SG10201704993XA - Roof cistern and method for manufacturing and constructing the same - Google Patents

Roof cistern and method for manufacturing and constructing the same

Info

Publication number
SG10201704993XA
SG10201704993XA SG10201704993XA SG10201704993XA SG10201704993XA SG 10201704993X A SG10201704993X A SG 10201704993XA SG 10201704993X A SG10201704993X A SG 10201704993XA SG 10201704993X A SG10201704993X A SG 10201704993XA SG 10201704993X A SG10201704993X A SG 10201704993XA
Authority
SG
Singapore
Prior art keywords
wall
floor
prefabricated
cistern
roof
Prior art date
Application number
SG10201704993XA
Inventor
Tin Cheung Wong
Wai Man Wong Rosana
Original Assignee
Yau Lee Wah Construction Mat Huizhou Company Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yau Lee Wah Construction Mat Huizhou Company Limited filed Critical Yau Lee Wah Construction Mat Huizhou Company Limited
Publication of SG10201704993XA publication Critical patent/SG10201704993XA/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • E04H7/18Containers for fluids or gases; Supports therefor mainly of concrete, e.g. reinforced concrete, or other stone-like material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

ROOF CISTERN AND METHOD FOR MANUFACTURING AND CONSTRUCTING THE SAME 5 The present invention provides a roof cistern and a method for manufacturing and constructing the roof cistern. The roof cistern includes a floor, a wall and a cover. The floor and the wall are semi-prefabricated members, and include an integral housing consisting of a prefabricated floor and a prefabricated wall, and a cast-in-situ 10 floor and a cast-in-situ wall located inside the housing. The cover is a full-prefabricate member. The prefabricated wall is provided at an inner surface thereof with a fixing device extending inwardly for fixing an inner wall mold. In the method, the floor and the wall are semi-prefabricated while the cover is a full-prefabricated. During construction of the roof, the housing formed by the prefabricated floor and the wall is 15 fixed, the inner wall mold is mounted, concrete ii casted for the wall and the floor, and the inner wall mold is removed after the concrete is set. The cover is placed on the cistern, and after position adjustment thereof, closes the cistern. With the above roof cistern and the above method, the on-site labor cost, pollution and construction period can be reduced. 20 (Fig. 1)
SG10201704993XA 2016-11-17 2017-06-16 Roof cistern and method for manufacturing and constructing the same SG10201704993XA (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611010340.8A CN106639450A (en) 2016-11-17 2016-11-17 Top panel water tank and manufacturing and construction method thereof

Publications (1)

Publication Number Publication Date
SG10201704993XA true SG10201704993XA (en) 2018-06-28

Family

ID=58808975

Family Applications (1)

Application Number Title Priority Date Filing Date
SG10201704993XA SG10201704993XA (en) 2016-11-17 2017-06-16 Roof cistern and method for manufacturing and constructing the same

Country Status (2)

Country Link
CN (1) CN106639450A (en)
SG (1) SG10201704993XA (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592739B (en) * 2022-03-22 2024-04-26 辽宁省城乡市政工程集团有限责任公司 Semi-assembled ultra-deep superposed water storage tank and construction process

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100347395C (en) * 2003-08-27 2007-11-07 杨九龙 Reinforcing steel bar concrete pool construction method and special prefabricated member therefor
CN201933821U (en) * 2010-12-07 2011-08-17 林刚 Prefabricated reinforced concrete assembled and combined type water storage device
CN202000714U (en) * 2011-02-17 2011-10-05 天津永壮水泥制品有限公司 Multipurpose combination prefabricated reinforced concrete sump
CN204418380U (en) * 2014-12-31 2015-06-24 深圳市华阳国际工程设计有限公司 A kind of prefabricated component connector
CN204960022U (en) * 2015-07-23 2016-01-13 南京长江都市建筑设计股份有限公司 Prefabricated exterior wall template structure system with heat preservation function
CN105019558B (en) * 2015-08-02 2018-07-03 长安大学 The Bar Anchorage connection structure of prefabricated assembled concrete component and connection method
CN205243119U (en) * 2015-12-23 2016-05-18 中铁十二局集团第二工程有限公司 Construction is with high mountain cistern that prevents frostbite
CN206360442U (en) * 2016-11-17 2017-07-28 有利华建材(惠州)有限公司 A kind of terrace water vat

Also Published As

Publication number Publication date
CN106639450A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
ZA202100222B (en) Prefabricated wall and assembly structure for prefabricated building, and construction method therefor
MY194010A (en) Prefabricated bathroom and methods for constructing and installing the same
PH12015500710A1 (en) Method for constructing cylindrical tank
WO2011103312A3 (en) Improvements in shower enclosure design and assembly methods using prefabricated shower benches
PH12015500913A1 (en) Method for constructing cylindrical tank
WO2011163096A3 (en) Method and system for installing a drain
EP3707321A4 (en) Precast and prestressed concrete tank with temporary construction opening
MY172102A (en) Semi rigid precast wall system
KR102099933B9 (en) Precast Concrete Modualr Structure And Method for Constructing the Same
IL232751B (en) Prefabricated pool
WO2013040064A3 (en) Device for forming post sleeves, and method of use
GB2578197B (en) Precast building construction system
SG10201704993XA (en) Roof cistern and method for manufacturing and constructing the same
ES2350336B2 (en) MANUFACTURING PROCEDURE OF COMPACT MODULES FOR CONSTRUCTION.
PH12015502385A1 (en) Method for constructing cylindrical tank
GB2573741B (en) A void platform and a method for providing a platform support accross a building void
RU135671U1 (en) REINFORCED CONCRETE WALL-FREE WALL FORMWORK
PH12015502355A1 (en) Method for constructing cylindrical tank
JP2006336285A (en) Waterproof pan for remodeling
JP2011163095A (en) Renovated fence made of aluminum
KR100805967B1 (en) Combination structure of sump
EP3824150C0 (en) System for assembling building blocks in the form of a kit intended for the construction of buildings
RU145678U1 (en) REINFORCED CONCRETE WALL-FREE WALL FORMWORK
KR200233653Y1 (en) structure for mounting a mould
RU178930U1 (en) REINFORCED CONCRETE WALL-FREE WALL FORMWORK