SU1086105A1 - Method of forming wells - Google Patents

Method of forming wells Download PDF

Info

Publication number
SU1086105A1
SU1086105A1 SU813330153A SU3330153A SU1086105A1 SU 1086105 A1 SU1086105 A1 SU 1086105A1 SU 813330153 A SU813330153 A SU 813330153A SU 3330153 A SU3330153 A SU 3330153A SU 1086105 A1 SU1086105 A1 SU 1086105A1
Authority
SU
USSR - Soviet Union
Prior art keywords
well
forming
pressing
wells
fixing
Prior art date
Application number
SU813330153A
Other languages
Russian (ru)
Inventor
Борис Михайлович Мазо
Валентин Иванович Феклин
Original Assignee
Днепропетровский инженерно-строительный институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Днепропетровский инженерно-строительный институт filed Critical Днепропетровский инженерно-строительный институт
Priority to SU813330153A priority Critical patent/SU1086105A1/en
Priority to AU84707/82A priority patent/AU550190B2/en
Priority to CA000404955A priority patent/CA1173426A/en
Priority to FR8210736A priority patent/FR2513304A1/en
Priority to DE3225808A priority patent/DE3225808C2/en
Priority to US06/402,073 priority patent/US4496011A/en
Priority to IT41629/82A priority patent/IT1192989B/en
Application granted granted Critical
Publication of SU1086105A1 publication Critical patent/SU1086105A1/en

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

СПОСОБ ОБРАЗОВАНИЯ СКВАЖИН, заключающийс  в проходке скважины с подачей закрепл зощего материала. и вдавливании его в окружающий скважину грунт скважинообразующим органом , отлич ающий с   тем, что, с целью повышени  качества закреплени  грунта на дне скважины, после вдавливани  материала скважииообразуюций орган поднимают вверх, дополнитепьио подают в нижнюю часть сквадины закрепл ющий материал и производ т его вдавливание в грунт последующим опусканием скважинообразующего органа. эо :fe :л Фиг.1METHOD OF WELLS FORMATION, which consists in drilling a well with the supply of a fixed material. and pressing it into the wellbore body surrounding the well, which is different in that, in order to improve the quality of soil consolidation at the bottom of the well, after the material is formed, the organ is lifted upwards, the reinforcing material is fed into the lower part of the squadron and pressed into soil subsequent lowering of the well-forming body. eo: fe: l Figure 1

