SG11201600955WA - Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function relative permeability controlled models in reservoir flow simulation - Google Patents
Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function relative permeability controlled models in reservoir flow simulationInfo
- Publication number
- SG11201600955WA SG11201600955WA SG11201600955WA SG11201600955WA SG11201600955WA SG 11201600955W A SG11201600955W A SG 11201600955WA SG 11201600955W A SG11201600955W A SG 11201600955WA SG 11201600955W A SG11201600955W A SG 11201600955WA SG 11201600955W A SG11201600955W A SG 11201600955WA
- Authority
- SG
- Singapore
- Prior art keywords
- simulation
- quasi
- assess
- pseudo
- signal processing
- Prior art date
Links
- 238000004088 simulation Methods 0.000 title 2
- 230000035699 permeability Effects 0.000 title 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/10—Locating fluid leaks, intrusions or movements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/10—Numerical modelling
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Theoretical Computer Science (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Geometry (AREA)
- Evolutionary Computation (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Operations Research (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Geophysics And Detection Of Objects (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2013/059987 WO2015038163A1 (fr) | 2013-09-16 | 2013-09-16 | Simulation de la production de pseudo-phase : approche de traitement de signaux permettant d'évaluer la production d'un quasi-écoulement de phases multiples par le biais de modèles analogues successifs à perméabilité relative en escalier régulée dans la simulation de l'écoulement d'un gisement |
Publications (1)
Publication Number | Publication Date |
---|---|
SG11201600955WA true SG11201600955WA (en) | 2016-04-28 |
Family
ID=52666105
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SG11201600955WA SG11201600955WA (en) | 2013-09-16 | 2013-09-16 | Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function relative permeability controlled models in reservoir flow simulation |
Country Status (10)
Country | Link |
---|---|
US (1) | US10235478B2 (fr) |
CN (1) | CN105706089A (fr) |
AU (1) | AU2013400129B2 (fr) |
CA (1) | CA2921494A1 (fr) |
DE (1) | DE112013007435T5 (fr) |
GB (1) | GB2535648B (fr) |
MX (1) | MX2016001887A (fr) |
RU (1) | RU2016104901A (fr) |
SG (1) | SG11201600955WA (fr) |
WO (1) | WO2015038163A1 (fr) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2535017B (en) | 2013-08-30 | 2020-03-25 | Landmark Graphics Corp | CART-based Flow Simulations for Predicting Changes in Reservoir Properties |
WO2015038162A1 (fr) | 2013-09-16 | 2015-03-19 | Landmark Graphics Corporation | Simulation de production de pseudo-phase: une approche de traitement de signal à l'estimation de production à écoulement quasi-polyphasique par le biais de modèles commandés par la perméabilité relative à fonction échelon analogique en simulation d'écoulement de réservoir de manière à classer de multiples réalisations pétrophysiques |
RU2016105337A (ru) | 2013-09-16 | 2017-08-21 | Лэндмарк Графикс Корпорейшн | Инверсия относительной проницаемости по хронологическим данным добычи с использованием аппроксимаций ступенчатых функций относительной проницаемости при неизменном отношении вязкостей |
GB2546689B (en) | 2014-12-08 | 2020-10-21 | Landmark Graphics Corp | Defining non-linear petrofacies for a reservoir simulaton model |
GB2556731B (en) * | 2015-08-21 | 2021-02-03 | Halliburton Energy Services Inc | Method and apparatus for production logging tool (PLT) results interpretation |
US10792420B2 (en) * | 2017-10-24 | 2020-10-06 | Carefusion 383, Inc. | Occlusion detection for infusion pumps |
WO2020040751A1 (fr) * | 2018-08-21 | 2020-02-27 | Halliburton Energy Services, Inc. | Visualisation et édition d'une représentation d'une surface géologique |
US11613957B1 (en) | 2022-01-28 | 2023-03-28 | Saudi Arabian Oil Company | Method and system for high shut-in pressure wells |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5835883A (en) * | 1997-01-31 | 1998-11-10 | Phillips Petroleum Company | Method for determining distribution of reservoir permeability, porosity and pseudo relative permeability |
FR2886740B1 (fr) * | 2005-06-03 | 2007-09-28 | Inst Francais Du Petrole | Methode pour mettre a jour un modele geologique par des donnees sismiques et de production |
US7716028B2 (en) | 2006-05-24 | 2010-05-11 | Schlumberger Technology Corporation | Method for modeling a reservoir using a 3D wettability map generated from a wettability logging tool |
WO2008028122A2 (fr) * | 2006-09-01 | 2008-03-06 | Chevron U.S.A. Inc. | Procédé de mise en correspondance d'historiques et de quantification d'incertitude assisté par des techniques d'optimisation globale utilisant des proxies |
US8131526B2 (en) * | 2007-04-14 | 2012-03-06 | Schlumberger Technology Corporation | System and method for evaluating petroleum reservoir using forward modeling |
