SU1105593A1 - Rig for rotary drilling with reflushing - Google Patents
Rig for rotary drilling with reflushing Download PDFInfo
- Publication number
- SU1105593A1 SU1105593A1 SU833399158A SU3399158A SU1105593A1 SU 1105593 A1 SU1105593 A1 SU 1105593A1 SU 833399158 A SU833399158 A SU 833399158A SU 3399158 A SU3399158 A SU 3399158A SU 1105593 A1 SU1105593 A1 SU 1105593A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- pipe
- rotor
- swivel
- slurry
- installation
- Prior art date
Links
Landscapes
- Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
- Paper (AREA)
- Manufacturing Of Electric Cables (AREA)
- Earth Drilling (AREA)
Abstract
1. БУРОВАЯ УСТАНОВКА ДЛЯ ВРАЩАТЕЛЬНОГО БУРЕНИЯ С ОБРАТНОЙ ПРОМЫВКОЙ , включающа ротор, соединенную с бурильной колонной ведущую трубу , распределительный и пульпопроводный вертлюги с приемным патрубком, отличающа с тем, что, с целью снижени энергозатарт на подъем пульпы, ведуща труба снабжена внутренней телескопической колонной труб, узлом горизонтального наращивани , выполнена с продольным окном и установлена с возможностью осевого перемещени в пульпопроводном вертлюге, приемный патрубок которого размещен в проеме окна ведущеЛ трубы и жестко св зан с телескопической колонной труб. 2.Установка по п. 1, отличающа с тем, что ротор снабжен узлом фиксации пульпопроводного вертлюга, выполненным в виде подпружиненных упоров. 3.Установка по п. 1, о т л и чающанс тем, что приемный лоток жестко св зан с ротором. (Л 4.Установка по п. 1, отличающа с тем, что узел горизонтального наращивани выполнен в виде шарнирно св занных труб с механизмом фиксации положени шарнира.1. BORING INSTALLATION FOR ROTATING DRILLING WITH REVERSE RINSING, including a rotor connected to the drill string leading pipe, distribution and slurry swivels with a suction nozzle, characterized in that, in order to reduce energy output on the slurry lift, the leading pipe is provided with an internal telescope body telescope. , horizontal extension unit, made with a longitudinal window and installed with the possibility of axial movement in the slider of the swivel, the receiving pipe of which is located in the window opening gorge tubes and rigidly connected to the telescopic column pipe. 2. The installation according to claim 1, wherein the rotor is provided with a fixing unit for the swiveling swivel, made in the form of spring-loaded stops. 3. The installation according to claim 1, about 1 t and chuangts in that the receiving tray is rigidly connected to the rotor. (L4. Installation under item 1, characterized in that the horizontal building assembly is made in the form of pivotally connected pipes with a mechanism for fixing the position of the hinge.
Description
01 СП01 SP
соwith
со Изобретение относитс к буровой технике, а именно к устройствам дл бурени скважин вращательным способом с обратной промывкой. Известна бурова установка дл вр щательного бурени с обратной промы кой, включающа распределительный и пульпопроводный вертлюги с приемным патрубком Ul.. Наиболее близкой к предлагаемой вл етс бурова установка дл вра щательного бурени с обратной промывкой , включающа ротор, соединенн с бурильной колонной ведущую трубу, распределительный и пульпопроводный вертлюги с приемным патрубком С2}. Однако крепление пульпопроводног вертлюга к ведущей трубе в этих установках обуславливает дополнительны затраты энергии на подъем пульпы выше уровн скважины до уровн верт люга. Цель изобретени - снижение энер гозатрат на подъем пульпы. Поставленна цель достигаетс те что в бу ровой установке дл вращательного бурени с обратной промывкой , включающей ротор, соединенную с бурильной колонной ведущую трубу, распределительный и пульпопроводный вертлюги с приемным патрубком, ведуща труба снабжена внутренней те лескопической колонной труб, узлом горизонтального наращивани , выполнена с продольным окном и установле на с возможностью осевого перемещени в пульпопроводном вертлюге, при емный патрубок которого размещ ен в проеме окна ведущей трубы и жестко св зан с телескопической колонной труб. - Ротор снабжен узлом фиксации пуль попроводного вертлюга, выполненным в виде подпружиненных упоров, Приемный лоток жестко св зан с ро тором. Узел горизонтального наращивани выполнен в виде шарнирно св занных труб с механизмом фиксации положени щарнира. i На фиг. 1 показана установка с po торным вращателем в начале бурени на ход ведущей трубы, общий вид; на фиг. 2 - то же, в конце хода ведущей трубы; на фиг. 3 - пульпопроводный вертлюг, разрез; на фиг. 4 - размеще ние эжекторов; на фиг. 5 - узел горизонтального наращивани ; на фиг.