SU1395537A1 - Vessel - Google Patents

Vessel Download PDF

Info

Publication number
SU1395537A1
SU1395537A1 SU864075708A SU4075708A SU1395537A1 SU 1395537 A1 SU1395537 A1 SU 1395537A1 SU 864075708 A SU864075708 A SU 864075708A SU 4075708 A SU4075708 A SU 4075708A SU 1395537 A1 SU1395537 A1 SU 1395537A1
Authority
SU
USSR - Soviet Union
Prior art keywords
vessel
sections
bridge
bridges
transshipment
Prior art date
Application number
SU864075708A
Other languages
Russian (ru)
Inventor
Лев Георгиевич Соколов
Александр Вячеславович Луковский
Николай Анатольевич Исаков
Original Assignee
Предприятие П/Я Г-4488
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я Г-4488 filed Critical Предприятие П/Я Г-4488
Priority to SU864075708A priority Critical patent/SU1395537A1/en
Application granted granted Critical
Publication of SU1395537A1 publication Critical patent/SU1395537A1/en

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

Изобретение относитс  к судостроению и водному транспорту, в частности к судам, предназначенным дл  доставки различных штучных и навалочных грузов на необорудованный берег. Целью изобретени   вл етс  повьше- ние надежности, безопасности при S3 ведении грузовых операций, а также сокращение времени проведени  этих операций. Судно содержит два складных перегрузочных моста,выполненных из плавучих секций, кормова  часть судна выполнена тримаранной, перегрузочные мосты размещены в кормовой части судна в пространстве между центральным и боковыми корпусами, оба борта центрального и внутренние борта боковых корпусов содержат направл нлцие дл  перемещени  секций перегрузочных мостов . Направл ющие имеют дугообразную форму, и их количество на каждом борту не превышает половины количества секций каждого перегрузочного моста. Секции перегрузочных мостов имеют боковые отбойные ограждени . 2 з.п. ф-лы, 17 ил. Ct S (Л с 00 QD сл СП СО f tJ9f7The invention relates to shipbuilding and water transport, in particular to vessels intended for the delivery of various piece and bulk cargoes to an unequipped coast. The aim of the invention is to increase the reliability, safety during S3 cargo handling operations, as well as to reduce the time for these operations. The vessel contains two collapsible reloading bridges made of floating sections, the stern of the vessel is made trimaran, reloading bridges are located in the aft part of the vessel in the space between the central and side hulls, both sides of the central and inner sides of the side hulls contain directions for reloading bridges. The guides are arcuate, and their number on each side does not exceed half the number of sections of each transshipment bridge. Sections of transshipment bridges have side baffles. 2 hp f-ly, 17 ill. Ct S (L 00 QD cl JV CO f tJ9f7

Description

Изобретение относитс  к судостроению и водному транспорту,, в частности к судам, предназначенньп дл  доставки различных штучных и навалоч- грузов на необорудованный берег.The invention relates to shipbuilding and water transport, in particular to ships, intended for the delivery of various piece and bulk cargo to an unequipped shore.

Целью изобретени   вл етс  повышение надежности, безопасности при проведении грузовых операций,, а также сокращение времени проведени  этих операций.The aim of the invention is to increase reliability, safety during cargo operations, as well as to reduce the time for these operations.

