SU1317144A1 - Mine working support - Google Patents

Mine working support Download PDF

Info

Publication number
SU1317144A1
SU1317144A1 SU854004000A SU4004000A SU1317144A1 SU 1317144 A1 SU1317144 A1 SU 1317144A1 SU 854004000 A SU854004000 A SU 854004000A SU 4004000 A SU4004000 A SU 4004000A SU 1317144 A1 SU1317144 A1 SU 1317144A1
Authority
SU
USSR - Soviet Union
Prior art keywords
lining
connecting nodes
bolts
flanges
racks
Prior art date
Application number
SU854004000A
Other languages
Russian (ru)
Inventor
Евгений Семенович Киселев
Иван Григорьевич Косков
Георгий Игнатьевич Кременецкий
Михаил Михайлович Жербин
Борис Александрович Маркович
Ольга Евгеньевна Киселева
Андрей Евгеньевич Киселев
Original Assignee
Институт горного дела им.А.А.Скочинского
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела им.А.А.Скочинского filed Critical Институт горного дела им.А.А.Скочинского
Priority to SU854004000A priority Critical patent/SU1317144A1/en
Application granted granted Critical
Publication of SU1317144A1 publication Critical patent/SU1317144A1/en

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

Изобретение относитс  к горнодобывающей промышленности, а именно к креплению подземных горных выработок . Целью изобретени   вл етс  снижение трудоемкости, времени монтажа и металлоемкости крепи. Крепь включает рамы, кажда  из которых содержит две стойки, верхн к, соединительные узлы с накладками и межрамные соединительные узлы.-Стойки выполнены в виде панелей желобчатого профил  с перфорированным днищем и фланцами 3. Межрамные соединительные узлы состо т из болтов 10, внутренних 8 и наружных 9 накладок с резьбовыми отверсти ми дл  установки болтов 10. Фланцы 3 желобчатого профил  и накладки 8 снабжены взаимодействующими между собой ребордами 4 и 11. Верхн к и стойки соседних рам установлены в шахматном пор дке с зазорами между их торцами. Зазоры перекрыты пластинами. Под действием сил горного давлени  стойки и верхн к перемещаютс  относительно друг друга, уменьша  зазоры между торцами. Рабочее сопротивление крепи опре;дел етс  величиной сил трени  между панел ми и соединительньши узлами. Наличие соединительных узлов в каждой раме облегчает получение оптимального сопротивлени  крепи. 3 ил. i СЛ 4 Фие.ЗThe invention relates to the mining industry, namely to the fastening of underground mine workings. The aim of the invention is to reduce the labor intensity, installation time and metal lining. The support includes frames, each of which contains two racks, upper, connecting nodes with plates and interframe connecting nodes. Racks are made in the form of grooved profile panels with perforated bottom and flanges 3. Interframe connecting nodes consist of bolts 10, internal 8 and outer 9 lining with threaded holes for the installation of bolts 10. The flanges 3 of the grooved profile and lining 8 are provided with interacting flanges 4 and 11. The upper and the uprights of the adjacent frames are installed in a checkerboard pattern with gaps between their butts. The gaps are covered with plates. Under the action of rock pressure forces, the uprights and the upper are moved relative to each other, reducing the gaps between the ends. The working resistance of the support is determined by the magnitude of the frictional forces between the panels and the connecting nodes. The presence of connecting nodes in each frame makes it easier to obtain optimal support for lining. 3 il. i SL 4 Fi.H

Description

Изобретение относитс  к горно-добывающей промьшшенности, а именно к креплению подземных горных вьфаботокFIELD OF THE INVENTION The present invention relates to the mining industry, namely to the fastening of underground mining operations.

Целью изобретени   вл етс  снижение трудоемкости, времени монтажа и металл о емко с ти крепи.The aim of the invention is to reduce the labor intensity, the installation time and the metal with a capacity from these supports.

На фиг.1 изображена предлагаема  крепь Горных выработок, вид сбоку; на фиг,2 - вид вдоль оси выработки; на фиг.З - стойки и верхн ки рам кре пи с соединительными узлами, а также полотнищами изолирующего покрыти ,Figure 1 shows the proposed lining of mine workings, side view; FIG. 2 is a view along the working axis; Fig. 3 shows racks and upper frames of the frame with connecting nodes, as well as panels of an insulating coating,

поперечное сечение.cross section.

