SU1328562A1 - Method of relieving the load of haet-supply steam-turbine plant - Google Patents

Method of relieving the load of haet-supply steam-turbine plant Download PDF

Info

Publication number
SU1328562A1
SU1328562A1 SU853885264A SU3885264A SU1328562A1 SU 1328562 A1 SU1328562 A1 SU 1328562A1 SU 853885264 A SU853885264 A SU 853885264A SU 3885264 A SU3885264 A SU 3885264A SU 1328562 A1 SU1328562 A1 SU 1328562A1
Authority
SU
USSR - Soviet Union
Prior art keywords
boiler
heat
steam
turbine
load
Prior art date
Application number
SU853885264A
Other languages
Russian (ru)
Inventor
Валерий Алексеевич Иванов
Виктор Васильевич Кудрявый
Анатолий Григорьевич Кутахов
Эдгар Ибрагимович Тажиев
Сергей Анатольевич Иванов
Давид Соломонович Богомольный
Original Assignee
Ленинградский Политехнический Институт Им.М.И.Калинина
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ленинградский Политехнический Институт Им.М.И.Калинина filed Critical Ленинградский Политехнический Институт Им.М.И.Калинина
Priority to SU853885264A priority Critical patent/SU1328562A1/en
Application granted granted Critical
Publication of SU1328562A1 publication Critical patent/SU1328562A1/en

Links

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

Изобретение относитс  к теплоэнергетике и м. б. использовано на тепловых электростанци х , привлекаемых к прохождению минимумов графика электрических нагрузок. Изобретение позвол ет повысить экономичность и глубину разгрузки установки. При необходимости разгружени  установки, работающей при минимальном расходе пара (РП) в часть 5 низкого давлени  турбины (Т), путем воздействи  на клапаны II ограничивают РП на регенеративные подогреватели 10. При неизменном, положении регулирующего органа (РО) 2 котла 1 происходит снижение нагрузки и давлени  пара на выходе из котла 1. Регулирующие клапаны 4 в это врем  полностью открыты, что ведет к разгрузке установки при скольз щем начальном давлении и некоторому увеличению тепловой нагрузки отборов Т. Далее воздействием на РО 2 восстанавливают заданное значение тепловой нагрузки отборов Т путем изменени  нагрузки котла 1. При полном прекращении РП на подогреватели 10 разгрузку производ т дальнейщим уменьшением РП на турбину. Осуществл етс  это путем воздействи  на РО 2 с одновременной передачей недоотпуска теплоты отборами Т на пиковый источник 8 тепла. 1 з.п.ф-лы, 1 ил. se (Л 12 УЗ со Ю 00 СП О5 юThe invention relates to a power system and m. B. used in thermal power plants, attracted to the passage of the minima of the schedule of electrical loads. The invention allows to increase the efficiency and depth of unloading of the installation. If it is necessary to unload the unit operating at minimum steam consumption (RP) in the low pressure section 5 of the turbine (T), by acting on the valves II limit the RP to the regenerative heaters 10. At a constant position of the regulator (PO) 2 of the boiler 1, the load decreases and the vapor pressure at the outlet of the boiler 1. The control valves 4 are fully open at this time, which leads to unloading of the installation at a sliding initial pressure and a slight increase in the heat load of the samples T. Next, the impact on the PO 2 is restored The setpoint of the heat load of the withdrawals T is set by changing the load of the boiler 1. With the RP completely stopped on the heaters 10, the unloading is performed by further reducing the RP on the turbine. This is accomplished by acting on the PO 2 with simultaneous transfer of under-admission of heat by selections T to the peak heat source 8. 1 hp ff, 1 ill. se (L 12 UZ WU 00 JV O5 y

Description

Изобретение относитс  к области теплоэнергетики и может быть использовано на теплоэлектроцентрал х (ТЭЦ), привлекаемых к прохождению минимумов графика Электрических нагрузок.The invention relates to the field of heat and power engineering and can be used at combined heat and power plants (CHP) involved in passing the minima of the Electrical loads schedule.

Цель изобретени  - повышение экономичности и глубины разгрузки теплофикационной паротурбинной установки.The purpose of the invention is to increase the efficiency and the unloading depth of the heat and power steam turbine plant.

На чертеже представлена принципиальна  схема теплофикационной паротурбинной установки, реализующей данный способ.The drawing shows a schematic diagram of a heat and steam turbine plant that implements this method.

