SU1190129A1 - Method of mounting upright of underwater pipeline within zone of sea stationary platform - Google Patents
Method of mounting upright of underwater pipeline within zone of sea stationary platform Download PDFInfo
- Publication number
- SU1190129A1 SU1190129A1 SU833610030A SU3610030A SU1190129A1 SU 1190129 A1 SU1190129 A1 SU 1190129A1 SU 833610030 A SU833610030 A SU 833610030A SU 3610030 A SU3610030 A SU 3610030A SU 1190129 A1 SU1190129 A1 SU 1190129A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- stationary platform
- platform
- line
- riser
- knee
- Prior art date
Links
Landscapes
- Earth Drilling (AREA)
Abstract
СПОСОБ МОНТАЖА СТОЯКА ПОДВОДНОГО ТРУБОПРОВОДА В ЗОНЕ МОРСКОЙ СТАЦИОНАРНОЙ ПЛАТФОРМЫ , заключающийс в подъеме в надводное положение с упругим изгибом концевого участка подводной трубопроводной линии стационарной платформы, приварке к нему колена, последовательном приращивании труб сто ка к свободному концу колена с одновременным поэтапным спуском трубопроводной линии с коленом и приращенной частью сто ка, отличающийс тем, что, с целью упрощени монтажа сто ка путем исключени ведени сварки его труб в вертикальном положении последних, последовательное приращивание труб сто ка к свободному концу колена ведут на горизонтальной площадке плавсредства, которое располагают от стационарной платформы в плоскости трубопроводной линии на рассто нии , равном удалению в плане конца подн того участка трубопроводной линии от его положени в основании стационарной платформы после спуска линии, при этом в процессе спуска линии с коленом и i приращенной частью сто ка последний упруго изгибают, а после заверщени монта (Л жа сто ка плавсредство сближают со стационарной платформой с одновременным переводом сто ка в вертикальное положение . ;о N9 СОTHE METHOD OF MOUNTING THE UNIT OF THE UNDERWATER PIPELINE IN THE ZONE OF THE MARITIME STATIONARY PLATFORM consists in lifting to the surface position with elastic bending of the end section of the subsea pipeline line of the stationary platform, welding the knee to it, by pushing the flow of the free end of the stationary platform to the surface of the submarine pipe line, to get the 22 and an incremental part of the stand, characterized in that, in order to simplify the installation of the stand by eliminating the welding of its pipes in an upright position the latter, consecutive incrementing of the pipes of the drain to the free end of the knee is carried out on a horizontal platform of the floating device, which is positioned from the stationary platform in the plane of the pipeline line at a distance equal in terms of the end of the raised section of the pipeline line from its position in the base of the stationary platform after the descent , while in the process of descending the line with the knee and the i incremented part of the stack, the latter is elastically bent, and after the installation is completed (the floating equipment pulls together from the stationary hydrochloric platform with simultaneous transfer of the riser into a vertical position. about N9 WITH
Description
Изобретение относитс к строительству и может найти применение при прокладке морских подводных трубопроводов. Целью изобретени вл етс упрощение монтажа сто ка морской стационарной платформы путем исключени ведени сварки его труб в вертикальном положении. На фиг. 1-4 показаны четыре последовательных этапа монтажа сто ка. В соответствии со способом монтажа сто ка подводного трубопровода в зоне морской стационарной платформы сначала к стационарной платформе 1 подвод т оборудованное грузоподъемным механизмом и сварочными постами плавсредство 2, имеющее горизонтальную площадку, причем плавсредство располагают от стационарной платформы 1 в плоскости подводной трубопроводной линии 3 на рассто нии, равном удалению проводной линии 3 на рассто нии, равном удалению в плане конца этой линии в основании платформы от его же положени после подъема к корме плавсредства. На следующем этапе производ т подъем к корме плавсредства. На следующем этапе производ т подъем в надводное положение с упругим изгибом концевого участка трубопроводной линии 3 и в вертикальном положении приваривают к ней колено 4 (фиг. 1). В дальнейшем производ т на сварочных постах горизонтальной площадки плавсредства приращение первых нескольких труб сто ка 5 к свободному концу колена 4 (фиг. 2), а затем приращивание последующих труб совмещают с одновременным поэтапным спуском трубопроводной линии 3 с коленом 4 и приращенной частью сто ка 5, который при спуске упруго изгибают (фиг. 3). После завершени монтажа сто ка 5 плавсредство 2 сближают с платформой 1 с одновременным переводом сто ка в вертикальное положение грузоподъемным механизмом платформы 1 (фиг. 4).The invention relates to the construction and may find application in the construction of offshore subsea