SU1051302A1 - Method of plugging rock with non-uniform fissure pattern - Google Patents

Method of plugging rock with non-uniform fissure pattern Download PDF

Info

Publication number
SU1051302A1
SU1051302A1 SU823429683A SU3429683A SU1051302A1 SU 1051302 A1 SU1051302 A1 SU 1051302A1 SU 823429683 A SU823429683 A SU 823429683A SU 3429683 A SU3429683 A SU 3429683A SU 1051302 A1 SU1051302 A1 SU 1051302A1
Authority
SU
USSR - Soviet Union
Prior art keywords
series
wells
drilled
cement
reduce
Prior art date
Application number
SU823429683A
Other languages
Russian (ru)
Inventor
Николай Васильевич Мамонтов
Александр Евгеньевич Колкатин
Виллибальд Захарович Сидоров
Владимир Алексеевич Степанюк
Original Assignee
Криворожский Филиал Всесоюзного Научно-Исследовательского Института Организации И Механизации Шахтного Строительства
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Криворожский Филиал Всесоюзного Научно-Исследовательского Института Организации И Механизации Шахтного Строительства filed Critical Криворожский Филиал Всесоюзного Научно-Исследовательского Института Организации И Механизации Шахтного Строительства
Priority to SU823429683A priority Critical patent/SU1051302A1/en
Application granted granted Critical
Publication of SU1051302A1 publication Critical patent/SU1051302A1/en

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

СПОСОБ ТАМПОНАЖА ГОР ных ПОРОД С НЕодаоРодаой ЩИНОВАТОСТЬЮ, вкгаочающий бурение серии скважин и нагнетание в trax це ментного тампонажного раствора, о т п нчающийс  тем, что,с целью левы шени  эффективности воастоцавпени  пу« тем снижени  воцопроивцае ости аатампо нированных пороц, по окончании тампонажа и схватывани  цементного раствора в промежутках между сква;Ж1П1ам  первой серии бур т аопрлннтепьную сервю сква жин и нагнетают в ник пол м тый раствор цо полнс о насыщени  вмвшаюш х пороц.METHOD OF TAMPING OF MINING ROCKS WITH NON-UNDERSTANDING TONS, in which a series of boreholes are drilled and a cement cement slurry is pumped into the trax, which is due to the fact that, in order to reduce the effectiveness of penetration, the teens will be able to reduce the rate of vegetation, and the teens will be able to reduce the rate of vegetation. the setting of the cement mortar in the gaps between the well; the first series of the first series of drilled apertured servant well and injected into the nickname a clear solution of saturation about the saturation of the porous.

