем исполь зовани  дл  подогрева питательной воды пара более низких параметров в период частичных нагрузок паротурбинThe invention will improve the efficiency of the installation by using lower parameters for heating the feed water during the period of partial loads of steam turbines.

Claims (1)

Формула изобретени  Паротурбинна  установка, содержак подогревател м высокого и низкого давлени , по меньшей мере один из которых вьтолнен многопоточным по воде, по крайней мере с двум  лини ми , кажда  из которых содержит не менее двух последовательных ступеней нагрева, при этом ступени нагрева линий подогревател  подключены параллельно к трубопроводам регенеративного отбора пара соответствующего потенциала, отличающа с  тем, что, с целью повьшени  экономичности на частичньк нагрузках, установка снабжена по меньшей мере одним эжектором, размещенным на трубопроводе регенеративного отбора пара на одну из ступеней нагрева одной из линий подогревател  и подключенным поThe invention includes a steam and turbine unit containing high and low pressure heaters, at least one of which is multi-threaded with water, at least two lines, each of which contains at least two successive heating stages, while the heating stages of the heater lines are connected parallel to the pipelines of the regenerative extraction of steam of the corresponding potential, characterized in that, in order to increase efficiency on partial loads, the installation is equipped with at least one Ktorov placed on one of the steps of heating one of the selection lines regenerative preheater vapor pipe and connected by 41,42,44 и 45 открыта, а запорна  арматура 32,35,36,39,40 и 43 открыта .41,42,44 and 45 is open, and valves 32,35,36,39,40 and 43 are open. При увеличении расхода питательной воды до величины, превышающей пропускную способность двухпоточного подогревател  высокого давлени , запорна  арматура 32,35,36,39,40 и 43 открыта, а запорна  арматура 33,34, 37,38,41,42,44 и 45 открыта и паротурбинна  установка работае по известной схеме.With an increase in feedwater flow rate to a value exceeding the throughput capacity of a double-flow high-pressure preheater, the shut-off valves 32,35,36,39,40 and 43 are open, and the shut-off valves 33,34, 37,38,41,42,44 and 45 are open and steam turbine installation work in a known pattern. °й установки, ° th installation Изобретение позволит повысить экономичность установки путем использовани  дл  подогрева питательной воды пара более низких параметров в период частичных нагрузок паротурбинЩ   турбину с трубопроводами регене- ративного отбора пара, подключенными эжектируемой среде через запорную арматуру к трубопроводу отбора болееThe invention will improve the efficiency of the installation by using lower parameters for heating steam feedwater during partial load steam turbines. A turbine with regenerative steam extraction pipelines connected to the ejection medium through the valves to the extraction pipeline Формула изобретени  Паротурбинна  установка, содержаЩ   турбину с трубопроводами регене- ративного отбора пара, подключенными эжектируемой среде через запорную арматуру к трубопроводу отбора болееClaims of the invention: A steam turbine plant containing a turbine with regenerative steam extraction pipelines connected to the ejection medium through a shut-off valve to the extraction pipeline more к подогревател м высокого и низкого давлени , по меньшей мере один из которых вьтолнен многопоточным по воде, по крайней мере с двум  лини ми , кажда  из которых содержит не менее двух последовательных ступеней нагрева, при этом ступени нагрева линий подогревател  подключены параллельно к трубопроводам регенеративного отбора пара соответствующего потенциала, отличающа с  тем, что, с целью повьшени  экономичности на частичньк нагрузках, установка снабжена по меньшей мере одним эжектором, размещенным на трубопроводе регенеративного отбора пара на одну из ступеней нагрева одной из линий подогревател  и подключенным поhigh and low pressure preheaters, at least one of which is multi-threaded in water, with at least two lines, each of which contains at least two successive heating stages, while the heating stages of the preheater lines are connected in parallel to the regenerative selection pipelines a pair of corresponding potential, which is different in that, in order to increase efficiency on partial loads, the installation is equipped with at least one ejector placed on the regenerative pipeline steam extraction at one of the heating steps of one of the preheater lines and connected via инжектирует пар из отборов 4 и 6 более низких параметров, смешиваетс  с ним, и полученна  смесь подаетс  в секции 20 и 22 подогревател . При этом запорна  арматура 33,34,37,38,injects steam from lower parameters 4 and 6, mixes with it, and the resulting mixture is fed to preheater sections 20 and 22. At the same time, the fittings 33,34,37,38 are shut off, ВНИИПИ Заказ 3070/34VNIIPI Order 3070/34 Произв.-полигр. пр-тие, г. Ужгород, ул. Проектна , АRandom polygons pr-tie, Uzhgorod, st. Design, And низкого потенциала, причем по воде выход этой ступени подключен перемычкой с запорной арматурой к входу ступени нагр.ева этого потенциала другой линии нагрева.low potential, and the water output of this stage is connected by a jumper with valves to the input of the load level of this potential of another heating line. Тираж 492Circulation 492 ПодписноеSubscription
SU864051436A 1986-02-21 1986-02-21 Steam-turbine plant SU1404662A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864051436A SU1404662A1 (en) 1986-02-21 1986-02-21 Steam-turbine plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864051436A SU1404662A1 (en) 1986-02-21 1986-02-21 Steam-turbine plant

