SK1392011U1 - Temporary flood barrier - Google Patents
Temporary flood barrier Download PDFInfo
- Publication number
- SK1392011U1 SK1392011U1 SK139-2011U SK1392011U SK1392011U1 SK 1392011 U1 SK1392011 U1 SK 1392011U1 SK 1392011 U SK1392011 U SK 1392011U SK 1392011 U1 SK1392011 U1 SK 1392011U1
- Authority
- SK
- Slovakia
- Prior art keywords
- fixed
- ground
- flood barrier
- metal wedges
- temporary flood
- Prior art date
Links
Landscapes
- Sewage (AREA)
Abstract
Description
Oblasť technikyTechnical field
Technické riešenie sa týka dočasnému zabráneniu preniknutiu vody do ohrozených miest, resp. odkloneniu prívalu vody od ohrozených miest v čase zvýšenej hladiny vodných tokov, keď hrozí ich vyliatie sa z korýt v dôsledku intenzívnych zrážok, resp. iných predpokladaných udalostí (topenie sa snehu, poškodenie hrádzí, odklonenie korýt a pod.), ktoré by relatívne mohli spôsobiť náhly a prudký príval vody do určitých oblastí.The technical solution concerns temporarily preventing the ingress of water into endangered areas, resp. diverting the water flow from the endangered places at the time of the elevated watercourse level, when there is a risk of their spilling out of the troughs due to intense rainfall, resp. other anticipated events (melting snow, dam dams, diversion of troughs, etc.), which could relatively cause sudden and sharp influx of water to certain areas.
Doterajší stav technikyBACKGROUND OF THE INVENTION
Pre ochranu majetku a osôb v obývateľných a iných priemyselných oblastiach sa v súčasnosti ako ochrana pred prívalom vody do týchto oblastí väčšinou používajú umelé hrádze, poskladané z vriec s pieskom, navozenie iného pevného materiálu, zátarasy, vykopanie odtokových kanálov a pod. Toto pomerne zdĺhavé riešenie práve v dôsledku časovej náročnosti je často málo efektívne.For the protection of property and people in habitable and other industrial areas, artificial dams, composed of sand bags, induction of other solid material, roadblocks, excavation of outflow channels, etc. are currently mostly used as protection against the influx of water into these areas. This relatively lengthy solution, due to time-consuming demands, is often inefficient.
Podstata technického riešeniaThe essence of the technical solution
Pevné kovové kazety sa na požadovanom mieste v rade vedľa seba vopred pevne zafixujú kovovými klinmi do zeme. Do jednotlivých kaziet sa zasunú pevné tabule, ktoré sú po bokoch vybavené drážkou slúžiacou na pevné a tesné spojenie tabúl spolu navzájom, Čim vytvoria spolu s kazetou jeden súvislý nepriepustný rad. Dĺžka zábrany je daná počtom kusov takto pospájaných tabúl v závislosti od dĺžky územia, ktoré ohrozuje prívalová voda. Zadné časti tabúl sú vystužené pevnou výstuhou, na ktorej sú upevnené hliníkové vzpery, ktoré je možné odkloniť od zadnej časti tabule a pevne zafixovať kovovými klinmi do zeme. Dĺžku vzpery je možné pred fixáciou regulovať podľa profilu za tabuľou pomocou skrutky v jej spodnej časti vertikálne. Spôsob zostrojenia takejto dočasnej hrádze je rýchly a zároveň veľmi efektívny, s porovnaním s inými spôsobmi ochrany pred prívalovou vodou, ako sú rôzne výkopové práce, stavba pevných hrádzí, prípadne zavážanie daného územia s pieskovými vrecami a pod. Takisto po splnení účelu je možné takto zostrojenú zábranu jednoducho poskladať, uložiť a pripraviť na ďalšie použitie podľa potreby niekde inde.Fixed metal cassettes are fixed to the ground in advance by the metal wedges at the desired location in the row next to each other. Fixed sheets are inserted into the individual cassettes, which are provided on their sides with a groove for the firm and tight connection of the sheets to each other, thereby forming a continuous impermeable row with the cassette. The length of the barrier is given by the number of pieces of boards connected in this way depending on the length of the area, which is endangered by storm water. The rear parts of the panes are reinforced with a rigid reinforcement on which aluminum struts are fixed, which can be tilted from the rear of the pane and fixed with metal wedges to the ground. The length of the strut can be adjusted according to the profile behind the panel by means of a screw in its lower part vertically before fixing. The method of construction of such a temporary dam is fast and at the same time very effective, compared with other ways of protection against the tidal water, such as various excavation works, construction of solid dams, or charging the area with sand bags and the like. Also, once the purpose has been fulfilled, the constructed barrier can be easily folded, stored and ready for further use as needed elsewhere.