б ведуща труба с телескопической колонной; на фиг. 7 - сечение на фиг. 6; на фиг. 8 - установки с подвижным вращателем, общий вид; на фиг. 9 - узел фиксации пульпопроводнего вертлюга применительно к устано ке с подвижным вращателем. Бурова установка включает ротор 1, ведущую трубу 2, узел 3 горизонтального наращивани , породоразрушающий инструмент 4, распределительный 5 и пульпопроводный 6 вертлюги. Система эрлифта включает смесительную камеру, выполненную в виде кольцевого эжектора 7, Всасывающа система включает водоструйный насос, выполненный в виде кольцевого эжектора 8. К эжекторам 7 и 8 подсоединены трубки 9 и 10. В ведущей трубе 2 выполнено продольное окно 11 на высоту хода (несколько большую длины бурильной трубы), Пульпопроводный вертлюг б снабжен приемным патрубком 12, имеющим форму угольника, размещенного в проеме окна 11 и жестко св занного с телеско- пической колонной 13 труб, а именно с трубой 14. Узел 3 горизонтальногонаращивани состоит из двух труб 15 и 16, соединенных с помощью шарнира 17. Внутри трубы 16 размещен подпружиненный цилиндрический замок 18. перекрывающий во врем бурени пульпопровод в месте установки щарнира. В трубах 15 и 16 имеютс уплотнительные кольца. Цилиндрический замок 18 размыкаетс с помощью руко ток 19. Подача сжатого воздуха и промывочной жидкости чере устройство горизонтального наращива-. ни производитс и помощью гибких трубок 20 от бурового насоса и компрессора . Телескопическа колонна 13 труб включает три трубы, снабженные уплотнительными элементами и упорами 21. Наружна труба телескопа 13 жестко закреплена с замком 22 ведущей трубы 2. Крут щий момент от ротора 1 ведущей трубе 2 передаетс вкладышами 23. Внутри ведущей трубы 2 размещены трубки 24 и 25 дл подачи промывочной жидкости и сжатого воздуха. Распределительный вертлюг 5 имеет две полости дл подачи сжатого воздуха от компрессора и промывочной жидкости от бурового насоса через впускные патрубки 26 и 27. Шпиндель 28 вертлюга 5 снабжен Серьгой дл подвешивани к крон-блоку установки при роторном вращателе или дл соединени со шпинделем подвижного вращател . Ротор 1 снабжен узлом 29 фиксации пульпопроводного вертлюга 6 над ротором в процессе бурени . Устройство 29 дл фиксации включает подпружиненные упоры 30. К ротору 1 закреплен приемный лоток 31, который имеет коническую входную часть и снабжен уплотнительным элементом 32. Пульпопроводный вертлюг 6 снабжен выбросной трубой .33 и направл ющим кольцом 34. В варианте с подвижным вращателем 35 установка имеет кондуктор 36, кThe invention relates to a drilling technique, namely, devices for drilling wells in a rotational manner with backwashing. The known drilling rig for reverse-flush rotary drilling, including distribution and slurry swivels with an Ul. Suction inlet. Closest to the proposed is a drilling rig for back-flushing rotary drilling, including a rotor, a connecting pipe connected to the drill string, and and pulprovodny swivels with a suction inlet C2}. However, fastening the slurry pipeline to the drive pipe in these installations necessitates additional energy costs for raising the slurry above the well level to the level of the vertical flow. The purpose of the invention is to reduce energy consumption for pulp raising. The goal is achieved by the fact that in a drilling rig for rotary drilling with backwash, including a rotor, a driving tube connected to a drill string, distribution and slurry swivels with a receiving branch pipe, the drive tube is provided with an internal telescopic tube column, a horizontal extension unit, with a longitudinal by a window and mounted on it with the possibility of axial movement in a slush-pipe swivel, the receiving branch pipe of which is placed in the opening of the leading pipe window and rigidly connected to the body opicheskoy pipe string. - The