Установка содержит котел 1 с регулирующим органом 2, часть 3 высокого давлени  турбины с регулирующими клапанами 4, часть 5 низкого давлени  турбины с регулирующей диафрагмой 6, сетевой подогреватель 7 и пиковый источник 8 тепла, линии 9 отборов пара на регенеративные подогреватели К) с клапанами 11, а также обводную линию 12 регенеративных подогревателей 10 с регулирующим органом 13.The installation contains a boiler 1 with a regulator 2, a high pressure turbine part 3 with regulating valves 4, a low pressure turbine part 5 with a regulating diaphragm 6, a network heater 7 and a peak heat source 8, steam extraction lines 9 for regenerative heaters K) with valves 11 as well as the bypass line 12 of the regenerative heaters 10 with the regulatory authority 13.

Способ разгрузки теплофикационной паротурбинной установки реализуетс  следующим образом.The method of unloading the steam-turbine cogeneration plant is implemented as follows.

При необходимости разгружени  теплофикационной паротурбинной установки, работающей при минимальном расходе пара в часть 5 низкого давлени  турбины, ограничивают расход пара на регенеративные подогреватели 10 высокого давлени  путем воздействи  на клапаны 11, установленные на лини х 9 регенеративных отборов пара, либо на регулирующий орган 13 на обводной линии 12. При неизменном положении регулирующего органа 2 котла 1 происходит снижение нагрузки и давлени  пара на выходе из котла 1 в св зи со снижением температуры питательной воды на входе в котел. В то же врем  регулирующие клапаны 4 части 3 высокого давлени  турбинЕ) остаютс  в неизменном полностью открытом положении , что ведет к разгрузке турбоустанов- ки при скольз щем начальном давлении и некоторому увеличению тепловой нагрузки отборов турбины. Далее воздействием на регулирующий орган 2 котла 1 восстанавливают заданное значение тепловой нагрузки отборов турбины путем изменени  нагрузки котла 1. Это приводит к установлению параметров пара на выходе из котла 1 перед регулирующими клапанами 4 части 3 высокого давлени  турбины, соответствующих заданному значению тепловой нагрузки турбины , что обеспечивает увеличение глубины разгрузки при сохранении заданного отпуска тепла. Таким образом осуществл етс  разгрузка теплофикационной паротурбиннойIf it is necessary to unload the steam heat turbine unit operating at the minimum steam flow rate into the low pressure part 5 of the turbine, they limit the steam flow to the high pressure regenerative heaters 10 by acting on valves 11 installed on the lines 9 of the regenerative steam extraction or the regulator 13 on the bypass lines 12. At the constant position of the regulator 2 of the boiler 1, the load and pressure of the steam at the outlet of the boiler 1 decrease due to the lowering of the feed water temperature by course in the boiler. At the same time, the control valves 4 of the high-pressure turbine part 3 remain in the same fully open position, which leads to unloading of the turbine unit with a sliding initial pressure and a slight increase in the heat load of the turbine outlets. Further, the regulator 2 of the boiler 1 is restored by setting the thermal load of the turbine outlets by changing the load of the boiler 1. This sets the steam parameters at the outlet of the boiler 1 before the control valves 4 of the high pressure turbine part 3 corresponding to the specified value of the turbine heat load, which provides an increase in the depth of discharge while maintaining a given heat supply. Thus, unloading of heat and steam turbine is performed.

установки, работающей по тепловому графику , на скольз щих начальных параметрах пара, реализуемых путем ограничени  регенеративных отборов пара и определ емых заданным уровнем тепловой нагрузки отборов турбины.thermal schedule installations on sliding initial steam parameters realized by limiting regenerative steam extraction and turbine selections determined by a given level of heat load.

0 После того, как расход пара на регенеративные подогреватели 10 высокого давлени  полностью ограничен, разгрузку теплофикационной паротурбинной установки производ т дальнейшем уменьшением расхо , да пара на турбину путем воздействи  на регулирующий орган 2 котла 1 с одновременной передачей недоотнуска теплоты отборами турбины на пиковый источник 8 тепла .0 After steam consumption for high-pressure regenerative heaters 10 is completely limited, the unloading of the heat and steam turbine unit is further reduced by the flow rate and steam to the turbine by acting on regulator 2 of boiler 1 with simultaneous transfer of undershoot of heat from the turbine to peak heat source 8 .

