SU1176094A1 - Method of traversing zones of elevated rock pressure of entry working - Google Patents
Method of traversing zones of elevated rock pressure of entry working Download PDFInfo
- Publication number
- SU1176094A1 SU1176094A1 SU843710386A SU3710386A SU1176094A1 SU 1176094 A1 SU1176094 A1 SU 1176094A1 SU 843710386 A SU843710386 A SU 843710386A SU 3710386 A SU3710386 A SU 3710386A SU 1176094 A1 SU1176094 A1 SU 1176094A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- pressure
- zone
- preparatory
- increased
- formation
- Prior art date
Links
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
СПОСОБ ПЕРЕХОДА ЗОН ПОВЫШЕННОГО ГОРНОГО ДАВЛЕНИЯ ПОДГОТОВИТЕЛЬНОЙ ВЬЛРАБОТКОЙ, включающий локальную разработку защитного пласта очистным забоем, определение границ у зоны повьшенного горного давлени , отличающийс тем, что, с целью повышени безопасности проведени и поддержани подготовительных выработок в зонах повышенного горного давлени путем последовательной разгрузки пласта от горного давлени , очистной забой разрабатываемого защитного пласта останавливают, производ т локальную выемку пласта в нижней части лавы над подготовительной выработкой до границы зоны повышенного горного давлени , после окончани которой продолжают работн по проведению подготовительной выработки , а после их завершени производ т выемку оставшейс части лавы, при этом забой разрабатываемого защитного пласта останавливают до подхода к границе зоны повышенного горного давлени на рассто ние не менее ширины зоны опорного давлени , а подготовительную выработку провод т за границу створа локальной выемки на рассто ние 0,5 ширины зоны опорного давлени . СО THE METHOD OF TRANSITION OF THE INCREASED MOUNTAIN PRESSURE ZONES OF THE PREPARATORY DEVELOPMENT, which includes the local development of a protective formation by a clearing face, the determination of the boundaries near the zone of the increased mountain pressure, in order to improve the safety of carrying out and maintain preparatory workings in areas of elevated pressure. pressure, the working face of the protective layer being developed is stopped, a local excavation is made in the lower part of the lava above preparatory excavation to the boundary of the zone of increased rock pressure, after which they continue to work on carrying out preparatory excavation, and after their completion, the remaining part of the lava is excavated, while the protective layer being mined is stopped until the elevated rock pressure zone reaches at least the width of the reference pressure zone, and the preparatory development is carried out beyond the boundary of the local excavation section for a distance of 0.5 of the width of the reference pressure zone. WITH
Description
/Х// /// / // // / /// // X // /// / // // / ///
// / ////Х// // // X
Фие,1 Изобретение относитс к горной промышленности и может быть использовано при проведении вьфаботок по выбросоопасным и удароопасным пластам в зонах повьшенного горного давлени . Цель изобретени - повышение без опасности проведени и поддержани подготовительных выработок в зонах повышенного горного давлени путем последовательной разгрузки защищаем го пласта от горного давлени . На фиг. 1 приведен план горных работ до начала осуществлени способа; на фиг. 2 - то же, после осуществлени способа. На фиг. 1 и 2 прин ты следующие обозначени : 1 - подготовительна выработка, проводима по нижнему пласту, 2 - очистной забой на вьшележащем пласте, 3 - подготовительны выработки на вьшележащем пласте. 42 4 - граница зоны вли ни повьпаенного горнога давлени , 5 - зона локальной выемки в нижней части лавы вьппележащего пласта, 6 - зона выработки лавы вышеледащего пласта. Способ осуществл етс следующим образом. По выбросоопасному пласту провод т подготовительную выработку 1 в защищенной зоне от очистного забо 2 вьппележащего пласта. При проведении выработок 3 вы вл ют нарушени пласта и границу 4 зоны его вли ни . До подхода к границе 4 на рассто ние не менее ширины зоны опорного давлени очистной забой 2 оснатавливают и производ т локальнзто выемку нижней части лавы 5 до границы 4. Затем провод т подготовительную выработку 1 за зону границ 4 на рассто нии половины ширины зоны опорного давлени .Phie, 1 The invention relates to the mining industry and can be used when carrying out workings on outburst and impact formations in areas of increased rock pressure. The purpose of the invention is to increase without danger of conducting and maintaining preparatory workings in areas of elevated rock pressure by successive unloading of the protective formation from rock pressure. FIG. 1 shows a mining plan prior to the start of the method; in fig. 2 is the same after performing the method. FIG. 1 and 2, the following designations are accepted: 1 — preparatory development, carried out along the lower formation, 2 — clearing face at the overburden, 3 — preparatory excavations at the overburden. 42 4 is the boundary of the zone of influence of the oppressed pressure generator, 5 is the zone of local excavation in the lower part of the lava of the adjacent bed, 6 is the zone of generation of the lava of the outgoing bed. The method is carried out as follows. For outburst formation, preparatory development 1 is carried out in a protected zone from the clearing hole 2 of the trans-peaking formation. When the excavations 3 are carried out, disturbances of the reservoir and the boundary 4 of the zone of its influence are revealed. Before approaching the boundary 4 at a distance not less than the width of the reference pressure zone, the cleaning face 2 is installed and the lower part of the lava 5 is locally retracted to the boundary 4. Then, preparatory development 1 is made for the boundary zone 4 at a distance of half the width of the reference pressure zone.