Крепь горных выработок включает рамь1, кажда  из которых содержит стойки 1 и верхн к 2, выполненные в виде криволинейных пространственных панелей желобочного профил , которые  вл ютс  одновременно несущими, ограждак1щими и св зующими элементами На фланцах 3 желобчатого профил  предусмотрены реборды 4, а их днища выполнены перфорированными, например, с использованием машин термической резки (МТР), и сварочных машин или соединением двух Z -образных с ребордами профилей сваркой .через располагаемые вразбежку планки. При необходимости , например, дл  обеспечени  возможности заполнени  закрепленного пространства твердеющими растворами на днищах стоек и верхн ков могут быть закреплены (приклеены) полотнища изолирующего покрыти  5 из водостойкого материала, например, поли- этиленовой пленки, которые имеют выступающие с одной из боковых сторон верхн ков и стоек фартуки 6, а у верхн ков дополнительно и фартуки 7, выступающие с их торцов.Mine support includes frame 1, each of which contains supports 1 and top to 2, made in the form of curvilinear spatial panels of the flute profile, which are simultaneously bearing, protecting and connecting elements. The flanges 3 of the groove profile are provided with flanges 4, and their bottoms are made perforated, for example, using thermal cutting machines (MTP), and welding machines or joining two Z-shaped profiles with flanges by welding. If necessary, for example, to ensure the possibility of filling the fixed space with hardening solutions, the bottom of the uprights and tops can be fixed (glued) to a sheet of insulating coating 5 made of waterproof material, for example, polyethylene film, and racks aprons 6, and at the top moreover and aprons 7, protruding from their ends.

Стойки 1 и верхн ки 2 соседних рам предусматриваетс  устанавливать в выработках в шахматном пор дке с зазорами между их торцами, а у одной из стоек рам крепи - и-с почвой выра ботки, равными необходимой податливости крепи и обеспечиваюш11ми перекрытие этих зазоров верхн ками и стойками соседних рам. Соединительные узлы содержат внутренние 8 и .на- ружные 9 накладки и болты 10.Racks 1 and top 2 of adjacent frames are to be installed in workings in a staggered manner with gaps between their ends, and one of the racks of the lining frames has a working soil equal to the required flexibility of lining and ensuring that the gaps and racks overlap neighboring frames. Connecting nodes contain internal 8 and 9 outer covers and bolts 10.

После выемки массы на ширину крепи одна из наход щихс  на монтажном устройстве панелей крепи захватываетс  захватом 14 телескопической стрелы 13, подноситс  к месту ее установки (навески) на последний комплект крепи и соедин етс  с ним при помощи соединительных узлов, содержащих накладки 8 и 9 и болты 10. Затем в такой же последовательности навешиваютс  две остальные панели вновь устаВнутренние соединительные накладки 8 снабжены двум  парами реборд 11, взаимодействующих с ребордами 4 флан- навливаемого комплекта крепи. В вырацев 3 стоек 1 и верхн ков 2, и резь-ботках со сложными услови ми подд ербовым отверстием под болты 10. Зазо-жани  предусматриваетс  применениеAfter the mass for the width of the support is removed, one of the support panels on the mounting device is caught by the hook 14 of the telescopic boom 13, brought to the place of its installation (hinge) on the last set of supports and connected with it by means of connecting nodes containing plates 8 and 9 and bolts 10. Then, in the same sequence, the two remaining panels of the newly installed connecting plates 8 are mounted with two pairs of flanges 11, interacting with the flanges 4 of the flanged set of supports. In the 3 racks of the pillars 1 and the tops of the 2, and in the threads with difficult conditions, there is an under-hole for the bolts 10. The backplate will use

ры между торцами стоек и верхн кованкеров 17, которые устанавливаютс  between the ends of the pillars and the top of the co-pliers 17, which are mounted

перекрыты также пластинами 12, кото-в зазорах между панел ми крепи. За5they are also covered with plates 12, which are in the gaps between the support panels. 5

5five

O O

0 0 5 00 0 5 0

5 0 50

рые присоединены к ним при помощи наружных накладок 9 и болтов 10, размещенных в перфораци х днища.They are attached to them by means of outer covers 9 and bolts 10 placed in the perforations of the bottom.

В крайних (первой и последней) рамах крепи стойки и верхн ки 2 соединены также узлами с удлиненными соединительными накладками. 15 и 16, аналогичными по конструкции соединительными накладками 8 к 9.In the extreme (first and last) frames, the supports and the tops of the top 2 are also connected by nodes with elongated connecting plates. 15 and 16, similar in construction connecting plates 8 to 9.