На фиг.1 - схематически изображено судно, в аксонометрии; на фиг.2 - TCI же, вид сбоку; фиг„3 - то же, в ;плане; на фиг.4 - то же, продольный в двух проекхщ х; на фиг.5 - по|перечное сечение по носовой части; на) фиг.6 - поперечное сечение в районе жилой надстройки; на фиг. 7 - по- пе-речное сечение по миделю; на фиг.8 поперечное сечение по кормовой части на фиг.9 - концева  (берегова ) сек- ци плавз чего перегрузочного моста, сбоку;на фиг. 10 - то же,,в плане;на фИ1Г.11 - сечение А-А на фиг.9; на фи|г.12 - сечение Б-Б на фиг. 10; на фИ|Г.13 - секции плавучего перегрузоч но)го моста в положении по-походному, ви сбокуj на фиг„14 - плавучий складной перегрузочный мост в рабо- че|и положении, вид сбоку; на фиг. 15- то; же, в плане; на фиг,1б - перегру- зочный мост в процессе установки из положени  по-походному в рабочее по- ло: ение; на фиг. 17 - судно с установ лепными в рабочее положение склад- Hb4iH перегрузочными мостами,Figure 1 - schematically depicts the vessel, in a perspective view; figure 2 - TCI is the same, side view; Fig „3 - the same, in; plan; figure 4 - the same, longitudinal in two projects; figure 5 - on | pepper section on the nose; on) Fig.6 is a cross section in the area of a residential superstructure; in fig. 7 - cross section along the midsection; Fig. 8 shows a cross section of the aft section of Fig. 9, the end section of the transshipment bridge of the transshipment bridge, on the side; 10 - the same, in plan; FIG. 11 - section A-A in FIG. 9; on phi | r.12 - section bb in fig. ten; on fI | D.13 - sections of floating overload bridge in the traveling position, on the side j in Fig „14 - floating folding reloading bridge in work and in position, side view; in fig. 15; same in terms of; Fig. 1b shows a reloading bridge during installation from a position in a working mode to a working area; in fig. 17 - the vessel with installed in the working position of the warehouse-Hb4iH transshipment bridges,

; Судно содержит два боковых 1 и : один центральный 2 корпусы, соединенные в средней подводной и надводной част х в один корпус 3. Надводна  чайть корпуса 3 имеет жилую надстроку 4, верхнюю 5, главную 6 и промежу точн}то 7 грузовые палубы, кормовую надстройку 8 с палубой 9, бортовыми 10 и кормовой 11 обшивками. В кормовой части 11 надстройки 8 устроены проемы 12, закрьшаемые брызгозащит- ными вертикально перемещаемыми закрыти ми 13. В носовой части корпуса 3 на главной палубе устроен проем 14, закрываемый створчатым водонепроницаемым закрытием 15. В районе мидел  на верхней расположена рубка 16, в которой размещен грузовой лифт 17 с закрытием 18. Лифт размещаетс  в шахте 19 среднего корпуса 2. Нижн   площадка 20 лифта 17 расположена выше главной; The vessel contains two side 1 and: one central 2 hulls connected in the middle submarine and surface parts in one body 3. The surface water of hull 3 has a residential superstructure 4, the upper 5, the main 6 and a span of 7 cargo decks, aft superstructure 8 with deck 9, side 10 and aft 11 linings. In the aft 11 of the superstructure 8, there are openings 12 closed by splash-proof vertically movable closures 13. In the forward part of hull 3 on the main deck there is an opening 14 closed by a folding waterproof closure 15. In the area of the middle, there is a wheelhouse 16 in which the freight elevator 17 with closure 18. The elevator is located in the mine 19 of the middle building 2. The lower platform 20 of the elevator 17 is located above the main

Q Q

5 0 5 0 5 0 5 0

Q 5Q 5

5five

00

5five

палубы 6, к ней имеетс  подход по пандусу 21, размещенному в корпусе 2. Проем в Носовой переборке 22 корпуса 2 имеет водонепроницаемое закрытие 23. В кормовой части корпуса 3 между боковыми корпусами 2 и центральным корпусом 1 имеютс  пространства 24 дл  хранени  по-походному плавучих секций 25 двух перегрузочных мостов 26. Плавучие секции соедин ютс  между собой валами 27 и 28, а концева  секци  29 перегрузочных мостов с помощью шарнира 30 соедин етс  с главной палубой 6.deck 6, it is approached by a ramp 21 housed in hull 2. The opening in the Bow bulkhead 22 of hull 2 has a watertight closure 23. In the aft part of hull 3 between the side hulls 2 and the central hull 1 there are spaces 24 for storing float sections 25 of the two transshipment bridges 26. The floating sections are interconnected by shafts 27 and 28, and the end section 29 of the transshipment bridges is connected to the main deck 6 by means of a hinge 30.