у у у y y y
X XX x
у///у х/X у//y /// y x / x y //
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843710386A SU1176094A1 (en) | 1984-03-12 | 1984-03-12 | Method of traversing zones of elevated rock pressure of entry working |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843710386A SU1176094A1 (en) | 1984-03-12 | 1984-03-12 | Method of traversing zones of elevated rock pressure of entry working |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1176094A1 true SU1176094A1 (en) | 1985-08-30 |
Family
ID=21107213
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843710386A SU1176094A1 (en) | 1984-03-12 | 1984-03-12 | Method of traversing zones of elevated rock pressure of entry working |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1176094A1 (en) |
-
1984
- 1984-03-12 SU SU843710386A patent/SU1176094A1/en active
Non-Patent Citations (1)
Title |
---|
Инструкци по безопасному ведению горных работ на пластах, склонных к внезапньм выбросам угл , породы и газа. М., Недра, 1977, с. 45-46. Николин В.И., Балинченко С.И., Симонов Н.А. Борьба с выбросами угл и газа в шахтах. М., Недра, 1981, с. 175-185. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1176094A1 (en) | Method of traversing zones of elevated rock pressure of entry working | |
GB1298590A (en) | Method of, and apparatus for, extending gate roadways to advancing faces in underground mines | |
SU1705576A1 (en) | Method of protection of mine vertical shafts | |
SU1177485A1 (en) | Method of mining thick coal beds | |
SU1627699A1 (en) | Method of mining adjoining outburst-prone seams at borders of mine sections or safety coal pillars | |
RU2103514C1 (en) | Method for supporting mine working in development of seamed deposits | |
RU2107818C1 (en) | Method for development of flat and inclined seams of minerals | |
SU1756585A1 (en) | Method for mining gassy and outburst-prone strata | |
SU643644A1 (en) | Method of mining thick steep coal seams | |
SU1114799A1 (en) | Method for working single burst-hazardous coal seams | |
SU703662A2 (en) | Method of preparing ore deposits to stoping | |
SU125787A1 (en) | Method for developing thin and low-powered steeply dipping seams | |
SU914773A1 (en) | Method of filling an excavated space | |
SU905496A2 (en) | Method of protecting development working | |
SU1191582A1 (en) | Method of solid roof composition | |
SU1209894A1 (en) | Method of preventing spontaneous outbursts in elevated rock pressure zones | |
SU899953A1 (en) | Method of mining thick sloping coal beds in horizontal layers | |
SU1649096A1 (en) | Method of recovery of safety pillar under a hole | |
SU768982A1 (en) | Method of working thick coal seams | |
SU1051284A1 (en) | Method of protecting blowout-hazardous seams against gas-dynamic manifestations | |
SU1209870A1 (en) | Method of safeguarding side drifts of longwalls | |
SU1624159A1 (en) | Method of mining bed deposits | |
SU1578335A1 (en) | Method of mining seams of useful mineral with poorly caving roof | |
SU898070A1 (en) | Method of working sloping mineral beds | |
SU1155774A1 (en) | Method of traversing with bed-following workings the zones of increased rock pressure formed by pillars of coal and marginal parts of adjoining beds |