00

5five

00

5five

00

5five

Claims (2)

1.Способ разгрузки теплофикационной паротурбинной установки путем уменьшени  расхода пара от котла в часть высокого давлени  при минимальном расходе пара в часть низкого давлени  турбины, с одновременным поддержанием неизменной су.ммар- ной тепловой нагрузки передачей части отпускаемого тепла с отборов турбины на пиковый источник тепла до достижени  технических ограничений по услови м работы оборудовани  и последующего уменьшени  расхода пара на регенеративные подогреватели высокого давлени , отличающийс  тем, что, с целью повышени  эконо.мич- ности и глубины разгрузки, уменьшение расхода пара в часть высокого давлени  производ т при полностью открытых регулирующих клапанах последней путем уменьшени  расхода пара на регенеративные подогреватели высокого давлени  при одновременном снижении паропроизводительности котла воздействием на его регулирующий орган.1. The method of unloading a heat-generating steam-turbine plant by reducing steam consumption from the boiler to the high pressure part while minimizing the steam flow to the low pressure part of the turbine, while maintaining a constant total heat load by transferring part of the heat supplied from the turbine to a peak heat source achieving technical limitations on the operating conditions of the equipment and the subsequent reduction of steam consumption for high-pressure regenerative heaters, characterized in that, in order to increase audio ekono.mich- NOSTA and discharge depth, the decrease in steam flow portion of the high pressure is performed at a fully open control valves latter by reducing steam flow to regenerative heaters high pressure while reducing the influence of steam capacity of the boiler on its regulatory body. 2.Способ по п. 1, отличаюш ийс  тем, что при полном прекрашении расхода пара на регенеративные подогреватели высокого давлени  уменьшают расход пара в часть высокого давлени  воздействием на регулирующий орган котла с одновременным повышением отпуска тепла от пикового источника .2. The method according to claim 1, characterized in that, when the steam flow to the high pressure regenerative heaters is completely stopped, the steam flow to the high pressure part is reduced by affecting the boiler regulator with a simultaneous increase in the heat supply from the peak source.
SU853885264A 1985-04-16 1985-04-16 Method of relieving the load of haet-supply steam-turbine plant SU1328562A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853885264A SU1328562A1 (en) 1985-04-16 1985-04-16 Method of relieving the load of haet-supply steam-turbine plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853885264A SU1328562A1 (en) 1985-04-16 1985-04-16 Method of relieving the load of haet-supply steam-turbine plant

Publications (1)

Publication Number Publication Date
SU1328562A1 true SU1328562A1 (en) 1987-08-07

Family

ID=21173512

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853885264A SU1328562A1 (en) 1985-04-16 1985-04-16 Method of relieving the load of haet-supply steam-turbine plant

Country Status (1)

Country Link
SU (1) SU1328562A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 1285163, кл. F 01 D 17/20, 18.02.85. *

Similar Documents

Publication Publication Date Title
US4207842A (en) Mixed-flow feedwater heater having a regulating device
KR100563518B1 (en) Power regulating process for a steam generating power plant and steam generating power plant
SU1328562A1 (en) Method of relieving the load of haet-supply steam-turbine plant
JPH02185605A (en) Operation of steam turbine apparatus at low load level
RU2748956C1 (en) Method for heat power control in heating system with solid fuel boiler
SU1170179A1 (en) Method of controlling power of extraction steam turbine plant
SU1038497A1 (en) Steam-turbine plant
SU1134737A1 (en) Method of controlling heat load of extraction turbine plant
SU1353893A1 (en) Method of operation of thermal steam-turbine plant with two-flow low-pressure cylinder
SU1090899A1 (en) Method of operating heat-electric generation plant
SU1282623A1 (en) Method of heating feedwater of steam generators of power plant
SU1110912A1 (en) Method for controlling electric power of heat supply steam turbine plant
SU1285163A1 (en) Method for controlling electric power of steam-turbine heating plant
RU1815343C (en) Method of generation of additional power at power-and-heat supply plant with network heaters
SU1070250A1 (en) System for controlling central-heating steam turbine plant
SU1114806A1 (en) Method for obtaining peak power from steam turbine plant
SU580333A1 (en) System for regulating central heating and power plant with common steam line
SU1548476A1 (en) Method of relieving a central-heating steam-turbine plant
SU1665179A1 (en) Power plant
SU546081A1 (en) Method of distributing heat loads between turbine units
SU1430562A1 (en) Method of operation of extraction steam turbine plant
CA1112527A (en) High pressure high temperature boiler start up
SU987122A1 (en) Control system of central heating turboelectric plant
SU1164445A1 (en) Method of controlling steam extraction turbine unit
SU1337534A1 (en) Method of off-loading power units