В подводной части судна установлены носовые 31 и кормовые 32 винтору- левые колонки, которые могут подниматьс  в машинные отделени  33 и 34, расположенные в оконечност х боковых корпусов 1 на главной палубе. Боковые 1 и средний 2 корпусы образуют единый подводный корпус от носа до транца 35, расположенного перед анга- рэми мостов 26. От носовой части до транца 35 подводна  часть 36 корпуса (днищева ) имеет слабо выраженную форму тримарана, а за транцем 35 корпус тримаранный. Смежные плавучие секции моста 26 соедин ютс  с помощью переходной секции 37, с каждой стороны которой расположены горизонтальные валы 27 и 28, причем смежные секции моста имеют три опорные конструкции 38,39 и 40, а переходна  секци  - две опорные конструкции 41 и 42 причем эти конструкции, череду сь , образуют в плане тип зубчатого соединени . По концам переходной секции 37 вне поперечного габарита моста 26 с каждой стороны имеютс  направл ющие элементы 43 в форме параллелограмма 44. Секции имеют поперечные 45 и продольные 46 водонепроницаемые переборки, а на проезжей части 47 моста - боковые выступающие отбойные ограждени  48„ Концева  берегова  плавуча  секци  49 имеет уменьшенную высоту борта 50 и съезд 51 в части 52, прт-ыкающей к берегу 53. На внутренних бортах 54 боковых 1 и среднего 2 корпусов от уровн  грузовой ватерлинии 55 до верхнего положени  направл ющих элементов 43 расположены дугообразные направл ющие 56, по которым перемещаютс  направл ющие элементы 43 г. помощью электрогидрав ического П 1ииодл.In the underwater part of the vessel, the bow 31 and stern 32 screw-left columns are installed, which can be lifted into the engine rooms 33 and 34 located in the tips of the side hulls 1 on the main deck. The side 1 and middle 2 hulls form a single underwater hull from the nose to the transom 35, located in front of the angarami bridges 26. From the nose to the transom 35, the submarine portion of the hull (bottom) has a weakly defined trimaran shape, and behind the transom 35, the trimaran hull. Adjacent floating sections of the bridge 26 are connected by means of a transition section 37, on each side of which horizontal shafts 27 and 28 are located, with the adjacent sections of the bridge having three supporting structures 38.39 and 40, and the transition section having two supporting structures 41 and 42 the structures, in succession, form a type of gear joint in plan. At the ends of the transition section 37, beyond the transverse dimension of the bridge 26, there are on each side guiding elements 43 in the form of a parallelogram 44. The sections have 45 transverse and 46 longitudinal watertight bulkheads, and on the bridge road 47 there are lateral protruding fences 48 49 has a reduced height of the bead 50 and the exit 51 in part 52 extending towards the shore 53. On the inner edges 54 of the side 1 and middle 2 hulls from the level of the load waterline 55 to the upper position of the guide elements 43 arcuate guide 56, which move the guide members 43 via g. elektrogidrav nical P 1iiodl.

1313

Судно используетс  следующим образом .The vessel is used as follows.

В порту отправлени  судно загру- жаетс  необходимыми грузами на грузо- вые палубы и в бортовые грузовые отсеки , приспособленные дл  перевозки навалочных и жидких грузов. На борт судна принимаетс  штатна  судова  механизаци  и самоходные пере- грузочные средства дл  проведени  разгрузки на необорудованный берег (автопогрузчики различных типов, грузовые автомобильные краны), грузовые транспортные средства (грузовые автомобили, платформы на воздушной подушке и амфибийный т гач), способные работать в различных средах, на различных грунтах и различных уклонах берега и прибрежного дна, В мес- те разгрузки судно подходит к берегу на безопасное рассто ние, работа  вин торулевыми колонками, разворачиваетс  кормой в сторону берега и становитс  на носовые и кормовые  кор , вьщержива  рассто ние, равное длине перегрузочных мостов. Одновременно производитс  подъем брызгозащитных закрытий 13 кормовых проемов 12. После постановки на  кор  последователь- но устанавливаютс  в рабочее положение перегрузочные мосты 26. Дл  этого с помощью электрогидравлического устройства направл ющих элементов 43 левого и правого борта кормовые пары плавучих секций 25 перегрузочного моста 26 перемещаютс  по направл ющим 56. Вначале занимает рабочее положение концева  берегова  пара секций 49, а затем продолжают опускать- с  на воду последовательно все остальные пары плавучих секций. Последней опускаетс  судова  секци  29, котора  поворачиваетс  вокруг оси 30 и устанавливаетс  в уровень главной грузовой палубы 6. Левый мост 26 предварительно подготовлен к работе. По нему к берегу перемещаетс  амфибий ньот т гач. С его помощьюд если необходимо , а также с помощью маневрироIn the port of departure, the vessel is loaded with the necessary cargo onto cargo decks and in the onboard cargo compartments adapted for the transport of bulk and liquid cargo. On board the ship, standard ship mechanization and self-propelled transshipment facilities are carried out to carry out unloading on an unequipped shore (auto-loaders of various types, cargo truck cranes), cargo vehicles (trucks, air-cushion platforms and amphibious weight) that can operate in various on different soils and different slopes of the coast and the coastal bottom. In the place of unloading the vessel approaches the coast for a safe distance, the operation is made of rmoy toward the shore and becomes at the bow and stern anchor, vscherzhiva distance equal to the length of the dock levellers. At the same time, the splash protection closures 13 of the stern openings 12 are lifted. After placing on the crust, the loading bridges 26 are set in working position. To do this, using an electro-hydraulic device of the left and right side guiding elements 43 of the left and right side, the stern pairs of floating sections 25 of the loading bridge 26 are moved along 56. Initially, it occupies the working position of the end coastal pair of sections 49, and then continues to lower all other pairs of floating sections into the water. The last section of the ship section is 29, which rotates around axis 30 and is set to the level of the main cargo deck 6. The left axle 26 is pre-prepared for operation. On it, amphibians nyot t gach moves to the shore. Use it if necessary, as well as using a maneuver.

