SU1393772A1 - Method of mounting a gantry crane - Google Patents

Method of mounting a gantry crane Download PDF

Info

Publication number
SU1393772A1
SU1393772A1 SU853976645A SU3976645A SU1393772A1 SU 1393772 A1 SU1393772 A1 SU 1393772A1 SU 853976645 A SU853976645 A SU 853976645A SU 3976645 A SU3976645 A SU 3976645A SU 1393772 A1 SU1393772 A1 SU 1393772A1
Authority
SU
USSR - Soviet Union
Prior art keywords
supports
span
crane
horizontal
guides
Prior art date
Application number
SU853976645A
Other languages
Russian (ru)
Inventor
Борис Николаевич Черкасов
Юрий Францевич Горбун
Виктор Александрович КУЗНЕЦОВ
Владимир Васильевич Быстрый
Original Assignee
Предприятие П/Я М-5835
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Предприятие П/Я М-5835 filed Critical Предприятие П/Я М-5835
Priority to SU853976645A priority Critical patent/SU1393772A1/en
Application granted granted Critical
Publication of SU1393772A1 publication Critical patent/SU1393772A1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Изобретение относитс  к области подъемно-транспортного машиностроени . Цель изобретени  - возможность монтажа в ограниченном пространстве. Способ монтажа козлового крана заключаетс  в том, что при соединении опор 4 с пролетным строением 3 нижние концы опор ориентируют вдоль пролета посредством горизонтальных направл ющих 12. Подъем пролетного строени  3 осуществл ют при опирании его торцевых частей посредством опорных элементов 8 на вертикальные направл ющие 11. 4 ил.The invention relates to the field of lifting and transport machinery. The purpose of the invention is the possibility of installation in a limited space. The method of mounting the gantry crane consists in the fact that when the supports 4 are connected to the span structure 3, the lower ends of the supports are oriented along the span by means of horizontal guides 12. Lifting the span structure 3 is carried out by supporting its elements 8 on vertical guides 11. 4 il.

Description

1313

(L

со соwith so

ООOO

-h

toto

vfV / / / / У Л /{V / / х V / W УК/ / vfV / / / / U L / {V / / x V / W MC / /

.1.one

.1.one

Изобретение относитс  к общему машиностроению, а именно к подъемно- транспортному оборудованию, и может быть использовано в производственных сооружени х.The invention relates to general engineering, in particular to lifting and transport equipment, and can be used in production facilities.

Целью изобретени   вл етс  обеспечение возможности монтажа в ограниченном пространстве.The aim of the invention is to provide mounting possibilities in a limited space.

На фиг. 1 изображен кран в процес-iQ ки 5 - по горизонтальным направл юсе монтажа в производственном помещении , общий вид; на фиг. 2 - то же, вид сверху; на фиг, 3 - кран после окончани  монтажа; на фиг. 4 - то же вид сверху.FIG. 1 shows a crane in the process-iQ 5; 5 - along horizontal directions of installation in a production room, general view; in fig. 2 - the same, top view; FIG. 3 shows the tap after installation; in fig. 4 - the same top view.

В производственном помещении 1 монтируют козловой кран 2, включающий пролетное строение 3 и опоры 4 с опорными катками 5.In the production area 1 mounted gantry crane 2, including the span structure 3 and supports 4 with the support rollers 5.

На стенах 6 производственного по- мещени  1 установлены горизонтальные опоры 7 на уровне торцев моста. Торцы моста снабжены опорными элементами 8 , взаимодействующими с опорами 7. Стойки опор 4 крана щарнирно с по мощью шарниров 9 соединены с крановым мостом 3.On the walls 6 of the production room 1 horizontal supports 7 are installed at the level of the ends of the bridge. The ends of the bridge are provided with supporting elements 8 interacting with the supports 7. The legs of the supports of the crane 4 are hinged with the help of the hinges 9 connected to the crane bridge 3.