CA2783787A1 (fr) * | 2010-02-12 | 2011-08-18 | Exxonmobil Upstream Research Company | Procede et systeme de creation de modeles de simulation mis en correspondance avec un historique |
FR2982902B1 (fr) * | 2011-11-17 | 2013-11-08 | IFP Energies Nouvelles | Procede pour optimiser l'exploitation d'un milieu souterrain au moyen d'une etude reservoir comportant une mise a l'echelle optimisee |
US10119374B2 (en) * | 2012-03-12 | 2018-11-06 | Total Sa | Method for simulating fluid flows, a computer program and a computer readable medium |
WO2015038162A1 (fr) * | 2013-09-16 | 2015-03-19 | Landmark Graphics Corporation | Simulation de production de pseudo-phase: une approche de traitement de signal à l'estimation de production à écoulement quasi-polyphasique par le biais de modèles commandés par la perméabilité relative à fonction échelon analogique en simulation d'écoulement de réservoir de manière à classer de multiples réalisations pétrophysiques |
US9790770B2 (en) * | 2013-10-30 | 2017-10-17 | The Texas A&M University System | Determining performance data for hydrocarbon reservoirs using diffusive time of flight as the spatial coordinate |
-
2013
- 2013-09-16 DE DE112013007435.4T patent/DE112013007435T5/de not_active Withdrawn
- 2013-09-16 US US14/894,973 patent/US10235478B2/en not_active Expired - Fee Related
- 2013-09-16 RU RU2016104901A patent/RU2016104901A/ru not_active Application Discontinuation
- 2013-09-16 CN CN201380078891.6A patent/CN105706089A/zh active Pending
- 2013-09-16 WO PCT/US2013/059987 patent/WO2015038163A1/fr active Application Filing
- 2013-09-16 MX MX2016001887A patent/MX2016001887A/es unknown
- 2013-09-16 GB GB1602746.8A patent/GB2535648B/en not_active Expired - Fee Related
- 2013-09-16 SG SG11201600955WA patent/SG11201600955WA/en unknown
- 2013-09-16 CA CA2921494A patent/CA2921494A1/fr not_active Abandoned
- 2013-09-16 AU AU2013400129A patent/AU2013400129B2/en not_active Ceased
Also Published As
Publication number | Publication date |
---|---|
DE112013007435T5 (de) | 2016-06-09 |
GB2535648B (en) | 2020-02-19 |
US10235478B2 (en) | 2019-03-19 |
WO2015038163A1 (fr) | 2015-03-19 |
CN105706089A (zh) | 2016-06-22 |
AU2013400129A1 (en) | 2016-03-03 |
US20160179996A1 (en) | 2016-06-23 |
MX2016001887A (es) | 2016-07-26 |
CA2921494A1 (fr) | 2015-03-19 |
AU2013400129B2 (en) | 2017-10-05 |
GB201602746D0 (en) | 2016-03-30 |
GB2535648A (en) | 2016-08-24 |
RU2016104901A (ru) | 2017-10-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SG11201600955WA (en) | Pseudo-phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function relative permeability controlled models in reservoir flow simulation | |
GB2518484B (en) | Non-intrusive data analytics in a process control system | |
GB2586192B (en) | Context sensitive mobile control in a process plant | |
HK1218411A1 (zh) | 模擬香烟 | |
EP2902137A4 (fr) | Procédé de production d'un objet moulé en une forme tridimensionnelle | |
EP2910323A4 (fr) | Procédé de production et dispositif de production pour objet moulé formé de manière tridimensionnelle | |
IL245898B (en) | An improved cartridge for a stereolithography machine, a lithography machine designed to accommodate the improved cartridge and methods of using the improved cartridge | |
EP3007129A4 (fr) | Dispositif de modélisation, dispositif de génération de modèle tridimensionnel, procédé de modélisation, programme, et simulateur d'agencement | |
GB201403251D0 (en) | Collecting and delivering data to a big data machine in a process control system | |
EP3063663A4 (fr) | Assemblage d'un modèle d'application sur un modèle d'infrastructure | |
EP2973258A4 (fr) | Modélisation de processus et interface associée | |
GB2513455B (en) | Generating checklists in a process control environment | |
DE102014012204A8 (de) | Formgebungsanlage zum Erstellen eines Faser-Kunststoff-Verbundes | |
GB2513456B (en) | Mobile analysis of physical phenomena in a process plant | |
EP2946368A4 (fr) | Procédé et agencement permettant la réalisation d'un modèle en 3d | |
SG11201508333RA (en) | Basin-to-reservoir modeling | |
EP2950633A4 (fr) | Procédés pour induire une tolérance à la sécheresse dans des cultures | |
SG11201601104TA (en) | Pseudo phase production simulation: a signal processing approach to assess quasi-multiphase flow production via successive analogous step-function relative permeability controlled models in reservoir flow simulation in order to rank multiple petro-physical realizations | |
GB201315993D0 (en) | Element identification in a structural model | |
EP2705500A4 (fr) | Fusion de modèles tridimensionnels sur la base de scores de confiance | |
HK1218301A1 (zh) | 作為鑒別潛在味覺調節劑的模型的細胞 | |
ZA201602572B (en) | Method for producing a hydrogen-detection sensor and resulting sensor | |
EP3005178A4 (fr) | Modélisation de mélanges sur un modèle solide d'une poche | |
GB2514991B (en) | Improved moisture control in a set of bagpipes | |
SG2013064209A (en) | Creet model |