вани  судна окончательно устанавливаетс  положение береговой секции моста и всего моста в целом. Окончательно фиксируетс  положение судна на месте  корной сто нки. Аналогичным образом производитс  установка другого моста. После этого судно подготовлено к выгрузке грузов на необорудо- ваиньп берег. Из грузовьк помещенийThe vessel’s position is finally determined by the position of the coastal section of the bridge and the bridge as a whole. The position of the vessel at the site of the crust is finally fixed. Similarly, another bridge is installed. After that, the vessel was prepared for unloading cargo onto the Neobrudino shore. Of truck space

Q 5 0 5 о . „ Q 5 0 5 about. „

5five

4545

00

5five

-,74- 74

на главной 6, промежуточной 7 и верх-- ней 5 палубах груз средствами судовой механизации выгружаетс  на берег по четырем технологическим лини м, так как ширина перегрузочного моста выбираетс  из условий обеспечени  как максимальной интенсификации перегрузочного процесса (двухстороннего дв11же- ,ни  по мосту), так и надежности перегрузки в услови х волнени  путем контрол  достаточной остойчивости и незаливаемости секций моста и минимальных их просадок при движении транспорта. С верхней 5 и промежуточной 7 грузовых палуб груз перемещаетс  на главную палубу 6 с помощью лифта 17 и по пандусу 21.on the main 6, intermediate 7 and upper 5 decks, ship mechanization unloads ashore along four process lines, since the width of the transshipment bridge is chosen from the conditions of ensuring as the maximum intensification of the transshipment process (double-sided or bridge), and overload reliability in conditions of roughness by controlling sufficient stability and non-closure of the bridge sections and their minimum drawdowns when the traffic is moving. From the upper 5 and intermediate 7 cargo decks, the cargo is moved to the main deck 6 by means of an elevator 17 and a ramp 21.

В случае использовани  судна как буферного временного плавучего перегрузочного причала-моста грузовые операции производ тс  в следующем пор дке. После окончательной поставки судна на  кор  открьшаетс  носовой проем 14 на главной палубе 6. Носовое створчатое закрытие 15 открываетс  к бортам. К носовой части судна швартуетс  грузовое судно с горизонтальным способом грузовых операций . Схема швартовки этого судна зависит от типа кормовой или носовой рампы (пр ма , углова  или поворотна ) . С помощью швартовых суда закрепл ютс  между собой, а судова  рампа грузового судна устанавливает- с  на грузовую палубу судна с плавучи- ;МИ мостами. После окончательной фиксации судов начинаютс  грузовые операции. Груз по рампе перемещаетс  на грузовую палубу 6, а затем по перегрузочному мосту 26 - на берегIn the case of using the vessel as a buffer temporary floating reloading pier-bridge, cargo operations are carried out in the following order. After the final delivery of the vessel to the core, a nasal opening 14 is opened on the main deck 6. The nasal wing closure 15 opens to the sides. A cargo vessel is moored to the bow of the ship with a horizontal mode of cargo operations. The mooring scheme for this vessel depends on the type of stern or bow ramp (straight, angled or angled). With the help of mooring vessels, they are fixed between each other, and the vessel's ramp of the cargo vessel is installed on the cargo deck of the vessel with buoy bridges. After the final fixation of ships, cargo operations begin. The cargo moves along the ramp onto cargo deck 6, and then along transshipment bridge 26 - to the shore