Наличие на внутренних соединитель- ных накладках соединительных узлов двух пар реборд позволит установить рамы крепи с переменным по их периметру зазором и тем самым применить крепь и на криволинейных участках выработки . Крепь горных выработок предполагаетс  возводить при помощи кре- пежно-доставочного устройства, которое механизирует операции по выгрузке панелей крепи из транспортных сосудов , доставке их к забою выработки и возведению там в проектное положение . Крепежно-доставочное устройство состоит из основани , монтажного приспособлени  и подъемно-доставочного механизма с телескопической поворотной стрелой 13, имеющей захват 14.The presence of two pairs of flanges on the internal connecting plates of the connecting nodes will make it possible to install the support frames with a gap that is variable along their perimeter and, thus, to apply the lining on the curvilinear production areas. The support of mine workings is supposed to be erected with the help of a securing and haul-out device, which mechanizes the operations of unloading panels of lining from transport vessels, delivering them to the slaughter of production and building there in the design position. The fastening and hauling device consists of a base, a mounting device and a lifting and hauling mechanism with a telescopic swivel boom 13 having a catch 14.

Крепежно-доставочное устройство в рабочем положении находитс  позади основного проходческого оборудовани  (комбайна, погрузочной машины и др.) на рассто нии 8-10 м от забо  выработки .The fastening and haul-off device in the working position is behind the main tunneling equipment (combine, loader, etc.) at a distance of 8-10 m from the downhole.

Во врем  выемки комбайном горной массы панели крепи вместе с закрепленными на них соединительными узлами при помощи телескопической поворотной стрелы 13 крепежно-доставочно- го устройства выгружают из транспортных сосудов, наход щихс  на рассто нии 16-20 м от забо  выработки, доставл ют к монтажному приспособлению и укладывают на него.During the excavation by the mining rock mass, the lining panels, together with the connecting nodes secured to them, with the help of a telescopic swivel boom 13 of the fastening and delivery device are unloaded from transport vessels located 16-20 m from the working output, delivered to the mounting device and laid on it.

После выемки массы на ширину крепи одна из наход щихс  на монтажном устройстве панелей крепи захватываетс  захватом 14 телескопической стрелы 13, подноситс  к месту ее установки (навески) на последний комплект крепи и соедин етс  с ним при помощи соединительных узлов, содержащих накладки 8 и 9 и болты 10. Затем в такой же последовательности навешиваютс  две остальные панели вновь уста навливаемого комплекта крепи. В выра313After the mass for the width of the support is removed, one of the support panels on the mounting device is caught by the hook 14 of the telescopic boom 13, brought to the place of its installation (hinge) on the last set of supports and connected with it by means of connecting nodes containing plates 8 and 9 and bolts 10. Then, in the same sequence, the other two panels of the newly installed set of supports are hung. In vyra313

бершаюпщми, oпepaци  Q креплени  выработки будут заполнение закрепленного пространства или создание предварительного распора крепи по контуру выработки . Таким образок, .все основные операции по возведению предлагаемой крепи горных выработок механизированы. Дл  завинчивани  болтов.соединительных узлов предусмотрены гайковерты.First, the Q mounting operations will be the filling of the fixed space or the creation of a preliminary expansion of the support along the contour of the mine. Thus, all the basic operations for the construction of the proposed lining of mine workings are mechanized. Wrenches are provided to tighten the bolts.

Крепь работает следующим образом.The support works as follows.

Под действием сил горного давлени  стойки 1 и верхн ки 2 рам крепи перемещаютс  относительно друг друга уменьша  зазоры между торцами. Сила реакции, возникающа  при-этом, т.е. рабочее сопротивление крепи определ етс  величиной сил трени  между панел ми крепи и соединительными узла- ми. Наличие в каждой раме комплектов крепи 8-10 соединительных узлов облегчает получение оптимального сопротивлени  податливой крепи, при котором будет максимальнЪ использоватьс  несуща  способность заложенного в крепи металла. По мере срабатывани  податливости крепи, а следовательно, и уменьшени  ее периметра несуща Under the action of the forces of rock pressure, the pillars 1 and the top 2 of the support frames move relative to each other, reducing the gaps between the ends. The reaction force that occurs with this, i.e. The working resistance of the support is determined by the magnitude of the friction force between the support panels and the joint nodes. The presence in each frame of sets of lining 8-10 connecting units facilitates obtaining optimal resistance to compliant lining, at which the bearing capacity of the metal embedded in the lining will be maximally used. As pliability works, and consequently, its perimeter decreases,

4444

Claims (1)