Опорные каретки 5 и опорные элементы В выполнены с возможностью фиксированного разворота в продольной вертикальной плоскости крана 2, а стены 6 и фундамент 10 производственного помещени  выполнены с вертикальными 11 и горизонтальными 12 направл ющими , взаимодействующими с опорными элементами 8 и опорными катками 5 крана 2.The support carriages 5 and the supporting elements B are made with the possibility of a fixed turn in the longitudinal vertical plane of the crane 2, and the walls 6 and the foundation 10 of the production room are made with vertical 11 and horizontal 12 guides interacting with the supporting elements 8 and the supporting rollers 5 of the crane 2.

Дл  установки крана 2 в рабочее положение могут быть использованы лебедки 13 и полиспаст 14.To install the crane 2 in the operating position can be used winches 13 and pulley 14.

Вариантом выполнени   вл етс  установка козлового крана снаружи производственного помеш,ени , т.е. кран охватывает производственное помещение , при этом горизонтальные опоры 7 размещены на наружных поверхност х боковых стен 6 производственного помещени , а взаимодействующие с ним опорные элементы 8 - на внутренней стороне моста, кроме того, перекрытие производственного помещени  выполнено раздвижным. An embodiment of this is the installation of a gantry crane outside the production room, i.e. The crane covers the production room, while the horizontal supports 7 are placed on the outer surfaces of the side walls 6 of the production room, and the supporting elements 8 interacting with it - on the inner side of the bridge, in addition, the overlapping of the production room is made sliding.

Монтаж крана осуществл ют следующим образом.The installation of the crane is carried out as follows.

Соедин ют опоры 4 с пролетным строением 3, монтируют опорные катки 5 и опорные элементы 8 ориентируют нижние концы опор 4 внутрь пролета на горизонтальных направл ющих 12The supports 4 are connected to the span 3, the support rollers 5 are mounted and the support elements 8 orient the lower ends of the supports 4 inside the span on the horizontal guides 12

затем лебедкой 13 ное строение 3then winch 13 nye structure 3

поднимают пролет- до уровн  горизонтальных опор 7. При подъеме пролетного строени  3 опорные элементы 8, смонтированные на торцах моста, скольз т по вертикальным направл ющим 11, расположенным на стенках 6 производственного помещени , а опорные катщим 12, расположенным на фундаменте, что облегчает подъем крана. После подъема крана в рабочее положение опорные элементы 8 Перевод т в вертикальных направл ющих 11 на горизонтальные опоры 7 и фиксируют их в продольной вертикальной плоскости крана , опорные катки 5 разворачивают в рабочее положение и фиксируют.raise the span to the level of the horizontal supports 7. When lifting the span, 3 supporting elements 8 mounted on the ends of the bridge slide along vertical guides 11 located on the walls 6 of the production room, and supporting 12 on the foundation, which facilitates lifting the crane. After the crane is lifted to the working position, the supporting elements 8 are transferred into vertical guides 11 on horizontal supports 7 and fixed in the longitudinal vertical plane of the crane, the supporting rollers 5 are turned to the working position and fixed.

Способ монтажа крана может быть использован и дл  монтажа строительных конструкций. При этом горизонтальные направл ющие располагают под конструкцией вне ее габаритов параллельно ее боковым сторонам, причем указанные вторые концы опор при установке на горизонтальные направл ющиеThe method of installation of the crane can be used for installation of building structures. In this case, the horizontal guides are placed under the structure outside its dimensions parallel to its sides, and the specified second ends of the supports, when mounted on horizontal guides

О ABOUT

5five

00

5five

00

обращают к противоположному торцу конструкции, не соединенному с данными опорами. Перемещение вторых концов опор производ т в направлении соединени  первых концов перемещаемых опор с торцем конструкции.appeal to the opposite end of the structure, not connected with these supports. The movement of the second ends of the supports is made in the direction of the connection of the first ends of the movable supports with the end of the structure.