После завершени  грузовых операций раьшу убирают, грузовое судно отходит от судна с перегрузочными плавучими мостами. Закрываютс  носовые ворота 15, убираютс  последовательно перегрузочные мосты 26. Сначала вокруг оси 30 поворачиваетс  судова  секци  29 моста 26, дл  чего с помощью электрогидравлического привода по направл ющим 56 перемещаютс  опорно-направл ющие элементы 43 от уровн  грузовой ватерлинии 55 до верхнего положени  вала 27. После установки первой пары секций 25 моста 26 последовательно устанавливают- .с  в положение по-походному остальные секции моста. Последней убираетс  концева  берегова  секци  49. Производитс  крепление секций левого моста по-походному. Аналогичным образом убираетс  другой перегрузочный мост 26. Опускаютс  брызгонепроница- емые закрыти  13 в проемы 12. Задраиваютс  по-походному водонепроницаемыми закрыти ми 23 носова  переборка 22 Корпуса 2 на главной палубе б и закрыти ми 18 грузова  рубка 16 шахты лифта 17. Судно готово к эксплуатации.After the completion of the cargo operations, the rash is removed, the cargo vessel departs from the vessel with reloading floating bridges. The nasal gates 15 are closed, the overload bridges 26 are removed successively. First, the ship section 29 of the bridge 26 is rotated around the axis 30, for which the supporting-guide elements 43 from the load waterline 55 to the upper position of the shaft 27 are moved along the guides 56. After the installation of the first pair of sections 25 of the bridge 26, the remaining sections of the bridge are sequentially set to the traveling position. The last section of the end section 49 is removed. The sections of the left bridge are fastened in a marching way. Another transshipping bridge 26 is similarly removed. The splashproof closures 13 are lowered into the openings 12. The nasal bulkhead 22 Housings 2 on the main deck b and the closures 18 of the wheelhouse 16 of the elevator shaft 17 are sealed with sea-going 17. The vessel is ready for operation .

Claims (3)

Формула изобретени  : 1. Судно, содержап1;ее корпус с кор- йовой частью, имеющей перегрузочный осг, выполненный из последовательно Ьарнирно соединеиньк между собой пла- Ьучих секций, перва  из которых шар- Йирно закреплена на кормовой части. Отличающеес  тем, что, С целью повьшени  над,€жности в рабо- te, безопасности при выполнении грузовых операций, а также сокращени  времени проведени  этих операций, кормова  часть выполнена с вертикальным открытым снизу проемом, а перва  секци  закреплена на передней торцовой части этого проема, при этом на вертикальных боковых переборках проема вьшолнена направл ющие дл  размещени  в них направл ющих элементов„ которыми снабжены секции моста.Claims of the invention: 1. Vessel containing 1; its hull with a cowling section having a transshipment OSG, made of serially hinged joints between the flexible sections, the first of which are attached to the stern. In order to improve operation, safety in carrying out cargo operations, as well as reduce the time for these operations, the stern part is made with a vertical open bottom opening, and the first section is fixed on the front end part of this aperture. In this case, on the vertical side bulkheads of the opening, there are guides for placing guides in them which are provided with sections of the bridge. 2.Судно по П.1, отличающеес  тем, что все направл ющие выполнены дугообразной формы и их количество на каждом борту равно половине количества секций перегрузочного моста.2. A vessel according to Claim 1, characterized in that all the guides are arcuate and their number on each side is equal to half the number of sections of the transshipment bridge. 3.Судно попп.1и2, отличающеес  тем, что кормова  оконечность судна выполнена тримаран- ной, а проемы выполнены между полукорпусами этой тримаранной части.3. Vessel popp. 1 and 2, characterized in that the stern end of the vessel is made trimaran, and the openings are made between the semi-hulls of this trimaran part. //// гзgz 7 5,27 5.2 срие.1Sriе.1 фиг. 6FIG. 6 36 36 5five 1313 5050 5 фиг.9 1-)., /5 Fig.9 1-). / 6.,9 % 14 ,,f 6., 9% 14 ,, f 9 249 24 / // / фие.Шfie.Sh 0 7  0 7 .... i(6 9 i (6 9 tpfJc fftpfJc ff B 8 S B 8 S /J / J 3737 UlfUlf ijs f4ijs f4 тt гg
SU864075708A 1986-06-05 1986-06-05 Vessel SU1395537A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864075708A SU1395537A1 (en) 1986-06-05 1986-06-05 Vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864075708A SU1395537A1 (en) 1986-06-05 1986-06-05 Vessel

