SU1300129A1 - Forms for concreting foundations under columns - Google Patents

Forms for concreting foundations under columns Download PDF

Info

Publication number
SU1300129A1
SU1300129A1 SU843741790A SU3741790A SU1300129A1 SU 1300129 A1 SU1300129 A1 SU 1300129A1 SU 843741790 A SU843741790 A SU 843741790A SU 3741790 A SU3741790 A SU 3741790A SU 1300129 A1 SU1300129 A1 SU 1300129A1
Authority
SU
USSR - Soviet Union
Prior art keywords
formwork
blocks
block
concreting
flange
Prior art date
Application number
SU843741790A
Other languages
Russian (ru)
Inventor
Алексей Павлович Шиленков
Original Assignee
А.П. Шиленков
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by А.П. Шиленков filed Critical А.П. Шиленков
Priority to SU843741790A priority Critical patent/SU1300129A1/en
Application granted granted Critical
Publication of SU1300129A1 publication Critical patent/SU1300129A1/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Изобретение относитс  к строительству . Цель - повьшение удобства монтажа и демонтажа. Опалубка дл  бетонировани  фундаментов под колонны состоит из опалубочных блоков 1 и 2 и башмачной части подколонника 3. Блоки коаксиально размещены относительно друг друга. Соединение блоков осуществл етс  посредством от- бортовок 4 и 5 и разъемных фиксаторов . Дл  распалубки используетс  рас- палубочное устройство 10, взаимодегг- ствующее с отбортовкой 4. В транспортном положении блоки наход тс  в сложенном состо нии в нижнем блоке 1. 2 3.п. ф-лы. 4 ил. 11 13 (ЛThe invention relates to construction. The goal is to increase ease of assembly and disassembly. The formwork for concreting the foundations for the columns consists of formwork blocks 1 and 2 and the shoe part of the column 3. The blocks are coaxially placed relative to each other. The connection of the blocks is carried out by means of the separators 4 and 5 and detachable clamps. A racking-off device 10 is used for stripping, which is associated with flare 4. In the transport position, the blocks are in the folded state in the lower block 1. 2 3.p. f-ly. 4 il. 11 13 (L

Description

Изобретение относитс  к ству и предназначено дл  использовани  при Возведении фундаментов под колонны.The invention relates to the structure and is intended for use in the construction of foundations for columns.

Целью изобретени  - повышение удобства монтажа и демонтажа опалубки .The aim of the invention is to improve the ease of installation and dismantling of formwork.

На фиг. 1 показана опалубка,общи вид в аксонометрии; на фиг.2 - то же, с пустотообразователем стакана под бетонную колонну; на фиг.З - то же, с кондуктором дп  установки анкерных болтов под стальную колонну на фиг.4 - то же, в транспортном положении . IFIG. 1 shows a formwork, a general perspective view; figure 2 - the same, with the emptying of the glass under the concrete column; fig.Z - the same, with the conductor dp installation of anchor bolts under the steel column in figure 4 - the same, in the transport position. I

Опалубка дл  бетонировани  фундаментов под колонны состоит из опалубочных блоков 1 и 2 башмачной чати и блока 3 подколонника. Количесво блоков может быть увеличено или уменьшено при необходимости. Опалубочные блоки 1-3 размещены коакси- ально один в другом с возможностью вертикального перемещени  и предст л ют из себ  щиты, соединенные в жесткую конструкцию, у которой по крайней мере одна пара-противолежащих боковых граней вьтолнена с от- бортовками. Отбортовка 4 отогнута наружу, а отбортовка 5 отогнута во внутрь блоков. В местах соединени  блоков 1 и 2, а также блоков 2 и 3 отбортовки А и 5 разъемно фиксируютс . Дл  этого на отбортовках 4 иютс  проушины 6, в которых вьтолне ны гнезда под клин 7 и отверсти  8 дл  транспортировани , а в отбортовках 5 выполнены гнезда 9 дл  взаимодействи  с проушинами 6. На отбортовках 5 смонтировано распа- лубочное устройство в виде гайки и упорного винта 10, воздействующего на отбортовку 5, размещенную под отбортовкой 5i Дл  блока 3 подколонника , у которого нет внутриле жащего блока, снизу отбортовки 11 подвижно монтируют пластину 12 или рамку, на которую воздействует распалубочное устройство блока 3. Дл  исключени  разъединени  блоков 1-3 при транспортировании последни снабжены ограничивающим упором 13, который выполн ет функцию ребра жекости .The formwork for concreting the foundations for the columns consists of formwork blocks 1 and 2 of the shoe part and block 3 of the sub-column. The number of blocks can be increased or decreased if necessary. Formwork units 1–3 are placed coaxially one in the other with the possibility of vertical movement and consist of shields connected in a rigid structure, in which at least one pair of opposite side faces is made with separations. The flap 4 is folded outward, and the flange 5 is folded into the inside of the blocks. At the junctions of blocks 1 and 2, as well as blocks 2 and 3, flanges A and 5 are detachably fixed. To do this, the flanges 4 have lugs 6 in which the sockets for the wedge 7 and the transport holes 8 are wired, and the flanges 5 have sockets 9 for engagement with the lugs 6. At the flanges 5, a stripping device is mounted in the form of a nut and a stop screw 10, acting on the flap 5, placed under the flare 5i For the sub-column block 3, which does not have an inner block, from the bottom flange 11, the plate 12 or frame, which is affected by the stripping unit of the block 3, is movable. tim Transport blocks 1-3 to date are provided with a limiting stop 13 which performs the function zhekosti ribs.