Description

Иэобретенне относитс  к провеценню выработсх в обвоцненньтх горных поро цак с неоанороцной треигиноватостью, а именно к способам их тампонажа с цепью воаспоцавпени . Известен способ тампонажа горных пороц, вкпючающий бурение скважин и нвгнетание в них полимерны к растворов на ocHojse синтетических смоп С. J Оцнако применение полимерных рйст воров цп  тампонажа горных порол с  еоцнороаной трещиноватостью (пород с крупными и тонкими трещинами) экон рмичгк:ки нецелесообразно высокой стоимости синтетических смол ( ЗОО - 7ОО руб. за 1т). Наибопее близким к Лтреалагаемому по технической сущности и достигаемом результату  вл етс  способ тампонажа гррных nopoq с неоанрроцной трешино ватостью, вкпючаюотй бурение серии скважин и нагнетание в них аементного тампонажн( ч раствора 2. Недостаток такого способа заключает с  в том, что важе при цопопнитепьной активизации Цементов i пределом приме1нени  цементаонв,  вл ютс  трещины тог шиной не менее ОД К«м. Напичие же по роц со значительной пористостью ипи весьма тонкой 1| е1цимоватостью, практ чески не поооа|01Ш1хс  пементации, неизбежно прввоцат к цостаточно высоким остаточным притокам, превышающим допустимые нормы. Цепь изобретени  - повышение эффективности воаопоаавпени  путем снижени  водопронипаемости затампонированных пород. Поставленна  цель достигаетс  тем, что согласно способу тампонажа горных пород с неоднородной трещиноватостью, включающему бурение серии скважин и нагнетание в них цементного тампонаж ного раствора, по окончании тампонажа и схватывани  цементного раствора в промежутках между скважинами первой серии бур т дополнительную серию скважин и нагнетают в них полимерный раствор до полного насыщени  вмешаюшик пород. Способ осуществл ют следующим о&разом . Сначапа бур т первую серию скваншн вокруг сооружаемой выработки и нагнетают в них цементный тампонажный раствор, к:1торый проникает в крупные трещины горных пород. После схватывани  цементного раствора в промежутках между скважинами первой серии бур т дополнительную серию скважин и нагнетают в них полимерный раствор, который проникает в мелкие трещины, оставшиес  незатампонированными при цементации , и после отверждени  ликвидирует остаточный водоприток. Бурение скважин из забо , например, вертикального ствола производ т через кондукторы, укрепленные на раме-шаблоне , установленной на бетонной подушке с помощью станков, например типа НКР1ОО МП. Каждую скважину, пробуренную на проектную глубину, промывают водой до полного выноса шлама и определ ют ее удельное водопоглощение, по которому назначают .первоначальную концентрацию цементного раствора. В процессе нагнетани  раствор постепенно сгущают, например, от 1:3 до 1:0,5 (ц : В). Нагнетание производ т по зажимной схеме до тех пор, пока скважина прекратит пот пощение раствора при максимальном давлении 4 МПа. После окончани  цементации и схватывани  раствора в промежутках между скважинами первой серии бур т теми же станками серию дополнительных скважин, в которые нагнетают полимерный раствор, например из мочевиноформ альдегидной смолы (крепитель К и УКС), воды и технической сол ной киопоты . Нагнетание полимерного раствора производ т непрерывно до полного насыщени  пород, о достижении которого суд т по прекращению пег лощени  скважи ной раствора при максимальном давлении 2 МПа выдерживаемом в течение 1О мин. Во избежание вытеснени  раство. ра напорной водой давление не снимают вплоть до момента отверждени  смолы. По данным проходки вертикального ствола с использованием предложенного способа тампонажа водоприток полностью ликвидируетс , в результате чего возрао-тает скорость проходки в 1,5 раза.Ie inobedient to the protsennuyu workings in the military mountainous rocks with neoanorotic treiginovatost, namely, the methods of their tamponage with a chain of vospotsavpeni. There is a method of tamping of rock poros, which includes drilling of wells and injecting polymeric resin in them to solutions on the ochojse of synthetic smop C. J However, the use of polymeric thieves of tamponage of mountainous springs with well fractured (large and thin fractures (eons with large and thin cracks) and eton-e-ae aeon-e-ae-aon – eton – e-mode – e-mode – e-mode – e-mode – gon, ect. synthetic pitches (ZOO - 7OO rub for 1 t). The closest to the technical essence and the achieved result is the method of tamponage of nopoq grunts with neo-arrogant trashiness, including the drilling of a series of wells and the injection of cement cement into them (solution 2), it is the same; i the limit of cement application is the cracks with a tire of at least OD K "m. But the filling of rots with significant porosity is very thin 1 | 1 h, almost not pementation, It is likely to lead to sufficiently high residual inflows exceeding the permissible norms. Invention chain - increasing the efficiency of fuel extraction by reducing the water permeability of plugged rocks. at the end of the cementing and setting of the cement slurry in the intervals between the wells of the first series of drilling an additional series of wells zhin and injected therein, the polymer solution until complete saturation vmeshayushik rocks. The method is carried out as follows. From the beginning, the first series of squalls was drilled around the building to be built, and cement cement slurry was pumped into them, to: The second penetrates into large rock cracks. After the cement mortar sets in between the wells of the first series, an additional series of wells is drilled and polymer solution is injected into them, which penetrates into small cracks left unadjusted during cementation, and after curing, it eliminates residual water inflow. Drilling of wells from, for example, a vertical wellbore is carried out through conductors mounted on a template frame mounted on a concrete pad with the help of machines, for example, type NKR1OO MP. Each well drilled to the design depth is washed with water until the sludge is completely removed, and its specific water absorption is determined, by which the initial concentration of the cement slurry is determined. During the injection process, the solution is gradually thickened, for example, from 1: 3 to 1: 0.5 (c: B). The injection is carried out according to a clamping scheme until the well stops sweating the solution at a maximum pressure of 4 MPa. After termination of cementation and setting of the solution in the intervals between the wells of the first series, the same machines drill a series of additional wells into which the polymer solution is injected, for example, from urea-aldehyde resin (fastener K and UKS), water, and technical salt kiosts. The injection of the polymer solution is carried out continuously until the rocks are fully saturated, the achievement of which is judged by the cessation of the pit of the wellbore solution at a maximum pressure of 2 MPa maintained for 1 min. To avoid displacing the solution. Pressure is not relieved by pressurized water until the resin has cured. According to the data of the vertical shaft penetration using the proposed tamponage method, the water inflow is completely eliminated, as a result of which the penetration rate increases 1.5 times.