Publications (1)

Publication Number Publication Date
SU1395537A1 true SU1395537A1 (en) 1988-05-15

Family

ID=21240713

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864075708A SU1395537A1 (en) 1986-06-05 1986-06-05 Vessel

Country Status (1)

Country Link
SU (1) SU1395537A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2566804C2 (en) * 2014-01-15 2015-10-27 Российская Федерация, От Имени Которой Выступает Министерство Промышленности И Торговли Российской Федерации Hull of displacement ship-half-trimaran
RU2707161C2 (en) * 2017-12-14 2019-11-22 Федеральное государственное казенное военное образовательное учреждение высшего образования "Военный учебно-научный центр Военно-Морского Флота "Военно-морская академия им. Адмирала Флота Советского Союза Н.Г. Кузнецова" Transport ship for carrying out cargo operations on unequipped shore with reinforced aircraft armament
CN111501677A (en) * 2020-04-26 2020-08-07 中船黄埔文冲船舶有限公司 Fender structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Акцептованна за вка DE N 2723797, кл. В 63 В 27/14, опублик. 1979. *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2566804C2 (en) * 2014-01-15 2015-10-27 Российская Федерация, От Имени Которой Выступает Министерство Промышленности И Торговли Российской Федерации Hull of displacement ship-half-trimaran
RU2707161C2 (en) * 2017-12-14 2019-11-22 Федеральное государственное казенное военное образовательное учреждение высшего образования "Военный учебно-научный центр Военно-Морского Флота "Военно-морская академия им. Адмирала Флота Советского Союза Н.Г. Кузнецова" Transport ship for carrying out cargo operations on unequipped shore with reinforced aircraft armament
CN111501677A (en) * 2020-04-26 2020-08-07 中船黄埔文冲船舶有限公司 Fender structure

Similar Documents

Publication Publication Date Title
US3823681A (en) Barge carrying transport vessel
US6516737B2 (en) Autonomous container ship
US3380422A (en) Cargo vessel
US3841254A (en) Vessel with removable sections
US3138131A (en) Inclined deck ship
SU1395537A1 (en) Vessel
US4488503A (en) Barge carrying ship and method of loading same
US2985131A (en) Container ship
EP0401321B1 (en) A vehicle ferry having enhanced flooding survival capability combined with unimpeded flow of ro-ro traffic
US3978806A (en) Vessel with flooded hold for transport of barges
EP0101171A1 (en) Barge carrying vessel
SU1189733A1 (en) Ship for conveying rolling-on cargoes
GB2101942A (en) Hull structure fore RO-RO-ship
FI78035B (en) FOER REFRIGERATION FOER PAO- OCH FRAONLASTNING AV VAROR.
KR810001448B1 (en) Barge-carrying waterborne vessel transportation method
RU2792998C1 (en) Hull
WO2012054970A1 (en) A marine vessel for and method of transferring roro cargo between vessels at sea
KR810001447B1 (en) Barge-carrying waterborne vessel
SU1260295A1 (en) Floating wharf
KR820001819B1 (en) Dockship
GB2123354A (en) Barge carrying vessel
SU921940A1 (en) Versions of cargo vessel
SU1650514A1 (en) Cargo ship
JP2024047814A (en) Ships
RU2104209C1 (en) Light landing party ferry