SU1350355A1 - Set for driving mine workings - Google Patents

Set for driving mine workings Download PDF

Info

Publication number
SU1350355A1
SU1350355A1 SU853927284A SU3927284A SU1350355A1 SU 1350355 A1 SU1350355 A1 SU 1350355A1 SU 853927284 A SU853927284 A SU 853927284A SU 3927284 A SU3927284 A SU 3927284A SU 1350355 A1 SU1350355 A1 SU 1350355A1
Authority
SU
USSR - Soviet Union
Prior art keywords
drilling
guides
beams
unit
equipment
Prior art date
Application number
SU853927284A
Other languages
Russian (ru)
Inventor
Сах Мауленкулович Мауленкулов
Израил Шмульевич Коган
Вилли Карлович Гердт
Афанасий Цой
Александр Николаевич Зверев
Original Assignee
С.М.Мауленкулов, И.Ш.Коган, В.К.Гердт, А.Цой и А.Н.Зверев
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by С.М.Мауленкулов, И.Ш.Коган, В.К.Гердт, А.Цой и А.Н.Зверев filed Critical С.М.Мауленкулов, И.Ш.Коган, В.К.Гердт, А.Цой и А.Н.Зверев
Priority to SU853927284A priority Critical patent/SU1350355A1/en
Application granted granted Critical
Publication of SU1350355A1 publication Critical patent/SU1350355A1/en

Links

Abstract

Изобретение относитс  к горному делу и может быть использовано при проведении горных выработок буровзрывным способом. Цель - повышение устойчивости, уменьшение металлоемкости и габаритов агрегата. Агрегат включает установленную на ходовой тележке 1 поворотную платформу 2. На последней посредством гидроцилинд- .ров 7 и звеньев 8 шарнирно закреплены направл ющие 9 с вьщвижными балками (ВБ) 10, на которых установлены каретки I1 с манипул торами 12 и бурильными машинами 13. Вьтолнена ВБ IО с лыжей 19, опорна  поверхность которой имеет шаровую форму. Данна  форма позвол ет беспреп тственно скользить лыже по почве выработки в двух взаимноперпендикул рных направлени х, при надвигании балок 10 в переднее положение дл  бурени  и перемещении ВБ О с направл ющими 9 в направлении , перпендикул рном оси выработки, в случае расширени  выработки. В процессе бурени  ВБ 10 опираютс  на поверхность точвы, что освобождает их от действи  нагрузок: веса оборудовани  и действи  сил, возникающих при работе оборудовани . 3 ил. i сл 7ff Л ff : tn о :/о СП елThe invention relates to mining and can be used in mining operations by drilling and blasting. The goal is to increase stability, reduce metal consumption and overall dimensions of the unit. The unit includes a rotary platform 2 mounted on the trolley 1. On the latter, by means of hydraulic cylinders 7 and links 8, guides 9 are articulated with sliding beams (WB) 10, on which carriages I1 with manipulators 12 and boring machines 13 are installed. WB IO with ski 19, the supporting surface of which has a spherical shape. This form allows the skis to smoothly slide along the working soil in two mutually perpendicular directions, when the beams 10 are pushed into the forward position for drilling and the WB O moves with the guides 9 in the direction perpendicular to the working axis. In the process of drilling, the WB 10 rests on the surface of the point, which frees them from the effects of loads: the weight of the equipment and the forces generated during operation of the equipment. 3 il. i cl 7ff L ff: tn o: / o JV ate

Description

1one

Изобретение относитс  к горному делу и может быть использовано при проведении горных выработок буровзрывным способом.The invention relates to mining and can be used in mining operations by drilling and blasting.

Цель изобретени  - повышение устойчивости , уменьшение металлоемкости и габаритов агрегата.The purpose of the invention is to increase stability, reduce metal consumption and overall dimensions of the unit.