rotor is equipped with a fixing unit for a bullet swivel, made in the form of spring-loaded stops, the receiving tray is rigidly connected to the rotor. The horizontal extension unit is made in the form of pivotally connected pipes with a mechanism for fixing the position of the hinge. i FIG. 1 shows an installation with a rotating rotator at the beginning of drilling on the lead pipe stroke, general view; in fig. 2 - the same, at the end of the lead pipe stroke; in fig. 3 - slurry swivel, incision; in fig. 4 - location of ejectors; in fig. 5 - horizontal extension unit; on figb leading pipe with a telescopic column; in fig. 7 is a sectional view in FIG. 6; in fig. 8 - units with a movable rotator, general view; in fig. 9 - fixation unit of the swiveling swivel as applied to the installation with a movable rotator. The drilling installation includes a rotor 1, a driving pipe 2, a horizontal extension unit 3, a rock destructive tool 4, a distributor 5 and a slurry 6 swivels. The airlift system includes a mixing chamber made in the form of an annular ejector 7. The suction system includes a water jet pump made in the form of an annular ejector 8. Tubes 9 and 10 are connected to the ejectors 7 and 8. A leading window 11 is made to the ejector tube 2 (several a longer length of the drill pipe). The pulping swivel b is equipped with a receiving pipe 12, having the form of a square placed in the opening of the window 11 and rigidly connected to the telescopic column 13 of the pipe, namely the pipe 14. The node 3 is horizontal audio consists of two pipes 15 and 16 connected by a hinge 17. Within the tube 16 is placed a spring loaded cylinder lock 18 overlapping during drilling slurry pipeline in place scharnira installation. The pipes 15 and 16 have sealing rings. The cylindrical lock 18 is opened using the handles 19. The compressed air supply and the flushing fluid through the device are horizontally expanded. It is also produced by flexible tubing 20 from the mud pump and compressor. The telescopic string 13 of the tube includes three tubes, provided with sealing elements and stops 21. The outer tube of the telescope 13 is rigidly fixed with the lock 22 of the lead tube 2. The torque from the rotor 1 of the lead tube 2 is transmitted by inserts 23. Inside the lead tube 2 tubes 24 and 25 are placed for supplying washing fluid and compressed air. The distribution swivel 5 has two cavities for supplying compressed air from the compressor and flushing fluid from the mud pump through the inlets 26 and 27. The spindle 28 of the swivel 5 is equipped with a yoke for hanging to the crown unit of the unit with a rotary rotator or for connecting to the spindle of the movable rotator. The rotor 1 is provided with a fixture assembly 29 of the swiveling swivel 6 above the rotor during drilling. The fixing device 29 includes spring-loaded lugs 30. A receiving tray 31 is fixed to the rotor 1, which has a conical inlet part and is equipped with a sealing element 32. Cylindrical swivel 6 is equipped with an exhaust pipe .33 and a guide ring 34. In the version with movable rotator 35, the installation has jig 36 to
которому закреплен узел 29 фиксации пульпопроводного вертлюга. Ведуща труба 2 св зана с колонной бурильных труб через узел 3 горизонтального наращивани .which is fixed node 29 fixing slurry swivel. The drive pipe 2 is connected to the drill string through the horizontal extension unit 3.
Установка работает следующим образом .The installation works as follows.
К ведущей трубе 2, снабженной вертлюгами 5 и б, крепитс породоразрушающий инструмент 4, а под вертлюгом 6 креп тс вкладыши 23, затем ведуща труба 2 и вкладыши 23 ввод тс в ротор , вертлюг 6 фиксируетс с помощью устройств 29, выбросна труба 33 вводитс в приемный лоток 31 и герметизируетс за счет уплотнительного элемента 32.The rock-breaking tool 4 is fastened to the leading pipe 2 provided with swivels 5 and b, and the bushings 23 are fastened under the swivel 6, then the lead pipe 2 and the bushings 23 are inserted into the rotor, the swivel 6 is fixed by means of devices 29, the exhaust pipe 33 is inserted into receiving tray 31 and sealed by sealing element 32.
