SG183367A1 - A computer implemented method and apparatus for obtaining an optimal project makespan/cost - Google Patents
A computer implemented method and apparatus for obtaining an optimal project makespan/cost Download PDFInfo
- Publication number
- SG183367A1 SG183367A1 SG2012061008A SG2012061008A SG183367A1 SG 183367 A1 SG183367 A1 SG 183367A1 SG 2012061008 A SG2012061008 A SG 2012061008A SG 2012061008 A SG2012061008 A SG 2012061008A SG 183367 A1 SG183367 A1 SG 183367A1
- Authority
- SG
- Singapore
- Prior art keywords
- project
- makespan
- cost
- task
- critical
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract description 107
- 238000005457 optimization Methods 0.000 description 47
- 230000008859 change Effects 0.000 description 46
- 238000012946 outsourcing Methods 0.000 description 33
- 238000012423 maintenance Methods 0.000 description 25
- 230000008439 repair process Effects 0.000 description 22
- 229940022409 overtime Drugs 0.000 description 21
- 238000007726 management method Methods 0.000 description 9
- 238000012805 post-processing Methods 0.000 description 9
- 238000007781 pre-processing Methods 0.000 description 7
- 238000004590 computer program Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 4
- 238000004422 calculation algorithm Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 238000012550 audit Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000003111 delayed effect Effects 0.000 description 2
- 230000001419 dependent effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000013468 resource allocation Methods 0.000 description 2
- 230000009897 systematic effect Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 241000237519 Bivalvia Species 0.000 description 1
- 241001506137 Rapa Species 0.000 description 1
- 235000020639 clam Nutrition 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000010006 flight Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000010200 validation analysis Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Stored Programmes (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SG2012061008A SG183367A1 (en) | 2010-03-15 | 2011-03-11 | A computer implemented method and apparatus for obtaining an optimal project makespan/cost |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SG201001783 | 2010-03-15 | ||
PCT/SG2011/000098 WO2011115575A1 (fr) | 2010-03-15 | 2011-03-11 | Procédé et appareil mis en œuvre par ordinateur pour obtenir une durée de réalisation/un coût de projet optimal(e) |
SG2012061008A SG183367A1 (en) | 2010-03-15 | 2011-03-11 | A computer implemented method and apparatus for obtaining an optimal project makespan/cost |
Publications (1)
Publication Number | Publication Date |
---|---|
SG183367A1 true SG183367A1 (en) | 2012-09-27 |
Family
ID=44649472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SG2012061008A SG183367A1 (en) | 2010-03-15 | 2011-03-11 | A computer implemented method and apparatus for obtaining an optimal project makespan/cost |
Country Status (2)
Country | Link |
---|---|
SG (1) | SG183367A1 (fr) |
WO (1) | WO2011115575A1 (fr) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104503382B (zh) * | 2014-11-20 | 2017-07-25 | 昆明理工大学 | 一种制药化工生产中原料结晶过程的优化调度方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7991633B2 (en) * | 2000-12-12 | 2011-08-02 | On Time Systems, Inc. | System and process for job scheduling to minimize construction costs |
US9082090B2 (en) * | 2007-09-26 | 2015-07-14 | Hewlett-Packard Development Company, L.P. | System, method, and computer program product for resource collaboration optimization |
-
2011
- 2011-03-11 WO PCT/SG2011/000098 patent/WO2011115575A1/fr active Application Filing
- 2011-03-11 SG SG2012061008A patent/SG183367A1/en unknown
Also Published As
Publication number | Publication date |
---|---|
WO2011115575A1 (fr) | 2011-09-22 |
WO2011115575A8 (fr) | 2011-12-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Carvalho et al. | Tactical capacity planning in a real-world ETO industry case: An action research | |
US20170091688A1 (en) | Method and system for maintenance services planning and scheduling optimization | |
Jahr | A hybrid approach to quantitative software project scheduling within agile frameworks | |
WO2012102782A1 (fr) | Procédé et système d'allocation des ressources dans un portefeuille de projets | |
US20120109700A1 (en) | Payroll System Optimization | |
Haugan | Project planning and scheduling | |
Dorion et al. | Innovation and production management through a just in sequence strategy in a multinational brazilian metal-mechanic industry | |
SG183367A1 (en) | A computer implemented method and apparatus for obtaining an optimal project makespan/cost | |
US20230061899A1 (en) | Dynamic allocation of human resources for efficient project management | |
Komoroski et al. | A methodology for improving the shipyard planning process: using KVA analysis, risk simulation and strategic real options/Acquisition Management | |
Safa et al. | Front End Planning Tool (FEPT) based on an electronic process management | |
Hasan et al. | Planning and scheduling bridge girders fabrication through shop-floor operations simulation | |
Villarreal et al. | Workforce management and scheduling under flexible demand | |
Rojas-Delgado et al. | Resource Optimization Model to Increase Efficiency in Aircraft Maintenance Operations, Using Lean Six Sigma and Linear Programming | |
Aguillar et al. | Small Brazilian Business and IT Governance: Viability and Case Study | |
Team | Project Time Management | |
Graue | Prediction and optimization techniques to streamline surgical scheduling | |
Epstein | Project Estimating Process. | |
de Vries et al. | Automated Detail Planning and Control for First-of-Class Projects Using Product-Based-Planning and Yard Specific | |
Dotsenko | Methodological support for formation of resource requirements in multi-project environment | |
Bataineh | Lean Construction and Six Sigma Operations in Construction and Real Estate | |
Aquino Jr | Small Brazilian Business and IT Governance: Viability and Case Study | |
Rad | An Investigation to the Main Components of the Project Study Phase Deliverables and an In-depth Review into the Industry's Schedule Development Practices | |
Li et al. | Capacity Planning and Production Scheduling for Aircraft Painting Operations | |
Tuswan et al. | Acceleration Strategy of Ship Reparation Project Using the Ranked Positions Weight Method: Comparative Evaluation Between Adding Manpower and Work Time |