Claims (1)

СПОСОБ ТАМПОНАЖА ГОРЙ НЫХ ПОРОД С НЕОДНОРОДНОЙ ТРЕ1ДИНОВАТОСТЬЮ| включающий бурение серии скважин и нагнетание в них цементного тампонажного раствора, отличающийся тем, что,с цепью повышения эффективности воцоподавпения путем снижения водопроницаемости затампонированных пород, по окончании тампонажа и схватывания цементного раствора в промежутках между скважинами первой серии бурят дополнительную серию скважин и нагнетают в них полимерный раствор до полного насыщения вмещающих пород.METHOD OF LAMINATION OF BURNS OF NEW BREEDS WITH HETEROGENEOUS TREBINITY | including drilling a series of wells and injecting cement grout in them, characterized in that, with a chain for increasing efficiency of water suppression by reducing the permeability of plugged rocks, at the end of grouting and setting cement slurry in the spaces between the wells of the first series, an additional series of wells are drilled and polymer is injected into them solution until complete saturation of the host rocks. >> ί 1051302 2ί 1051302 2
SU823429683A 1982-04-28 1982-04-28 Method of plugging rock with non-uniform fissure pattern SU1051302A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823429683A SU1051302A1 (en) 1982-04-28 1982-04-28 Method of plugging rock with non-uniform fissure pattern

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823429683A SU1051302A1 (en) 1982-04-28 1982-04-28 Method of plugging rock with non-uniform fissure pattern

Publications (1)

Publication Number Publication Date
SU1051302A1 true SU1051302A1 (en) 1983-10-30

Family

ID=21008907

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823429683A SU1051302A1 (en) 1982-04-28 1982-04-28 Method of plugging rock with non-uniform fissure pattern

Country Status (1)

Country Link
SU (1) SU1051302A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Гончарук П. П. и ар. Прохоцка наклонного ствопа с применением химического способа укреплени пороц.-Шак- ное строительствоД970,№ 3, с. 22-24. .2. Трупак Н. Г. Специальные способы провецени горных выработок, М., еара, 1976,с. 71-9О (прототип). *

Similar Documents

Publication Publication Date Title
CN109026011A (en) Huge thickness rich water Denying Formation dolomite shaft of vertical well water-stop curtain controls grouting process
SU1051302A1 (en) Method of plugging rock with non-uniform fissure pattern
RU2258141C1 (en) Grouting method for water-bearing horizon rock during vertical pit shaft building
RU2299308C2 (en) Water-bearing bed isolation method
US3623554A (en) Method of plugging saline formations
RU2076923C1 (en) Method of formation of flagging screen in water-encroached rocks
SU1206431A1 (en) Method of isolating bottom water in oil well
RU2002109854A (en) The method of sealing pipe and annular space
SU1456585A1 (en) Method of plugging rock with nonuniform jointing
RU2114296C1 (en) Method for treatment of well bottom-hole zone
RU2206731C1 (en) Method of treatment of well bottom-hole zone
RU2484250C1 (en) Method for strengthening of soft fractured modular solid ores
SU727838A1 (en) Well-finishing method
SU757713A1 (en) Method of excavating crumbling rock
RU2334086C1 (en) Method of oil pool development
RU2152507C1 (en) Method of insulating water-development strata
SU1198208A1 (en) Rock-plugging method
SU1458587A1 (en) Method of hydraulic insulation of mine workings of potassium and salt mines
RU2224875C2 (en) Method of limiting water influx into extracting wells
SU447515A1 (en) The way to deal with dust and gas in coal mines
SU1221388A1 (en) Method of hydraulic treatment of producing seam
SU1146457A1 (en) Method of constructing a water-impervious screen about mine workings
SU1481425A1 (en) Method of supporting mine workings
SU1303729A1 (en) Method of interval-wise hydraulic working of producing body
SU1523671A1 (en) Method of plugging saturated rock