Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jfe Steel CorpfiledCriticalJfe Steel Corp
Priority to SG2012054623ApriorityCriticalpatent/SG196694A1/en
Publication of SG196694A1publicationCriticalpatent/SG196694A1/en
REINFORCEMENT STRUCTURE AND REINFORCEMENT METHOD FOR UNDERWATERSTRUCTURE Aand a reinforcement method for an underwater structure areprovided. In a reinforcement structure (D) of anunnderwater structure, a gap(7) between a steel pipe pile (1) and casing (4) and (5) is filled with agrout material (8) in a. state: where the steel pipe pile (1) is ' into thecasing pipes (4) and (5), thereby joining a horizontal brace member (2) and eninclined brace member (a) to the steel Pipe P Fig. 1
SG2012054623A2012-07-242012-07-24Reinforcement structure and reinforcement method for underwater structure
SG196694A1
(en)