ťrehľad obrázkov na výkreseoverview of the drawings
Na výkrese je znázornený v náčrtku jeden diel protipovodňovej ochrany zasunutý v kazete a zafixovaný do zeme.In the drawing, one part of the flood protection is inserted in the cassette and fixed in the ground.
Príklad uskutočneniaExample
Na mieste ohrozenom predpokladaným prívalom zvýšenej hladiny vodného toku sa do terénu vedľa seba, pevne cez kovové kliny 5 zafixuje požadovaný počet pevných kovových kaziet I tak, aby vytvorili súvislý rad. Do jednotlivých kaziet I sa zasunú pevné tabule 2. Čelná časť tabule 2 je orientovaná proti predpokladanému prúdu vodného toku . Po obidvoch bočných stranách je vybavená drážkou 4, ktorá umožňuje tesné pripojenie ďalších častí povodňových zábran vedľa seba. Zadná časť tabule 2 je vystužená pevnou výstuhou 6, na ktorej sú upevnené hliníkové vzpeiy 3, pomocou ktoiých sú jednotlivé tabule 2 pevne zafixované kovovými klinmi 5_do terénu. Dĺžka vzpery 3 je čiastočne regulovateľná podľa profilu terénu v jej spodnej časti pomocou skrutky 7. Takto je možné vo veľmi krátkoip , časovom úseku vytvoriť až niekoľko desiatok metrov dlhú bariéru vysokú približne 80 cni , a spoľahlivo zadržať, prípadne odkloniť náhly príval vody mimo určitého takto ohrozeného i územia.At the location endangered by the expected influx of elevated watercourse, the required number of solid metal cassettes I are fixed to the terrain side by side, firmly over the metal wedges 5, to form a continuous row. The fixed panes 2 are inserted into the individual cassettes 1. The front part of the panes 2 faces the anticipated flow of the watercourse. On both sides it is provided with a groove 4, which allows close connection of other parts of the flood barriers. The rear part of the sheet 2 is reinforced by a rigid reinforcement 6 on which the aluminum supports 3 are fixed, by means of which the individual sheets 2 are fixedly fixed by metal wedges 5 to the ground. The length of the strut 3 is partially adjustable according to the terrain profile at its bottom by means of a screw 7. In this way, it is possible to create a barrier of up to several tens of meters long approximately 80 cni high in a very short period of time and reliably retain or deflect endangered and territory.