Publications (1)

Publication Number Publication Date
SU1404662A1 true SU1404662A1 (en) 1988-06-23

Family

ID=21231794

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864051436A SU1404662A1 (en) 1986-02-21 1986-02-21 Steam-turbine plant

Country Status (1)

Country Link
SU (1) SU1404662A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Рыжкин В.Я. Тепловые электрические станции.-М.: Энерги , 1976, с. 171,рис. 12-1,2. *

Similar Documents

Publication Publication Date Title
RU2152527C1 (en) Method of operation of gas-and-steam turbine plant and plant operating according to this method
CN1325770C (en) Device and method for preheating combustibles in combined gas and turbine installations
RU2000107828A (en) METHOD FOR OPERATING A GAS AND STEAM TURBINE INSTALLATION AND A GAS AND STEAM TURBINE INSTALLATION
UA44929C2 (en) METHOD OF OPERATION OF GAS AND STEAM TURBINE AND GAS AND STEAM TURBINE INSTALLATION FOR IMPLEMENTATION OF THE METHOD
JPH09177508A (en) Exhaust heat recovery type steam generator and method for operating gas turbo system combined with steam consumer
CN112240232A (en) Steam power plant, method for modifying steam power plant, and method for operating steam power plant
RU2070293C1 (en) Method of operation of steam turbine plant and steam turbine plant for realization of this method
US4535593A (en) Method of and apparatus for warming high-pressure feed water heaters for power plants
US5347814A (en) Steam system in a multiple boiler plant
RU96102077A (en) METHOD FOR OPERATING A STEAM TURBINE INSTALLATION AND A STEAM TURBINE INSTALLATION FOR ITS IMPLEMENTATION
RU2195561C2 (en) Gas-and-steam turbine plant and method of cooling gas turbine plant coolant
RU2602649C2 (en) Steam turbine npp
SU1404662A1 (en) Steam-turbine plant
RU2033528C1 (en) Low-pressure regeneration system for power steam turbine
RU2053374C1 (en) Method of preheating of feed water
SU1097812A1 (en) Steam power plant
SU1268752A1 (en) Thermal power plant
RU1815343C (en) Method of generation of additional power at power-and-heat supply plant with network heaters
SU1071035A2 (en) Method of operation of extraction wet steam turbine
RU2078229C1 (en) Steam-and-gas plant
SU1118775A1 (en) Steam power plant
RU2228446C2 (en) Thermal power station
SU1539458A1 (en) Boiler plant
SU1048134A1 (en) Thermal power station
SU1361356A1 (en) Method of attaining peak power