На фиг.1 изображен агрегат в положении бурени , вид сбоку; на фиг.2 - то же, в положении погрузки или транспортировки; на фиг.З - разрез А-А на фиг.2 (механизм поперечного раз- движени  направл ющих с балками и буровым оборудованием).Figure 1 shows the unit in the drilling position, side view; figure 2 - the same, in the loading or transport position; Fig. 3 is a section A-A in Fig. 2 (the mechanism of lateral separation of guides with beams and drilling equipment).

Агрегат дл  проходки горных выработок состоит из ходовой тележки 1, на которой установлена поворотна  платформа 2, несуща  на себе закреп- ленньи в средней части привод 3 ленточного конвейера, содержащего загрузочную часть 4 с бункероь 5 и разгрузочную консольную часть 6. По бокам платформы 2 с помощью гидроцилиндров 7 и звеньев 8 параллелограммных механизмов шарнирно закреплены направл ющие 9 с выдвижными балками 10, на которых подвижно установлены каретки 11 с манипул торами 12 и бурильными машинами 13.The excavation unit consists of a undercarriage 1, on which a rotary platform 2 is installed, bearing in its middle part a drive 3 of a conveyor belt containing a loading part 4 with a bunker 5 and a discharge console part 6. On each side of the platform 2 with by means of hydraulic cylinders 7 and links 8 of parallelogram mechanisms, guides 9 are hinged with pull-out beams 10, on which carriages 11 with manipulators 12 and boring machines 13 are movably mounted.

Погрузку горной массы в бункер 5 загрузочной части 4 конвейера перегружател  производит ковшова  погрузочна  машина 14 периодического действи . Под консольной частью 6 конвейера устанавливаетс  состав, состо щий из нескольких вагонеток 15, в которые производитс  одновременна  загрузка. Консольна  часть 6 св зана с платформой 2 при помощи горизонтального шарнира 16 и домкрата 17. Лента 18 конвейера приводитс  в движении приводом 3. Направл юща  9 выполнена с наклоном в сторону забо , а на конце вьщвижной балки 10 жестко закреплена льгаа 19, опорна  поверхность которой выполнена шаровой формыThe loading of the rock mass into the hopper 5 of the loading part 4 of the conveyor belt loader produces a bucket loading machine 14 of periodic operation. Under the cantilever part 6 of the conveyor, a composition is established consisting of several trolleys 15 into which simultaneous loading is carried out. The console part 6 is connected to the platform 2 by means of a horizontal hinge 16 and a jack 17. The conveyor belt 18 is driven by the drive 3. The guide 9 is inclined towards the bottom, and at the end of the sliding beam 10 is firmly fixed the lion 19, the support surface of which ball-shaped

Агрегат работает следующим образомThe unit works as follows

Б транспортном положении и в положении погрузки горной массы балки 10, каретки 11 с манипул торами 12 и бурильными машинами 13 наход тс  в крайнем правом от забо  положении.Это позвол ет производить беспреп тственную погрузку горной массы, котора  погрузочной машиной 14 грузитс  в бункер 5 пере гружател  и лентой 18 конвейера доставл етс  в установленные под ней вагонетки 15. В транспор1350355In the transport position and in the loading position of the rock mass, the beams 10, the carriage 11 with the manipulators 12 and the drilling machines 13 are in the extreme right of the downstream position. This allows unloading the mountain mass, which is loaded by the loading machine 14 into the hopper 5 the loader and the conveyor belt 18 are delivered to the trolleys 15 installed underneath it. In transport 1350355

тном положении звень  8, платформа 2 и направл ющие 9 образуют два независимых параллелограммных механизма, обеспечивающих минимальный габаритный размер агрегата по ширине.In this position, the links 8, platform 2 and guides 9 form two independent parallelogram mechanisms providing the minimum overall dimensions of the unit in width.