При монтаже вторые концы одной из двух пар опор, щарнирно соединен- ных с одной из торцевых сторон поднимаемой конструкции, перемещают асинхронно с перемещением вторых концов другой пары опор, соединенных с другой торцевой стороной этой же конструкции , что обеспечивает использование одного и того же привода дл  последовательного перемещени  противоположных торцев конструкции (или крана). При перемещении вторых концов опор по крайней мере один из торцев поднимаемой конструкции перемещают вдоль вертикальных направл ющих 11, размещенных параллельно торцам поднимаемой конструкции на стенах здани .During installation, the second ends of one of the two pairs of supports, which are hingedly connected to one of the end sides of the lifted structure, are moved asynchronously with the movement of the second ends of the other pair of supports connected to the other end side of the same structure, which ensures the use of the same drive for sequential movement of opposite ends of the structure (or crane). When moving the second ends of the supports, at least one of the ends of the lifted structure is moved along vertical guides 11 placed parallel to the ends of the lifted structure on the walls of the building.

Второй вариант способа подъема строительных конструкций заключаетс  в следующем.A second variant of the method of lifting building structures is as follows.

Конструкцию щарнирно соедин ют каждой (торцевой) стороной с одним концом каждой из опор, вторые концы которых устанавливают на горизонтальные направл ющие и перемещают вдольThe design is hingedly connected to each (end) side with one end of each of the supports, the second ends of which are mounted on horizontal guides and move along

последних. Горизонтальные направл ющие располагают под конструкцией или вне ее габаритов перпендикул рно ее боковым сторонам. Указанные вторые концы опор при установке на горизонтальные направл ющие обращают в одну сторону, а их перемещение производ т в одном и том же направлении относительно проекции на горизонтальную ось.last. Horizontal guides are positioned under the structure or outside its dimensions perpendicular to its sides. The said second ends of the supports, when mounted on horizontal guides, are turned in one direction, and their movement is made in the same direction relative to the projection on the horizontal axis.

При перемещении вторых концов опор относительно проекции конструкции на горизонтальную плоскость по крайней мере одну из зон опор непод- вижно закрепл ют от перемещени  в горизонтальной плоскости, при этом ролики 8 кат тс  по вертикальным направл ющим 11, расположенным на стенах здани , а опорные катки 5 - по горизонтальным направл ющим 12.When the second ends of the supports move relative to the projection of the structure on the horizontal plane, at least one of the support zones is fixedly secured against movement in the horizontal plane, with the rollers 8 rolling along the vertical guides 11 located on the walls of the building and the supporting rollers 5 - along horizontal guides 12.

Монтаж крана возможно производить также синхронным перемещением свободных концов опор, не со1Единен- ных с краном, с одновременным подъемом кранового моста 3 или вращением опорных катков 5 относительно поперечных направл ющих 12, при зтом антикреновые ролики 8 также перемещаютс  относительно, вертикальныхIt is also possible to mount the crane by synchronously moving the free ends of the supports that are not connected to the crane, while simultaneously lifting the crane bridge 3 or rotating the support rollers 5 relative to the transverse guides 12, while the anti-ribbing rollers 8 also move relatively vertical

8eight

// //

00

00

5five

00

направл ющих 11. После подъем крана 2 катки 5 и ролики 8 разворачивают в рабочее положение и фиксируют. Работает подъемно-транспортный комплекс следующим образом. При перемещении тележки по крановому мосту горизонтальна  составл юща  крановой нагрузки передаетс  через антикреновые ролики 8 на горизонтальные опоры 7, установленные на стенах здани , и на стены 6.guides 11. After lifting the crane 2, the rollers 5 and the rollers 8 are turned to the working position and fixed. Works lifting and transport complex as follows. When the trolley is moved along a crane bridge, the horizontal component of the crane load is transmitted through anti-roll rollers 8 to horizontal supports 7 mounted on the walls of the building and to walls 6.