Priemyselná využiteľnosťIndustrial usability
Takto zostrojená bariéra umožní dočasne zabrániť zaplaveniu určitých vybraných oblastí, kde by povodňová prívalová vlna mohla spôsobiť značné materiálne škody, resp. ohrozenie životov ľudí alebo zvery. Spôsob spájania a fixácie v rade vedľa seba je pri tomto spôsobe veľmi iýchly a v pomerne krátkej dobe je možné vytvoriť až niekoľko desiatok metrov dlhú bariéru, ktorá umožní bezpečne a spoľahlivo odkloniť tok prívalovej vody mimo vybraného územia, až do výšky rozloženej bariéry, ktorá je cca 80cm vysoká. Jednotlivé časti proti povodňovej bariéry po ukončení povodňového ohrozenia je možné rýchlo poskladať, uložiť a neskôr podľa potreby kdekoľvek opakovane použiť znovu.The barrier constructed in this way will make it possible to temporarily prevent flooding of certain selected areas where the flood storm could cause considerable material damage or damage. endangering people's lives or animals. The method of joining and fixing in a row side by side is very fast in this method and in a relatively short time it is possible to create up to several tens of meters long barrier, which allows safe and reliable diverting of the tidal water flow out of selected area up to 80cm high. Individual parts against the flood barrier after the flood threat can be quickly assembled, stored and later reused anywhere as needed.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SK139-2011U SK6174Y1 (en) | 2011-08-01 | 2011-08-01 | Temporary flood barrier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SK139-2011U SK6174Y1 (en) | 2011-08-01 | 2011-08-01 | Temporary flood barrier |
Publications (2)
Publication Number | Publication Date |
---|---|
SK1392011U1 true SK1392011U1 (en) | 2012-02-03 |
SK6174Y1 SK6174Y1 (en) | 2012-07-03 |
Family
ID=45540618
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SK139-2011U SK6174Y1 (en) | 2011-08-01 | 2011-08-01 | Temporary flood barrier |
Country Status (1)
Country | Link |
---|---|
SK (1) | SK6174Y1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112482303A (en) * | 2018-11-30 | 2021-03-12 | 吴增文 | Hydraulic engineering flood bank |
-
2011
- 2011-08-01 SK SK139-2011U patent/SK6174Y1/en unknown
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112482303A (en) * | 2018-11-30 | 2021-03-12 | 吴增文 | Hydraulic engineering flood bank |
CN112482303B (en) * | 2018-11-30 | 2022-08-16 | 东营市垦利区水利工程公司 | Hydraulic engineering flood bank |
Also Published As
Publication number | Publication date |
---|---|
SK6174Y1 (en) | 2012-07-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2912228B1 (en) | A retention device | |
US9574314B2 (en) | Mobile flood protection barrier system | |
DE102019127941A1 (en) | Mobile flood protection system | |
SK1392011U1 (en) | Temporary flood barrier | |
CN203755250U (en) | Combination dam for flood protection emergency dealing urgent flood retention | |
DE10150902A1 (en) | Mobile flood protection system | |
GB2507265A (en) | A height adjustable flood wall with cover mat | |
DE202009005592U1 (en) | On the bank standing dam-like flood protection system | |
DE102005048304A1 (en) | High water level protection unit has steel support built into ground and protective wall bands of aluminum that can be drawn out and fixed in position and lowered when the waters recede | |
EP1738050B1 (en) | Protective wall in particular high water protective wall | |
DE202008004189U1 (en) | Fast-growing flood protection system | |
CZ113695A3 (en) | Dam system | |
Rappazzo et al. | Effectiveness and applicability of flood barriers for risk mitigation in flash-flood prone Mediterranean area | |
CN103114555B (en) | The flood protection dam that can reuse and skeleton thereof | |
CN220724973U (en) | Impervious flood control dyke for hydraulic engineering | |
PL370573A1 (en) | A system of high-water folding dams | |
HRPK20190648B3 (en) | Artificial mounting dam | |
FR2862322A1 (en) | Sea wall for protecting flood zone, has containers formed of bladder equipped with cap, and membrane providing permeable opening such that construction units are immersed in flood zone | |
Jaeggi | 22 The floods of August 22–23, 2005, in Switzerland: some facts and challenges | |
EP1398418A2 (en) | Device for protection against floods, avalanches, storms, hurricanes and fire | |
DE102006001715A1 (en) | Arrangement for protection of riverside area from flooding, comprises stationary or movable permanently installed barriers | |
CZ34773U1 (en) | Equipment to prevent or divert fish migration in water streams | |
CZ12792U1 (en) | Flood dam | |
Mazumder | Discussion of “River bank protection with porcupine systems: development of rational design methodology” by Mohammad Aamir and Nayan Sharma (2015) | |
AU2017202329A1 (en) | Improvements in Flood Barriers |