Перед бурением шпуров направл ющие 9 перемещаютс  в поперечном направлении с помощью гидроцилиндров 7 10 и звеньев В параллелограммных механизмов на величину, обеспечивающую возможность разминутьс  с погрузочной машиной 14. Затем перемещают, например , с помощью силовых цилиндров бал- 15 ки 10 относительно направл ющих 9, каретки 11 с манипул торами 12 и бурильными машинами 13 относительно балок 10 в переднее крайнее положение дл  беспреп тственного перемещени  20 бурильных машин в призабойной зоне, что позвол ет качественно Лроизводить обуривание забо .Before drilling the holes, the guides 9 move in the transverse direction using the hydraulic cylinders 7 10 and the links B of the parallelogram mechanisms by an amount which makes it possible to knead with the loading machine 14. Then the beam 10 is moved, for example, using the power cylinders relative to the guides 9, carriages 11 with manipulators 12 and boring machines 13 relative to the beams 10 to the forward extreme position for unrestricted movement of 20 boring machines in the face zone, which allows to produce high quality wilting

При надвигании балки 10 она движетс  вдоль наклонной роверхности на на- 25 правл ющей 9 до упора лыжи 19 в поверхность почвы выработки. Только после этого производитс  перемещение каретки II относительно балки 10.When the beam 10 is thrust, it moves along the inclined surface on the guide track 25 until the ski 19 stops against the surface of the working soil. Only then is the carriage II moved relative to the beam 10.

Выполнение опорной поверхности лы- 30 жи 19 шаровой формы позвол ет беспреп тственно скользить лыже 19 по почке выработки в двух взаимно перпендикул рных направлени х: при надвигании балок 10 в переднее положе- оп ние дл  бурени  и в этом положении перемещени  балок 10 с направл ющими 9 в направлении, перпендикул рном оси выработки, когда требуетс  выполнить в выработке различные ущирени . 40 После надвигани  бурового оборудовани  на забой, ковш погрузочной машины переводитс  в положение разгрузки и фиксируе;гс , освобожда  тем самым призабойную зону.Performing the supporting surface of the ski 30 of ball 19 allows the ski 19 to slide along the kidney in two mutually perpendicular directions: when the beams 10 are in the forward position for drilling and in this position the beams 10 are moving with guides 9 in the direction perpendicular to the axis of excavation, when it is required to perform various extensions in the excavation. 40 After the drilling equipment is pulled to the bottom, the loader bucket is moved to the unloading position and fixes it, thus freeing the bottomhole zone.

45 По окончании бурени  буровое оборудование в обратной последовательности переводитс  в транспортное положение при погрузке. Агрегат передвигаетс  на безопасное от взрыва 50 рассто ние, при этом погрузочна  машина служит дополнительной защитой бурового оборудовани  от взрыва. После взрывани  и проветривани  приступают к погрузке горной массы. 55 В процессе бурени  балки 10 опираютс  на поверхность почвы выработки , что освобождает их от действи  нагрузок: от веса манипул торов с бурильными машинами, а также от деистВИЯ сил, возникающих особенно при бурении вертикальньк шпуров под анкерную крепь.45 At the end of drilling, the drilling equipment is reversed to the transport position during loading. The unit is moved to a safe distance from the explosion 50, while the loading machine serves as an additional protection of the drilling equipment from the explosion. After blasting and aeration, they start loading the rock mass. 55 In the process of drilling, the beams 10 rest on the surface of the production soil, which frees them from the effects of loads: from the weight of manipulators with drilling machines, as well as from the de-forces that arise especially when drilling vertical holes for anchor bolts.

Такое конструктивное исполнение повьшает устойчивость агрегата, ведет к снижению металлоемкости балок, направл ющих и механизма поперечной раздвижки, а также к уменьшению их габаритов.This design improves the stability of the unit, leads to a decrease in metal consumption of the beams, guides and the mechanism of lateral expansion, as well as to reduce their dimensions.

