SU1372059A1 - Roof bolt - Google Patents
Roof bolt Download PDFInfo
- Publication number
- SU1372059A1 SU1372059A1 SU853902210A SU3902210A SU1372059A1 SU 1372059 A1 SU1372059 A1 SU 1372059A1 SU 853902210 A SU853902210 A SU 853902210A SU 3902210 A SU3902210 A SU 3902210A SU 1372059 A1 SU1372059 A1 SU 1372059A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- rod
- sleeve
- anchor
- bulk material
- support
- Prior art date
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Description
(21)3902210/22-03(21) 3902210 / 22-03
(22)27.05.85(22) 05/27/85
(46) 07.02.88, Бюл. № 5(46) 07.02.88, Bull. № 5
(71)Коммунарский горно-металлургический институт(71) Kommunarsk Mining and Metallurgical Institute
(72)Г.Ю.Валуконис (53) 622.281.74(088.8)(72) G.Yu. Valukonis (53) 622.281.74 (088.8)
(56) Семевский В.Н. и др. Штангова крепь. - М.: Недра, 1965, с. 37-38.(56) Semevsky V.N. and others. Shankov support. - M .: Nedra, 1965, p. 37-38.
Авторское свидетельство СССР № 1046531, кл. Е 21 D 20/20, 1982.USSR author's certificate number 1046531, cl. E 21 D 20/20, 1982.
(54) АНКЕР(54) ANCHOR
(57) Изобретение относитс к креплению горных вьфаботок. Цель - снижение трудоемкости установки анкера в скважине и повышение его эксплуатационной надежности. На грузонесущий стержень 2 анкера с торцовым упором 6 в виде диска на замковом кон-ч це надеты опорна 7 и подпорна 10 Етулки с торцовыми опорными фланцами 8 и 11. Между втулками 7 и 10(57) FIELD OF THE INVENTION The invention relates to the fastening of mountain racks. The goal is to reduce the complexity of the installation of the anchor in the well and increase its operational reliability. On the load-carrying rod 2 anchors with an end stop 6 in the form of a disk on the locking end of the ring, the support 7 and the retaining 10 sleeve are fitted with the end support flanges 8 and 11. Between the sleeves 7 and 10
ггyy
(Л(L
расположен сыпучий материал 1А- На выступающем конце стержн 2 установлены подхват 3 и гайка 4. Стержень 2 выполнен с конусным утолщением 5 на замковом конце. Большее основание утолщени 5 сопр жено с упором 6. Между упором 6 и втулкой 7 размещен распорный упругий элемент в виде полой втулки 12. Между втулкой -Юн сыпучим материалом расположен распорный упругий элемент в виде двух шайб 13. При навинчиИзобретение относитс к креплению горных выработок, а именно к анкерной крепи.The bulk material 1A is located. At the projecting end of the rod 2, the pickup 3 and the nut 4 are mounted. The rod 2 is made with a tapered thickening 5 at the locking end. The larger base of the thickening 5 is aligned with the stop 6. Between the stop 6 and the sleeve 7 there is a spacer elastic element in the form of a hollow sleeve 12. The spacer spring element in the form of two washers is located between the sleeve -Yun bulk material 13. When screwing, the invention relates to securing mine workings, namely to anchor support.
Цель изобретени - снижение трудоемкости установки анкера в скважине и повышение его эксплуатационной надежности.The purpose of the invention is to reduce the labor intensity of the installation of the anchor in the well and increase its operational reliability.
На фиг. 1 изображен предлагаемый анкер, общий вид;на фиг. 2 - разрез А-А на фиг. 1.FIG. 1 shows the proposed anchor, a general view; FIG. 2 shows section A-A in FIG. one.
Анкер (фиг. 1 и 2), размещаемый в шпуре 1, состоит из грузонесущего стержн 2 с подхватом 3 и гайкой 4. Замковый ко нец стержн 2 имеет конусообразное утолщение 5 и торцовой упор 6, выполненный в форме диска.The anchor (Fig. 1 and 2), placed in the hole 1, consists of a load-carrying rod 2 with a pickup 3 and a nut 4. The locking end of the rod 2 has a tapered thickening 5 and an end stop 6, made in the form of a disk.
На стерхсень 2 надеты опорна втулка 7 с торцовым фланцем 8, шайба 9 и подпорна втулка 10 с торцовым фланцем 11. Между диском 6 и фланцем 8 размещен распорный упругий элемент, выполненный в виде полой втулки 12, а на фланце 11 - распорный упругий элемент, выполненный в виде шайбы 13. Пространство между диском 8 и шайбой 9 заполнено сыпучим материалом 14.On the UH 2, the bearing sleeve 7 with the end flange 8, the washer 9 and the retaining sleeve 10 with the end flange 11 are fitted. Between the disk 6 and the flange 8 there is a spacer elastic element made in the form of a hollow sleeve 12, and on the flange 11 a spacer elastic element made in the form of a washer 13. The space between the disk 8 and the washer 9 is filled with bulk material 14.
Монтаж анкера осуществл ют следующим образом.The mounting of the anchor is carried out as follows.
