Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE10033902Aexternal-prioritypatent/DE10033902C1/en
Application filed by Hydro Aluminium Deutschland GmbhfiledCriticalHydro Aluminium Deutschland Gmbh
Publication of SI1299203T1publicationCriticalpatent/SI1299203T1/en
Casting/low pressure casting comprises pushing together two opening sections of a passage channel directly after casting so that an opening section lying above remains connected to the casting opening