SU1399438A1 - Skeleton of steam pneumatic station and method of constructing same - Google Patents

Skeleton of steam pneumatic station and method of constructing same Download PDF

Info

Publication number
SU1399438A1
SU1399438A1 SU864160915A SU4160915A SU1399438A1 SU 1399438 A1 SU1399438 A1 SU 1399438A1 SU 864160915 A SU864160915 A SU 864160915A SU 4160915 A SU4160915 A SU 4160915A SU 1399438 A1 SU1399438 A1 SU 1399438A1
Authority
SU
USSR - Soviet Union
Prior art keywords
semi
beams
frame
crane
mounting
Prior art date
Application number
SU864160915A
Other languages
Russian (ru)
Inventor
Владимир Иосифович Кулай
Original Assignee
Одесский Филиал Всесоюзного Института По Проектированию Организаций Энергетического Строительства "Оргэнергострой"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Одесский Филиал Всесоюзного Института По Проектированию Организаций Энергетического Строительства "Оргэнергострой" filed Critical Одесский Филиал Всесоюзного Института По Проектированию Организаций Энергетического Строительства "Оргэнергострой"
Priority to SU864160915A priority Critical patent/SU1399438A1/en
Application granted granted Critical
Publication of SU1399438A1 publication Critical patent/SU1399438A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Изобретение относитс  к каркасам зданий тепловых электростанций и способам монтажа каркасов зданий тепловых электростанций. Целью изо5 ретени   вл етс  повьпление жесткости и несущей способности и снижение трудоемкости. Хребтовые балки оперты на консоли полуарок каркаса. Консоли соединены с полуарками посредством вертикальных и Наклонных стержней. Подкрановые балки установлены над хребтоБЫМи балками и прикреплены к вертикальным стержн м. Подъем полуарок производ т поочередно монтажными шеврами и креп т их между собой . посредством монтажных ловителей, а строповку и расстроповку полиспастов монтажных шевров выполн ют самоходным стреловым краном, расположенным внутри каркаса. 2 с.п. ф-лы,4 ил. (Л сThe invention relates to the frameworks of buildings of thermal power plants and methods for mounting the frameworks of buildings of thermal power stations. The goal of reinforcement is to reinforce stiffness and carrying capacity and reduce labor intensity. The spinal beams are supported on the console of the semi-walls of the frame. The consoles are connected to the semi-fins by means of vertical and inclined rods. Crane beams are installed above the ridge beams and are attached to vertical rods. Lifting of semi-armatures is performed alternately with mounting brackets and fasten them together. by means of mounting catchers, and slinging and unraveling the tackle of the assembly chevres is performed by a self-propelled jib crane located inside the frame. 2 sec. f-ly, 4 ill. (L with

Description

Изобретение относитс  к строительству , в частности к строительству главного корпуса тепловой электростанции с подвесными котлоагрегатами энергоблоков большой мощности.The invention relates to the construction, in particular to the construction of the main building of a thermal power plant with suspended boilers of high-capacity power units.

Цель изобретени  - повышение жесткости и несущей способности и снижение трудоемкости.The purpose of the invention is to increase the rigidity and carrying capacity and reduce labor intensity.

На фиг.1 изображен каркас здани  тепловой электростанции с подвесным котлоагр.егатом; на фиг.2-А - последовательность возведени  каркаса здани  тепловой электростанции.Figure 1 shows the frame of a building of a thermal power plant with a suspended boiler; Fig. 2-A shows the sequence of construction of the frame of a building of a thermal power plant.