Description

Изобретение относитс  к строительству , в частности к способам образовани  скважин с закрепленными стенками в различных нескальных грунтах, в .том числе слабых и водонасыщенных . Известен способ образовани  скважиц с закреплением стенок закрепл ющим материалом с вдавливанием его в груйт взрыванием зар дов ij . Однако данный способ -можно использовать только в сухих и устой-чивых грантах. Наиболее близким к предлагаемому по технической сущности и достигаемо му результату  вл етс  способ образо вани  скважин, заключающийс  в проходке ствола скважины с подачей закрепл ющего материала и вдавливании его в окружающий скважину грунт сква жинообразующим органом 2. Недостатками известного способа  вл ютс  низкое качество закреплени  грунта, особенно в зоне днища, а также возможность выполнени  скважин сравнительно небольшой глубины, так как в этом случае не предусматривает с  подача закрепл крего материала по мере проходки ствола скважины. Цель изобретени  - повьщгеиие качества закреплени  грунта. Поставленна  цель достигаетс  тем что согласно способу образовани  скважин, заключающемус  в проходке скважины с подачей закрепл ющего материала и вдавливании его в окружающий скважину грунт скважинообразуюдим органом,после вдавливани  материала скважинообразующий орган поднимают вверх, дополнительно подают в нижнюю часть скважины, закрепл ющий материал и производ т его вдавливание в грунт последунрим опусканием скважинообразующего органа. На фиг. 1 изображено, образование скважины на начальном зтапе проходки; на фиг.2 - проходка скважины на конечном зтапе; на фиг.З - подъем скважинообразующего органа перед вто рич ь М вдавливанием нижнего участка 52 скважины; на фиг,4 - вторичное вдавливание нижнего участка; на фиг.5 готова  скважина. Способ осуществл етс  следующим образом. На начальном зтапе проходки ствола скважины путем ввинчивани  в грунт лидерной части 1 скважинообразующего органа на верхнем участке будущей скважины образуют лидерную скважину 3 диаметром,меньшим диаметра основной скважины 4, и глубиной, равной длине лидерной части 1, а затем приступают к проходке скважины 4, которую образуют путем разбуривани  лидерной скважины 3 корпусом 5 бурового снар да 2, ив дальнейшем проходку лидерной скважины 3 и основной 4 осутцествл ют одновременно. При проходке участков, требующих закреплени , в лидерную скважину 3 подаетс  закрепЛ5пощий материал 6, который вдавливаетс  в стенки 7 скважины 4 поверхностью корпуса 5 скважинообразующего органа одновременно с образованием скважины 4, образу  уплотненную зону 8. По окончании проходки ствола скважины поднимают буровой снар д 2 на высоту, не меньшую длины его лидерной части 1, подают закрепл ющий материал 6 в лидерную скважину 3 и затем осуществл ют вторичное вдавливание на нижнем участке скважины,при этом закрепл ющий материал вдавливаетс  в его стенки 9 и на дно 10, чем достигаетс  их закрепление. Применение данного способа позвол ет повысить надежность и эффективность закреплени  скважин, выполн емых в слабых и водонасьш5енных грунтах при горизонте грунтовых вод, лежащем вьапе дна скважины, и в грунтах , подверженных периодическому замачиванию, при этом предотвращаетс  фильтраци  воды в скважину. При использовании скважины дл  набивной сваи за счет дополнительного уплотнеин  груита у дна скважины повышаетс  способность сваи.The invention relates to the construction, in particular, to methods for forming wells with fixed walls in various non-rocky soils, including weak and water-saturated ones. A known method of forming wells with fixing the walls with a fixing material with its pressing into the pile by blasting charges ij. However, this method can only be used in dry and sustainable grants. The closest to the proposed technical essence and the achieved result is a method of forming wells, which consists in drilling a well bore with feeding fixing material and pressing it into the soil surrounding the well with a well-forming body 2. The disadvantages of this method are the low quality of ground fixing especially in the bottom zone, as well as the possibility of performing wells of relatively shallow depth, since in this case it does not provide for the supply of secured crego material as it penetrates borehole. The purpose of the invention is to improve the quality of soil consolidation. This goal is achieved by the fact that according to the method of formation of wells, which involves drilling a well with the supply of fixing material and pressing it into the surrounding well, a well-forming body, after pressing the material, the well-forming body is lifted up, additionally served in the lower part of the well, the fixing material and its pressing into the ground is followed by lowering the well-forming organ. FIG. 1 shows the formation of a well in the initial step of the penetration; figure 2 - the drilling of a well on the final stage; FIG. 3 shows the rise of the well-forming organ in front of the second M by pressing in the lower section 52 of the well; FIG. 4 shows the secondary indentation of the lower portion; Fig.5 ready well. The method is carried out as follows. At the initial drilling stage, the leader part 1 of the well-forming body in the upper part of the future well is screwed into the ground to form a leader well 3 with a diameter smaller than the main well 4 and a length equal to the leader part 1, and then proceed to the well 4, which They are formed by drilling the leader well 3 with the body 5 of the drill bit 2, and subsequently the penetration of the leader well 3 and the main 4 is attenuated simultaneously. When penetrating areas that require fixing, the leaking material 6 is clamped into the leader well 3, which is pressed into the walls 7 of the well 4 by the surface of the body 5 of the well forming organ simultaneously with the formation of the well 4, forming a compacted zone 8. When the well is drilled, the drill bit 2 is raised a height not less than the length of its leader part 1 is fed to the fixing material 6 into the leader well 3 and then a secondary indentation is performed on the lower portion of the well, while the fixing material presses 9 in its wall and to the bottom 10 than their fastening is achieved. The application of this method allows to increase the reliability and efficiency of well casing, performed in weak and water-rich soils at the groundwater level, lying above the bottom of the well, and in soils prone to periodic soaking, while preventing water filtration into the well. When using a well for a ramming pile, the capacity of the pile is increased due to the additional load seals at the bottom of the well.