Опалубка используетс  следующим образом.The formwork is used as follows.

На место бетонировани  опалубка поступает в транспортном положенииAt the place of concreting, the formwork enters the transport position.

J строителJ builder

( фиг. 4). Блок (Fig. 4). Block

22

3 с помощью грузоподъемного механизма поднимают до тех пор, пока отбортовки 4 блоков 2 и 3 КЗ сомкнутс  с отбортовками 5 блоков 1 и 2, а проушины 6 войдут в гнезда 9. Затем в гнезда проушин 6 ввод т клинь  7 и фиксируют блоки 1-3 от носительно друг друга.. Опалубку устанавливают на место, бетонировани  фундамента, накрыва  ей предварительно собранньй арматурный каркас . Каркас может быть собран отдельно или временно прикреплен к опалубке и подаватьс  на место бетонировани  вместе с опалубкой. В зависимости от типа колонн на опалубку могут крепитс  пустотообразо- ватель 14 или кондуктор 15 извест- - ной конструкции (фиг.2 и 3). Затем производ т заливку бетоном и его уплотнение вибратором. После твер- . дени  бетона опйЬубку снимают. Дл  этого, начина  с нижнего блока 1 башмачной части, выбивают клинь  7 и вращают упорные винты 10, упира сь ими в отбортовку 4 блока 2, отрывают от бетона блок 1. Аналогично производ т отрыв блоков 2 и 3.3, with the help of a lifting mechanism, lift until the flanging 4 blocks 2 and 3 of the short-circuit are closed with flanging 5 blocks 1 and 2, and lugs 6 enter the slots 9. Then a wedge 7 is inserted into the slots of the eyes 6 and fixes 1-3 relative to each other .. Formwork set into place, concreting the foundation, covering it with pre-assembled reinforcement cage. The frame can be assembled separately or temporarily attached to the formwork and fed to the site of concreting together with the formwork. Depending on the type of columns, a hollow core 14 or a jig 15 of known construction may be mounted on the formwork (Figures 2 and 3). The concrete is then cast and compacted with a vibrator. After solid. Deni concrete opyubku removed. To do this, starting from the bottom block 1 of the shoe part, knock out a wedge 7 and rotate the stop screws 10, abutting the flange 4 of the block 2, tear off the block 1 from the concrete. Similarly, blocks 2 and 3 are torn off.

5 ЗО 555 ao 55

Claims (2)