pipelines. The aim of the invention is to simplify the installation of the offshore stationary platform by eliminating the welding of its pipes in a vertical position. FIG. Figures 1–4 show four successive stages of installation of the rack. In accordance with the method of mounting the stand of the subsea pipeline in the zone of the offshore fixed platform, first a floating device 2 having a horizontal platform equipped with a lifting mechanism and welding posts is supplied to the stationary platform 1, and the floating device is placed away from the stationary platform 1 in the plane of the underwater pipeline 3 at a distance equal to the distance of the wire line 3 at a distance equal to the distance in terms of the end of this line at the base of the platform from its position after climbing to the stern of the watercraft food At the next stage, the boats are raised to the stern of the boat. At the next stage, lifting to the surface position with elastic bending of the end section of the pipeline line 3 is carried out and knee 4 is welded to it in a vertical position (Fig. 1). In the future, the welding stations of the horizontal platform of the floating unit are made to increment the first few pipes of the stand 5 to the free end of the knee 4 (Fig. 2), and then the increment of the subsequent pipes is combined with the simultaneous gradual descent of the pipeline line 3 with the knee 4 and the incremented part of the stack 5 which, when descending, is elastically bent (Fig. 3). After completion of the installation of the stand 5, the floating unit 2 is brought closer to the platform 1 with simultaneous transfer of the stand to the vertical position by the lifting mechanism of the platform 1 (Fig. 4).
Фиг. гFIG. g
Сриг.ЗSrig.Z
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833610030A SU1190129A1 (en) | 1983-06-02 | 1983-06-02 | Method of mounting upright of underwater pipeline within zone of sea stationary platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833610030A SU1190129A1 (en) | 1983-06-02 | 1983-06-02 | Method of mounting upright of underwater pipeline within zone of sea stationary platform |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1190129A1 true SU1190129A1 (en) | 1985-11-07 |
Family
ID=21070098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833610030A SU1190129A1 (en) | 1983-06-02 | 1983-06-02 | Method of mounting upright of underwater pipeline within zone of sea stationary platform |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1190129A1 (en) |
-
1983
- 1983-06-02 SU SU833610030A patent/SU1190129A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 761779, кл. F 16 L 1/04, 1978. Патент FR № 2033056, кл. F 16 L 1/00, 1977. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2140595C1 (en) | Unit for vertical laying of pipe line in water basin (versions) | |
US4284143A (en) | System for the remote control, the maintenance or the fluid injection for a submerged satellite well head | |
RU2403378C2 (en) | Method for installation of pipeline that connects underwater deposit to platform, from offshore production unit | |
JPS598895A (en) | Pull plug for connecting flexible flowline arranged pipe to treating ship | |
US6210075B1 (en) | Spar system | |
CN1242157C (en) | Universal hanging chair type lifting pipe supporting frame | |
FR2414439A1 (en) | METHOD AND APPARATUS FOR TRANSFERING A FLUID FROM A FIXED POST TO THE BOTTOM OF THE SEA AND BUOY AND VESSEL FOR IMPLEMENTING THE PROCESS | |
GB1517419A (en) | Method and apparatus for connecting submarine pipelines | |
US4271550A (en) | Method for submerging an equipment of negative buoyancy | |
RU2145289C1 (en) | Method and system of mooring tank ship | |
JP2992935B2 (en) | Ship-type floating oil production system | |
AU649444B2 (en) | Method for laying tubular conduits | |
US5865566A (en) | Catenary riser support | |
SU1190129A1 (en) | Method of mounting upright of underwater pipeline within zone of sea stationary platform | |
EP0825325B1 (en) | Catenary riser supports | |
SU646895A3 (en) | Floating platform for conducting underwater work | |
US3702539A (en) | Method and apparatus for installing risers | |
US4239417A (en) | Multi-purpose marine structure | |
SU1756718A1 (en) | Method of laying underwater pipe line | |
WO1995018907A1 (en) | Procedure and device for installing a riser pipe on a submarine buoy | |
RU1810711C (en) | Method of laying underwater pipe line | |
RU2362081C1 (en) | Chain-line pipe-lay from floating system of oil production | |
SU1495557A1 (en) | Method of constructing pipeline section on stationary off-shore platform | |
NO177544B (en) | Method and apparatus for mounting a riser to a submarine buoy | |
JPS6050096A (en) | Long term mooring and crude oil receiving device of tank vessel for oil production and storage on the sea |