Начинают процесс бурени включение двух систем циркул ции. При этом промывочна жидкость от бурового насоса подаетс через патрубок 26 по подвод щей трубке 10 в эжектор 8, а сжатый воздух от компрессора через патрубок 27 и трубку 9 - в эжектор 7. Во врем бурени вертлюг 6 находитс над ротором 1, а породоразрушающий инструмент совместно с ведущей трубой 2 .опускаетс в скважину по мере углублени , при этом происходит удлинение (раскрытие) телескопической колонны 13 труб. Пульпа с забо поднимаетс вовнутрь телескопической колонны 13 и через патрубок 12 подаетс в вертлюг б, из него по выбросной трубе 33 в лоток 31, а через лоток 31 в отстойник.The drilling process starts the inclusion of two circulation systems. At the same time, the flushing fluid from the drilling pump is supplied through the pipe 26 through the supply pipe 10 to the ejector 8, and the compressed air from the compressor through the pipe 27 and the pipe 9 to the ejector 7. During drilling, the swivel 6 is above the rotor 1, and the rock-destroying tool together with the leading pipe 2. is released into the well as it deepens, and the telescopic string 13 of the pipe is lengthened (opened). The pulp with the bottom rises inward of the telescopic column 13 and through the nozzle 12 is fed into the swivel b, from it through the discharge pipe 33 into the tray 31, and through the tray 31 into the sump.
После бурени на ход ведущей трубы 2 (фиг, 7) производ т извлечение ее из ротора 1 (или кондуктора 36), вьадвин.ув фиксирующие подпружиненные упоры 30, поднимают пульпопроводный вертлюг б над ротором 1. Открепл ют породоразрушающий инструмент и устанавливают его над ротором или кондуктором 36 на подкладной вилке,After drilling the lead pipe 2 (FIG. 7), it is removed from the rotor 1 (or conductor 36), fixed to the fixed spring-loaded stops 30, raise the swivel bar above the rotor 1. Undo the rock cutter and place it over the rotor or by a conductor 36 on a base plug,
К имеющейс части ведущей трубы . креп т узел 3 дл горизонтального наращивани (если оно не закреплено заранее), вывод т цилиндрический замок 18 из трубы 16 и поворачивают трубу 15 вокруг шарниров 17 на 7080° . К трубе 15 креп т первую бурильную трубу (не указана) и ведущую трубу 2 совместно с пульпопроводным вертлюгом 6 и устройством 3 дл горизонтального наращивани и присоединенной бурильной трубой поднимают над роторным столом, при этом устройство дл горизонтального нар ищванид устанавливаетс в вертикальное положение , цилиндрический замок 18 под действием пружины перемещаетс в верхнее положение и -замыкает трубу 16 . После этого присоедин етс нижний конец бурильной трубы к породоразрушающему инструменту 4, убирают покладную вилку и бур т на ход ведущей трубы. После бурени наращивают последующую бурильную трубу уже к первой и т.д.To the existing part of the lead pipe. secure the assembly 3 for horizontal extension (if it is not secured in advance), remove the cylindrical lock 18 from the pipe 16 and rotate the pipe 15 around the hinges 17 by 7080 °. A first drill pipe (not indicated) is fastened to the pipe 15 and the driving pipe 2 together with the slider and swivel 6 and the device 3 for horizontal extension and the connected drill pipe are lifted above the rotor table, the device for horizontal loading is set in a vertical position, a cylindrical lock 18 is moved to the upper position by the action of a spring and closes the pipe 16. Thereafter, the lower end of the drill pipe is attached to the rock-cutting tool 4, the cover fork is removed and the driving pipe is drilled. After drilling, the subsequent drill pipe is increased by the first, etc.
Нижнее расположение пульпопроводного вертлюга позвол ет снизить энергозатраты на подъем пульпы.The lower location of the slurry swivel allows for a reduction in the energy consumption for raising the pulp.