Фиг. 5FIG. five

Claims (1)

СПОСОБ ОБРАЗОВАНИЯ СКВАЖИН, заключающийся в проходке скважины с подачей закрепляющего материала, и вдавливании его в окружающий скважину грунт скважинообраэующим органом, отлич ающий с я тем, что, с целью повышения качества закрепления грунта на дне скважины, после вдавливания материала скважинообразующий орган поднимают вверх, дополнительно подают в нижнюю часть скважины закрепляющий материал и производят его вдавливание в грунт последующим опусканием скважинообразующего органа.METHOD FOR WELLING OF WELLS, which consists in driving a well with the supply of fixing material, and pressing it into the soil surrounding the well with a bore forming body, characterized in that, in order to improve the quality of fixing the soil at the bottom of the borehole, after the indentation of the material, the bore forming body is raised upwards, additionally the fixing material is fed into the lower part of the well and pressed into the ground by subsequent lowering of the bore-forming organ. 1 108611 10861
SU813330153A 1981-09-22 1981-09-22 Method of forming wells SU1086105A1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
SU813330153A SU1086105A1 (en) 1981-09-22 1981-09-22 Method of forming wells
AU84707/82A AU550190B2 (en) 1981-09-22 1982-06-09 Forming holes in non rock soils
CA000404955A CA1173426A (en) 1981-09-22 1982-06-11 Tool for forming earth holes having fixed walls and method therefor
FR8210736A FR2513304A1 (en) 1981-09-22 1982-06-18 TOOL FOR DRILLING IN THE SOIL OF HOLES WITH REINFORCED WALLS AND METHOD FOR DRILLING SUCH HOLES
DE3225808A DE3225808C2 (en) 1981-09-22 1982-07-09 Tool and method for making a hardened wall borehole
US06/402,073 US4496011A (en) 1981-09-22 1982-07-26 Tool for forming earth holes having fixed walls and method therefor
IT41629/82A IT1192989B (en) 1981-09-22 1982-07-30 TOOL TO CARRY OUT HOLES WITH FIXED WALLS IN THE GROUND AND RELATED PROCEDURE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813330153A SU1086105A1 (en) 1981-09-22 1981-09-22 Method of forming wells

Publications (1)

Publication Number Publication Date
SU1086105A1 true SU1086105A1 (en) 1984-04-15

Family

ID=20973884

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813330153A SU1086105A1 (en) 1981-09-22 1981-09-22 Method of forming wells

Country Status (1)

Country Link
SU (1) SU1086105A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
I. Каммерер Ю.Ю. Расширение скважины взрывом. М., Стройиздат, :1976, с.7-9, рис.2. 2. Авторское свнцетельство СССР 201967, кл. Е 02 D 3/12, 1964 (прототип). 1C ; .. I Г i о tkUi.UU . *

Similar Documents

Publication Publication Date Title
SU1086105A1 (en) Method of forming wells
US4639168A (en) Hollow foundation body and method of making a foundation
Abelev Compacting loess soils in the USSR
JPH0213696A (en) Under-pit hydraulic mining method of mineral resource
RU2091541C1 (en) Method of construction of piles foundation close to existing building
US3423944A (en) Method for forming end bearing concrete piles
US3677113A (en) Method and apparatus for forming a foundation-leg assembly for an offshore platform
JPH0464618A (en) Pit excavation work method
CN113982475B (en) Well construction method for dewatering well
US3395543A (en) Method for driving thin wall pipe piles
JPS638246B2 (en)
SU1139800A1 (en) Method of forming holes in earth
RU2686788C1 (en) Method of piled construction in transient soils under conditions of dense urban building
SU881254A1 (en) Method of erecting cast-in-place pile in bulging soil
SU947292A1 (en) Method of constructing an underwater foundation
SU897942A1 (en) Method of providing counter-filtration screen in incoherent soils
SU638673A1 (en) Method of erecting wall in soil
RU1800036C (en) Method for driving column into ground
RU1788147C (en) Method for preparation of beds
RU2032797C1 (en) Method for making of cast-in-place pile by drilling
SU1678976A1 (en) Method for construction of pile foundation
SU1305255A1 (en) Method of constructing pile foundation
RU2141020C1 (en) Process of deep compaction of soil
SU1278446A1 (en) Method of constructing geotechnological wells
RU1809075C (en) Method for sinking of vertical shafts