Форм.ула изобретени Formula inventions

Способ монтажа козлового крана, заключающийс  в том, что соедин ют шарнирно пролетное строение с опорами и осуществл ют подъем последнего, отличающийс  тем, что, с целью обеспечени  возможности монтажа в ограниченном пространстве, при соединении опор с пролетным строением их нижние концы ориентируют внутрь пролета посредством горизонтальных направл ющих, параллельных продольной оси пролетного строени , а подъем пролетного строени  осуществл ют при опирании его торцевых частей посредством опорных элементов на вертикальные направл ющие.The method of mounting a gantry crane, which consists in connecting the articulated span structure with supports and lifting the latter, characterized in that, in order to enable mounting in a limited space, when connecting the supports with the span structure, their lower ends are oriented inside the span by horizontal guides parallel to the longitudinal axis of the superstructure, and the superstructure is raised by supporting its end parts by means of supporting elements to vertical directions guides.

//

ЧH

rfrf

8eight

Ц)и г. 2C) and d. 2

6 76 7

1one

66

Фие.ЗFi.Z

Фиг. 14FIG. 14

Claims (1)

Форм,у ла изобретенияClaim Способ монтажа козлового крана, заключающийся в том, что соединяют шарнирно пролетное строение с опорами и осуществляют подъем последнего, отличающийся тем, что, с целью обеспечения возможности монтажа в ограниченном пространстве, при соединении опор с пролетным строением их нижние концы ориентируют внутрь пролета посредством горизонтальных направляющих, параллельных продольной оси пролетного строения, а подъем пролетного строения осуществляют при опирании его торцевых частей посредством опорных элементов на вертикальные направляющие.The method of mounting a gantry crane, which consists in connecting the articulated span with supports and lifting the latter, characterized in that, in order to enable installation in a limited space, when connecting the supports to the span, their lower ends are oriented inside the span using horizontal guides parallel to the longitudinal axis of the span, and the rise of the span is carried out by supporting its end parts by means of supporting elements on a vertical guide are фиг 2fig 2
SU853976645A 1985-11-14 1985-11-14 Method of mounting a gantry crane SU1393772A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853976645A SU1393772A1 (en) 1985-11-14 1985-11-14 Method of mounting a gantry crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853976645A SU1393772A1 (en) 1985-11-14 1985-11-14 Method of mounting a gantry crane

Publications (1)

Publication Number Publication Date
SU1393772A1 true SU1393772A1 (en) 1988-05-07

Family

ID=21205326

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853976645A SU1393772A1 (en) 1985-11-14 1985-11-14 Method of mounting a gantry crane

Country Status (1)

Country Link
SU (1) SU1393772A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Абрамович И. И. и др. Козловые краны. М.: Магаиностроение, 1983, с. 293. *

Similar Documents

Publication Publication Date Title
JPS57500731A (en)
SU1393772A1 (en) Method of mounting a gantry crane
JPH03110208A (en) Mobile scaffold device for bridge and assembling method for same
US4640383A (en) Movable staging scaffold system for building construction
KR100530351B1 (en) Telescopical Trolley Car for Inspection
SU965971A2 (en) Workshop crane
US3880293A (en) Apparatus for lifting and lateral shifting of heavy constructions
SU1691276A1 (en) Device for mounting of equipment
SU1691287A1 (en) Load hoisting device
RU2023107C1 (en) Method for installation of crane track
SU815226A1 (en) Device for lifting job platform
SU1386413A1 (en) Arrangement for pre-welding assembly of box-shaped articles
CN217148319U (en) Section steel collecting and transferring device
SU759448A1 (en) Apparatus for lifting and moving industrial building roof blocks
SU1286711A1 (en) Method and machine for mounting roof of building with use of crane tracks
SU1324706A1 (en) Bench for repair of car bodies
SU1721003A1 (en) Method for erection of structure
SU950663A1 (en) Mechanism of self-erecting tower crane
SU765193A1 (en) Tower for servicing upper areas of rooms
SU1370065A1 (en) Movable hoist
SU548562A1 (en) Method of lifting lengthy structures
SU1286499A2 (en) Arrangement to overhead travelling crane for servicing upper structures
SU1270100A1 (en) Device for raising and setting self-propelled boom cranes on overhead travelling crane
SU673597A1 (en) Tower crane erecting arrangement
SU1312056A1 (en) Arrangement for erecting overhead travelling crane