способность крепи посто нно увеличиваетс . Формула изобретени the lining capacity is constantly increasing. Invention Formula Крепь горных выработок, включающа  рамы, кажда  из которых содержит верхн к и две стойки, выполненные в виде панелей желобчатого профил  с фланцами, соединительные узлы, состо щие из болтов, накладок с резьбовыми отверсти ми дл  установки болтов, отличающа с  тем, что, с целью снижени  трудоемкости, времени монтажа и металлоемкости крепи, днище желобчатого профил  выполнено перфорированным, при этом крепь снабжена межрамньп и соединительными узлами , выполненными в виде болтов, внутренних и наружных накладок с резьбовыми отверсти ми дл  установки болтов , причем фланцы желобчатого профи  и внутренние накладки межрамных соединительных узлов снабжены взаимо- ействуюпщми между собой ребордами, а верхн ки и стойки соседних рам установлены в щахматном пор дке с зазорами между их торцами, причем рама снабжена пластинами, перекрывающими зазор между торцами верхн ков и стоек.The support of mine workings, including frames, each of which contains upper and two racks, made in the form of grooved profile panels with flanges, connecting nodes consisting of bolts, lining with threaded holes for the installation of bolts, characterized in that the purpose of reducing labor intensity, installation time and metal lining, the bottom of the grooved profile is perforated, and the lining is provided with interframes and connecting nodes made in the form of bolts, internal and external lining with threaded holes to install the bolts, the flanges of the grooved pro and the inner linings of the frame-side connecting nodes are equipped with interfacing flanks, and the tops and stands of the adjacent frames are installed in a shakhmatny order with gaps between their ends, and the frame is equipped with plates overlapping the gap between the ends of the upper kov and racks. 1212 Составитель Л, Чистова Редактор М, Циткина Техред А.Кравч:укCompiled by L, Chistova Editor M, Tsitkina Tehred A. Kravch: UK Заказ 2402/29Order 2402/29 Тираж 454ПодписноеCirculation 454Subscribe ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee по делам изобретений и открытий 113035, Москва, Ж-35, Раушска  наб,, д. 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab, 4/5 Производственно-полиграфическое предпри тие, г. Ужгород, ул. Проектна , 4Production and printing company, Uzhgorod, st. Project, 4 Корректор С. ЧерниProofreader S. Cherni
SU854004000A 1985-12-30 1985-12-30 Mine working support SU1317144A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU854004000A SU1317144A1 (en) 1985-12-30 1985-12-30 Mine working support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU854004000A SU1317144A1 (en) 1985-12-30 1985-12-30 Mine working support

Publications (1)

Publication Number Publication Date
SU1317144A1 true SU1317144A1 (en) 1987-06-15

Family

ID=21215049

Family Applications (1)

Application Number Title Priority Date Filing Date
SU854004000A SU1317144A1 (en) 1985-12-30 1985-12-30 Mine working support

Country Status (1)

Country Link
SU (1) SU1317144A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 768995, кл. Е 21 D 11/15, 1978. Авторское свидетельство СССР № 78755, кл. Е 21 D 11/14, 1949. *

Similar Documents

Publication Publication Date Title
CN218439391U (en) Roadway supporting structure
SU1317144A1 (en) Mine working support
CN106837397A (en) A kind of device and method isolated for gob side entry retaining lane side with supporting
US4881853A (en) Support section for mines and tunnels
CN208633159U (en) A kind of underground pipe gallery waterproof structure for deformation seams
RU2172410C2 (en) Powered tunneling and stoping complex (unit)
RU2517339C1 (en) Sinking platform
US3872677A (en) Mineral mining installations
SU1565963A1 (en) Lining for sinking vertical working
SU1055882A1 (en) Brace for mine roof support
RU2085738C1 (en) Method for development of steep coal seams of medium thickness
RU2078931C1 (en) Method of support of mine workings and frame support for its embodiment
SU1023098A1 (en) Apparatus for hydraulic insulation of tubing roof support seams
SU777230A1 (en) Method of securing stope working roof
SU1218034A1 (en) Shiftable sectionated forms
SU1177514A1 (en) Method of erecting a fill-up partition
SU1472683A1 (en) Tunnel lining
SU1043311A1 (en) Method of supporting roof of preparatory workings of underlaying beds of thick coal seams
SU1028851A1 (en) Power roof-supporting unit
RU2082006C1 (en) Trapezoidal frame-type metal support of special cross-section or combination support with roof beam of special cross-section for development workings
RU2064044C1 (en) Method for mining steep medium-thickness coal seams
RU2116453C1 (en) Support for development workings
SU663847A1 (en) Device for mounting beams in development workings
SU1477885A1 (en) Method of reconstructing industrial building by column thinning
SU989074A1 (en) Mine shaft timbering