1. Опалубка дл  бетонировани  фун- . даментов под колонны, содержаща  35 соединенные между собой опалубочные блоки башмачной части и подколонника и распалубочное приспособление.1. Formwork for concreting fun. under the columns, containing 35 interconnected formwork blocks of the shoe part and sub-column and a stripping tool. 5 ЗО 555 ao 55 4040 4545 целью повышени  удобства монтажа и демонтажа, опалубочные блоки размещены коаксиально с возможностью взаимного вертикального перемещени  относительно друг друга и соединены между собой посредством вьшолненных на их боковых гран х навстречу друг другу верхней и нижней отбортовок, скрепленных посредством разъемных фиксаторов, причем верхн   отбортовка каждого блока отогнута внутрь 50 блока, а распалубочное приспособление закреплено на верхней отбортов- ке с возможностью взаимодействи  с размещенной под ней отбортовкой вышележаще го блока.in order to improve the ease of installation and dismantling, the formwork blocks are placed coaxially with the possibility of mutual vertical movement relative to each other and are interconnected by means of upper and lower flanges facing each other, fastened on their side edges, fastened by means of detachable clamps, and the upper flange of each block is bent inward 50 blocks, and the stripping fixture is fixed on the upper flange with the possibility of interaction with the flange placed under it above go block. 2. Опалубка по п. 1, отличающа с  тем, что каждый фиксатор выполнен в виде размещенной на нижней отбортовке проушины, рас31300129 42. The formwork according to claim 1, characterized in that each retainer is made in the form of an eye placed on the bottom flange, which is ras31300129 4 положенной в пазу, выполненном в приспособление выполнено в виде за- верхней отбортовке нижележащего блока. крепленной на верхней отбортовке ни3 . Опалубка по п. 1, о т л и ч а- жележащего блока гайки с упорным ю щ а   с   тем, что распалубочноё винтом.placed in a groove, made in the device is made in the form of a flared upper part of the underlying unit. fortified on the upper flanging ni3. The formwork according to claim 1, dt and h is a nut block with a stubborn nut so that the stripping screw is. 5five ГR фиг.гfig.g JJ гО.go иand 6 J36 J3 пP ЛL фиг.FIG. Редактор Т. ПарфеноваEditor T. Parfenova Составитель Н. ЛупарьCompiled by N. Lupar Техред Л. Сердюкова Корректор М. ДемчикTehred L. Serdyukova Proofreader M. Demchik Заказ 1126/31Тираж 666 ПодписноеOrder 1126/31 Circulation 666 Subscription ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee по делам изобретений и открытий 113035, Москва, Ж-35, Раушска  наб., д. 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab., 4/5 Производственно-полиграфическое предпри тие, г. Ужгород, ул. Проектна , 4Production and printing company, Uzhgorod, st. Project, 4 Фиг4Fig4
SU843741790A 1984-05-18 1984-05-18 Forms for concreting foundations under columns SU1300129A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843741790A SU1300129A1 (en) 1984-05-18 1984-05-18 Forms for concreting foundations under columns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843741790A SU1300129A1 (en) 1984-05-18 1984-05-18 Forms for concreting foundations under columns

Publications (1)

Publication Number Publication Date
SU1300129A1 true SU1300129A1 (en) 1987-03-30

Family

ID=21119423

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843741790A SU1300129A1 (en) 1984-05-18 1984-05-18 Forms for concreting foundations under columns

Country Status (1)

Country Link
SU (1) SU1300129A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 393433, кл. Е 04 G 11/20, 1973, Авторское свидетельство СССР № 754027, кл. Е 04 G 13/02, 1978. о *

Similar Documents

Publication Publication Date Title
SU1300129A1 (en) Forms for concreting foundations under columns
US4577727A (en) Scaffold for the construction of round buildings of concrete or the like
LU502156B1 (en) Temporary support test device for erection of large-span box girder
JPH11200320A (en) Execution method of horizontal beam of concrete main tower
US4691485A (en) Apparatus and process for the construction of monolithic ceilings
SU977650A1 (en) Method and device for forming opening in cast-in-place concrete wall erected in slipform
SU489851A1 (en) Formwork for concreting columns
US3779505A (en) Apparatus for simultaneously precasting a plurality of structural members
JPS5914591Y2 (en) Reinforced concrete floor formwork support assembly hardware
SU1361276A2 (en) Shiftable modular forms
SU939694A1 (en) Block-module form
SU1092263A1 (en) Forms for concreting columns
SU838072A1 (en) Jig for erecting lift shafts
SU737595A1 (en) Form for hollow concrete articles
SU1008391A1 (en) Method for erecting building with cantilevered floors
SU1350298A1 (en) Forms for making solid ferroconcrete foundations
SU1606637A2 (en) Solid wall formwork
SU1011833A1 (en) Slide forms for erecting walls
SU1335732A1 (en) Forms for concreting linear ferroconcrete member
SU1011836A1 (en) Forms for concrete walls
SU1661335A1 (en) Method of constructing ferroconcrete vaults on pneumatic formwork
SU1217993A1 (en) Inventory device for fixing beam foundation raft on pile
SU1346745A1 (en) Forms for concreting solid ceilings
SU1090563A1 (en) Installation for making ferroconcrete blocks of span structures of bridges with caisson floor
SU727446A1 (en) Unit for making ferroconcrete blocks of bridge span structures