Каркас здани  тепловой электро--, станции включает несущий однопролет- ный ароч ый каркас, выполненный из полуарок 1, шарнирно установленных на фунда1 ентах 2, хребтовые балки 3 подвесного котла 4 и подкрановые балки 5 мостового крана 6. ГЕолуарки 1 каркаса снабжены с внутренней стороны консол ми 7, соединенными с ними жестко посредством вертикальных 8 и наклонных 9 стержней, расположенных в плоскости полуарок 1. Хребтовые балки 3 соединены с консол ми 7 враспор. Подкрановые балки 5 расположены над хребтовыми балками 3 и прикреплены к вертикальным стержн м В полуарок 1. Между торцами хребтовьп балок 3 и консол ми 7 размещены вкладыши 10, обеспечивающие передачу го- ризонтальньпс распорных нагрузок на хребтовые балки 3 при прогибе полуарок 1 от сосредоточенных нагрузок Котла 4. Полуарки 1 образуют трех- шарнирные арки, но возможны и другие статические системы, например двух- тарпирные.The building's thermal electric frame, the station includes a single-span arched frame, made of semi-joints 1, hingedly mounted on foundations 2, ridge beams 3 of the suspended boiler 4 and crane beams 5 of the bridge crane 6. Geoluxi 1 of the frame are fitted from the inside consoles 7, which are rigidly connected to them by means of vertical 8 and inclined 9 rods located in the plane of the semi-frosts 1. Spinal beams 3 are connected to the consoles 7 of them. Crane beams 5 are located above the spinal beams 3 and attached to vertical rods B of semi-flange 1. Between the ends of the backbone beams 3 and consoles 7 there are spacers 10, which ensure the transfer of horizontal spacing loads to spine beams 3 when deflecting semi-arrays 1 from the concentrated loads of the Boiler 4. Semi-marks 1 form three-hinged arches, but other static systems are possible, for example, two-tarpir ones.

Способ .монтажа каркаса здани  тепловой электростанции включает устройство фундаментов 2, установку полуарок 1 на фундаменты 2 с шарнирным креплением их между собой и расположением полуарок 1 одна над другой, поочередный подъем полуарок 1 с креплением их верхних концов посредством Монтажных ловителей 11, временно закрепленных на верхних концах полуарок 1 и центрирующих соединение полуарок 1 в коньковом узле 12 без участи  монтажников, установку подкрановых балок 5 и мостового крана 6 и монтаж хребтовых балок посредством мостового коана 6.The method of assembling the framework of a building of a thermal power station involves arranging foundations 2, installing semi-rollers 1 on foundations 2 with hinged fastening between them and arranging semi -ars 1 one above the other, alternately lifting semi -ars 1 with fastening their upper ends by means of catchers 11 temporarily attached to the upper the ends of the semi-walls 1 and the centering connection of the semi-walls 1 in the ridge assembly 12 without the fate of installers, the installation of crane girders 5 and the bridge crane 6, and the installation of ridge beams by means of a bridge koan 6.

5five

00

5five

5five

00

5five

00

При этом подъем полуарок 1 выполн ют монтажными гаеврами 13, расположенными с наружной стороны каркаса, а строповку и расстроповку полиспастов 14 монтажных шевров 13 и траверс 15 производ т самоходным стреловым краном 16, расположенным внутри каркаса . До подъема полуарок 1 их закрепл ют друг над другом нахлестом на специальных турникетах 17,In this case, the semi-rollers 1 are raised by mounting gaurers 13 located on the outer side of the frame, and slinging and spreading the polyspasts 14 of the mounting shevra 13 and the traverse 15 are performed by a self-propelled jib crane 16 located inside the frame. Before lifting the semi -ars 1, they are fastened one above the other overlapped on special turnstiles 17,

Claims (2)