Claims (1)

Формула изобреFormula invented тени the shadows Агрегат дл  проходки горньк выработок , включающий установленную наThe unit for excavation of mine workings, including installed on ходовой тележке поворотнуто платформу , на которой закреплены конвейер, направл ющие с механизмом поперечной раздвижки, выдвижные балки с подвижно установленным на них буровым оборудованием , отличающий- с   тем, что, с целью повьппени  устойчивости , уменьшени  металлоемкости и габаритов агрегата, концы выдвижных балок снабжены жестко закрепленными на них лыжами, опорна  поверхность которых выполнена шаровой формы, при этом направл ющие наклонены в сторону забо .the trolley rotated the platform on which the conveyor is fixed, guides with a cross-sliding mechanism, retractable beams with movable equipment mounted on them, which is so that, in order to increase stability, reduce the metal intensity and dimensions of the unit, the ends of the retractable beams are rigidly equipped the skis fixed on them, the supporting surface of which is made of a spherical shape, while the guides are inclined towards the bottom. Редактор Н.Рогулич Editor N.Rogulich Составитель Н.Кононова Техред Л.ОлийныкCompiled by N.Kononova Tehred L.Oliynyk Заказ 5239/33Тираж 453ПодписноеOrder 5239/33 Circulation 453Subscription ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee по делам изобретений и открытий 113035, Москва, Ж-35, Раушска  наб., д. 4/5.for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab., 4/5. Производственно-полиграфическое предпри тие, г. Ужгород, ул. Проектна , 4Production and printing company, Uzhgorod, st. Project, 4 Корректор М.ПожоProofreader M. Pojo
SU853927284A 1985-07-12 1985-07-12 Set for driving mine workings SU1350355A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853927284A SU1350355A1 (en) 1985-07-12 1985-07-12 Set for driving mine workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853927284A SU1350355A1 (en) 1985-07-12 1985-07-12 Set for driving mine workings

Publications (1)

Publication Number Publication Date
SU1350355A1 true SU1350355A1 (en) 1987-11-07

Family

ID=21188456

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853927284A SU1350355A1 (en) 1985-07-12 1985-07-12 Set for driving mine workings

Country Status (1)

Country Link
SU (1) SU1350355A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173287A (en) * 2019-06-26 2019-08-27 中国铁建重工集团股份有限公司 A kind of normal direction anchor pole mechanism of development machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 649854, кл. Е 21 D 9/10, 1976.. Авторское свидетельство СССР № 870724, кл. Е.21 D 9/00, 1979. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173287A (en) * 2019-06-26 2019-08-27 中国铁建重工集团股份有限公司 A kind of normal direction anchor pole mechanism of development machine

Similar Documents

Publication Publication Date Title
US2694562A (en) Apparatus for continuously digging coal
US4589701A (en) Cutting machine
US3114425A (en) Stepper-type tramming support for mining equipment
CN108798535B (en) Fully-mechanized coal face machine gun combined mining device
US3753595A (en) Longwall mining machine overhanging face side of conveyor
SU1350355A1 (en) Set for driving mine workings
US3268258A (en) Conveying and roof bolting method and apparatus
WO2010057277A1 (en) An apparatus and method for extension of conveyors
US3061288A (en) Steering means for rotary head tunneling machine
US2691514A (en) Planer type coal mining and loading machine
CN208564450U (en) A kind of fully-mechanized mining working machine gun connection device for picking
US3219199A (en) Method for loading mine cars and loading apparatus therefor
CN101065557B (en) Coal-cutting machine
RU2700388C1 (en) Tunneling exploding-loading complex
SU870724A1 (en) Machinery set for driving mining workings
SU1023110A1 (en) Loading machine
SU649854A1 (en) Arrangement for excavating mine workings by blasthole method
SU608965A1 (en) Device for loading rock in mine workings
SU1539314A1 (en) Mine cutter-loader
SU1548445A1 (en) Entry-driving set
CN220267766U (en) Crawler-type underground explosive auxiliary pushing machine
RU2734177C1 (en) Aggregated mining complex
SU1666739A1 (en) Loading device of tunnel shield
US20220325625A1 (en) Mining apparatus and methods
SU899980A1 (en) Installation for driving mine workings