фуг4fug4
фие.5FI.5
////
срие.бsreeb
4four
сриг.7seg.7
Claims (4)
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833399158A SU1105593A1 (en) | 1982-02-22 | 1982-02-22 | Rig for rotary drilling with reflushing |
AU11224/83A AU553268B2 (en) | 1982-02-22 | 1983-02-08 | Drilling fluid circulation |
FR8302246A FR2522058B1 (en) | 1982-02-22 | 1983-02-11 | ROTATION DRILLING MACHINE WITH REVERSE CIRCULATION, INCLUDING, NEAR THE DRILLING MOUTH, A DEVICE FOR DISCHARGING DRILLING DEBRIS |
DE3305936A DE3305936C2 (en) | 1982-02-22 | 1983-02-21 | Rotary drilling rig |
DE3347823A DE3347823C1 (en) | 1982-02-22 | 1983-02-21 | Rotary-drilling rig |
JP2709183A JPS58176391A (en) | 1982-02-22 | 1983-02-22 | Drilling apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833399158A SU1105593A1 (en) | 1982-02-22 | 1982-02-22 | Rig for rotary drilling with reflushing |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1105593A1 true SU1105593A1 (en) | 1984-07-30 |
Family
ID=20998268
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833399158A SU1105593A1 (en) | 1982-02-22 | 1982-02-22 | Rig for rotary drilling with reflushing |
Country Status (2)
Country | Link |
---|---|
JP (1) | JPS58176391A (en) |
SU (1) | SU1105593A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2612402C2 (en) * | 2015-06-02 | 2017-03-09 | Закрытое акционерное общество "НТ КУРС" | Side port of continuous flushing |
-
1982
- 1982-02-22 SU SU833399158A patent/SU1105593A1/en active
-
1983
- 1983-02-22 JP JP2709183A patent/JPS58176391A/en active Pending
Non-Patent Citations (1)
Title |
---|
1. Авторское свидетельство СССР по за вке № 2886825/03, ,кл. Е 21 В 19/00, 1980. 2. Патент US 2849213, кл.,. 175-213, опублик 1958 (прототип) . * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2612402C2 (en) * | 2015-06-02 | 2017-03-09 | Закрытое акционерное общество "НТ КУРС" | Side port of continuous flushing |
Also Published As
Publication number | Publication date |
---|---|
JPS58176391A (en) | 1983-10-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2148327A (en) | Oil well completion apparatus | |
SU1105593A1 (en) | Rig for rotary drilling with reflushing | |
GB2358208A (en) | Liner setting tool with radial washout ports | |
US2715016A (en) | Hydraulic rotary system of drilling with reverse water circulation | |
SU1204693A1 (en) | Drilling rig for rotary drilling with recirculation flushing | |
US2755861A (en) | Method of and apparatus for sinking gravel filter bed wells | |
SU1113530A1 (en) | Drilling string | |
RU2811358C1 (en) | Method for drilling and repairing wells with low formation pressures and device for its implementation | |
US4117897A (en) | Drill bit | |
RU2164582C2 (en) | Configuration of lower part of drill pipe string to drive inclined or horizontal holes by screw face motor | |
RU2064041C1 (en) | Device for multihole formation exposure by branched well | |
CN216341925U (en) | Novel a drilling auxiliary assembly for hydrogeological environment monitoring | |
SU1469093A1 (en) | Drilling rig for rotary drilling with back-flushing | |
RU1805211C (en) | Gear for construction of water well | |
SU428079A1 (en) | DOUBLE COLUMN SHEET | |
SU1260504A1 (en) | Apparatus for drilling large-diameter boreholes | |
SU1684452A1 (en) | Drilling rig | |
SU977692A1 (en) | Flashing adapter | |
SU1765356A1 (en) | Columnar tool | |
RU1810465C (en) | Downhole drilling tool | |
SU448265A1 (en) | TURBODRILL | |
RU2029869C1 (en) | Device to withdraw material from underground formations through wells | |
SU1668611A1 (en) | Multicone roller cutter drilling bit | |
SU1634778A1 (en) | Bottom preventor | |
RU2113589C1 (en) | Device for disconnection of pipe string |