1.Каркас здани  тепловой электростанции , включающий несущий одно- пролетньй арочньй каркас, выполненный из полуарок, шарнирно установленных на фундаментах 5хребтовые балки подвесного котла и подкрановые балки мостового крана, о т л и ч а ю- щ и и с  . тем, что, с целью повышени  жесткости и несущей способности и снижени  трудоемкости, полуарки каркаса снабженЕ 1 с внутренней стороны консол ми, соединенными с ними посредством вертикальных и наклонных стержней, расположенных в плоскости полуарок, причем хребтовые балки соединены с консол ми враспор, а подкрановые балки расположены над хребтовыми балками и прикреплены к вертикальным стержн м полуарок.1. Building framework of a thermal power plant, including a single-span aroch frame, made of semi-arches, 5-beam ceiling beams of a suspended boiler installed on the foundations, and crane girders of a bridge crane, s. By the fact that, in order to increase rigidity and carrying capacity and reduce labor intensity, the semi-archs of the frame are equipped with 1 on the inner side with consoles connected to them by vertical and inclined rods located in the plane of the semi-armatures, the ridge beams being connected to the consoles, and crane beams the beams are located above the spinal beams and are attached to the vertical rods and semi-aisles. 2.Способ монтажа каркаса здани  тепловой электростанции, включающий устройство фундаментов, установку полуарок на фундаменты с шарнирным креплением их между собой и расположением полуарок одна над другой, поочередный подъем полуарок с креплением их верхних концов посредством монтажных ловителей, временно закрепленных на последних, установку подкрановых балок и мостового крана и монтаж хребтовых балок посредством мостового крана, отличающий- с   тем, что, с целью повышени  жесткости и несущей способности и снижени  трудоемкости, подъем полуарок выполн ют монтажными шеврами, расположенными с наружной стороны каркаса, а строповку и расстроповку полиспастов монтажных шевров производ т самоходным стреловым краном, расположенным внутри каркаса.2. The method of mounting the frame of a thermal power station, including the installation of foundations, installation of semi-fuels on the foundations with hinged fastening between them and the arrangement of semi-fuzzes one above the other, alternate lifting of semi-semi-fasteners with fastening their upper ends by installing catchers temporarily fixed on the latter, installing crane girders and a bridge crane and installation of spinal beams by means of a bridge crane, characterized in that, in order to increase rigidity and carrying capacity and reduce labor intensity, under The semi-semi-carts are assembled by mounting holes located on the outer side of the frame, and slinging and unraveling the polyspasts of the mounting pieces are made by a self-propelled jib crane located inside the frame. юYu вat fOfO фиг. /FIG. / ЛТLT Фиг, 2FIG 2 (. 3(. 3 IS fIS f /J/ J ВAT Фыг. 4Fyg. four
SU864160915A 1986-12-15 1986-12-15 Skeleton of steam pneumatic station and method of constructing same SU1399438A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864160915A SU1399438A1 (en) 1986-12-15 1986-12-15 Skeleton of steam pneumatic station and method of constructing same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864160915A SU1399438A1 (en) 1986-12-15 1986-12-15 Skeleton of steam pneumatic station and method of constructing same

Publications (1)

Publication Number Publication Date
SU1399438A1 true SU1399438A1 (en) 1988-05-30

Family

ID=21272685

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864160915A SU1399438A1 (en) 1986-12-15 1986-12-15 Skeleton of steam pneumatic station and method of constructing same

Country Status (1)

Country Link
SU (1) SU1399438A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Энергетическое строительство. 1978, № 3, с. 65-67, рис. 2,3. *

Similar Documents

Publication Publication Date Title
US3960242A (en) Orbital service bridge
CN215716012U (en) Flying saucer type steel structure in entrance hall
SU1399438A1 (en) Skeleton of steam pneumatic station and method of constructing same
RU96122528A (en) STEAM BOILER INSTALLATION METHOD
US4717030A (en) Turbine building equipped with overhead traveling cranes
US1885781A (en) Roof support for buildings
AR000964A1 (en) COVERAGE SYSTEM FOR INDUSTRIAL BUILDINGS.
ATE87692T1 (en) CEILING PANEL.
SU1701873A1 (en) Shell frame of cooling tower
US4269442A (en) Roof truss suspension
RU2018597C1 (en) Hangar cover
SU1201465A1 (en) Building for boiler-room inside main structure of steam power plant
SU516625A1 (en) Tower of the added somomontiyushchy crane
SU1596051A1 (en) Connecting unit of vent pipe with supporting construction of industrial buildings
RU2130524C1 (en) Guy suspension bridge and method for its erection
RU2018610C1 (en) Shelter and method for its monitoring
SU903506A1 (en) Industrial building roof
SU838036A1 (en) Shell of roofs of buildings and structures
SU1004589A1 (en) Power transmission line support
SU1366577A1 (en) Ferroconcrete bridge span structure
SU1122794A1 (en) Connection joint of crane-supporting beams with column
SU783451A1 (en) Tower structure and method of erecting same
SU1550056A1 (en) End-face wall of industrial building
RU2081275C1 (en) Gas-turbine building of thermal power plant and method for installing its equipment
SU932104A1 (en) Boiler