На стержень 2 последовательно надевают упругую втулку 12 и опорную втулку 7 с торцовым фланцем 8, после этого втулку 12 обклеивают бумагой с таким расчетом, чтобы образовалс бумажный стакан (не показан ) дл засыпки в него сыпучего мавании гайки 4 упор 6 давит на втулку 12, что приводит к ее расширению в радиальном направлении и закреплению анкера в шпуре 1. Фланец 8 упираетс в утолщение 5, и деформаци втулки 12 прекращаетс . Приложенна к стержню 2 сила через фланец 8 передаетс на материал 14.Одновременно сила сжати действует на материал , 14 с другой стороны.Шайба 13 деформируетс и преп тствует высыпанию материала 14. 2 з.п. ф-лы, 2 ил.A resilient sleeve 12 and a support sleeve 7 with an end flange 8 are sequentially put on the rod 2, then the sleeve 12 is glued over with paper so that a paper cup (not shown) is formed to fill the loose waving nut 4 into it, the support 6 presses on the sleeve 12, which leads to its expansion in the radial direction and securing the anchor in the hole 1. The flange 8 abuts against the thickening 5, and the deformation of the sleeve 12 stops. The force applied to the rod 2 is transmitted through the flange 8 to the material 14. At the same time, the compressive force acts on the material, 14 on the other hand. The washer 13 deforms and prevents the material from being poured out. 2 Cp. f-ly, 2 ill.
териала 14. После заполнени стакана этим материалом на стержень 2 надевают шайбу 9, упругую шайбу 13, подпорную втулку 10 с торцовымmaterial 14. After filling the glass with this material, put the washer 9 on the rod 2, the elastic washer 13, the retaining sleeve 10 with the end face
фланцем 11 и подхват 3. Придержива за хвостовий стержн 2, устройство размещают в шпуре 1, после чего на стержень 2 навинчивают гайку 4.flange 11 and pickup 3. Holding the tails of the rod 2, the device is placed in the hole 1, then screw the nut 4 on the rod 2.
Анкер работает следующим, образом.Anchor works as follows.
При навинчивании гайки 4 упорный диск 6 давит на упругую втулку 12, что приводит к ее расширению в радиальном направлении и закреплению анкера в шпуре. Деформаци втулки 12 происходит до тех пор, пока торцовой фланец 8 не упретс в конусообразное утолщение 5. После этого приложенна к стержню 2 сила net)e- даетс через торцовой фланец 8 наWhen screwing the nut 4, the thrust disk 6 presses on the elastic sleeve 12, which leads to its expansion in the radial direction and securing the anchor in the hole. The deformation of the sleeve 12 occurs until the end flange 8 rests on the cone-shaped thickening 5. Thereafter, the force net) e- applied to the rod 2 is given through the end flange 8 on
сыпучий материал 14. Одновременно сила сжати действует на этот же материал и с другого торца стакана с сыпучим материалом: через фланец 11, шайбы 13 и 9. Упруга шайба 13 при этом деформируетс в радиальном направлении, преп тству высыпанию материала из стакана . bulk material 14. At the same time, the compressive force acts on the same material from the other end of the glass with the bulk material: through flange 11, washers 13 and 9. At the same time, the elastic washer 13 is deformed in the radial direction, preventing the material from spilling out of the glass.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU853902210A SU1372059A1 (en) | 1985-05-27 | 1985-05-27 | Roof bolt |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU853902210A SU1372059A1 (en) | 1985-05-27 | 1985-05-27 | Roof bolt |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1372059A1 true SU1372059A1 (en) | 1988-02-07 |
Family
ID=21179641
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU853902210A SU1372059A1 (en) | 1985-05-27 | 1985-05-27 | Roof bolt |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1372059A1 (en) |
-
1985
- 1985-05-27 SU SU853902210A patent/SU1372059A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4472088A (en) | Mining roof bolt | |
DK637488A (en) | ANCHORING BAR FOR AN ARTIFICIAL RESPECTABLE BANKS | |
CA2011774A1 (en) | Mine roof support structure and method | |
RU1830116C (en) | Fastening member for securing articles in concrete part hole | |
DE69815366D1 (en) | ANCHORAGE DEVICE | |
SU1372059A1 (en) | Roof bolt | |
JPH0619169B2 (en) | Expandable dowel with display of mounting force | |
US4648767A (en) | Fastening element | |
US4289426A (en) | Friction rock stabilizer and method of forming same, and a method of stabilizing an earth structure | |
AU2009328670A1 (en) | Damping device | |
CA2267163A1 (en) | A method of pre-stressing a tendon | |
ES2004790A6 (en) | System for stabilizing and accessing a high building | |
ES2027805T3 (en) | AN INJECTION ANCHOR TO BE INSERTED IN A DRILLED HOLE OF A WALL OF BUILDING OF SEVERAL BODIES. | |
FI75914B (en) | ANKARBULT. | |
SU857495A1 (en) | Supporting rod | |
SU934042A1 (en) | Anchorage roof support | |
SU848662A1 (en) | Device for setting anchorage roof support | |
SU1647148A1 (en) | Roof bolt | |
SU1273587A1 (en) | Bolt for securing scraper unit | |
SU1536014A1 (en) | All-purpose thrust roof bolt with filled-in aggregate | |
SU1671883A1 (en) | Metal anchor with compliant member | |
SU994754A1 (en) | Wedge-slit anchoring roof bolt | |
SU1758239A1 (en) | Anchor for supporting mine workings | |
SU1191595A1 (en) | Roof bolt | |
SU899998A1 (en) | Anchor roof support |