SE545574C2 - Loading Assembly and Method for Preparing Boreholes for a Blasting Operation - Google Patents
Loading Assembly and Method for Preparing Boreholes for a Blasting OperationInfo
- Publication number
- SE545574C2 SE545574C2 SE2030174A SE2030174A SE545574C2 SE 545574 C2 SE545574 C2 SE 545574C2 SE 2030174 A SE2030174 A SE 2030174A SE 2030174 A SE2030174 A SE 2030174A SE 545574 C2 SE545574 C2 SE 545574C2
- Authority
- SE
- Sweden
- Prior art keywords
- loading assembly
- borehole
- slot
- inlet
- inlets
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 49
- 238000005422 blasting Methods 0.000 title claims abstract description 28
- 238000004891 communication Methods 0.000 claims abstract description 29
- 239000002360 explosive Substances 0.000 claims description 91
- 230000000977 initiatory effect Effects 0.000 claims description 54
- 230000009471 action Effects 0.000 claims description 41
- 238000012384 transportation and delivery Methods 0.000 claims description 39
- 238000003384 imaging method Methods 0.000 claims description 19
- 238000004590 computer program Methods 0.000 claims description 17
- 230000000903 blocking effect Effects 0.000 claims description 10
- 238000003860 storage Methods 0.000 claims description 9
- 230000008901 benefit Effects 0.000 description 18
- 238000005065 mining Methods 0.000 description 11
- 238000007600 charging Methods 0.000 description 8
- 239000000463 material Substances 0.000 description 8
- 239000011435 rock Substances 0.000 description 8
- 238000010276 construction Methods 0.000 description 7
- 230000008569 process Effects 0.000 description 5
- 238000005553 drilling Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000005355 Hall effect Effects 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 239000000839 emulsion Substances 0.000 description 2
- 238000010304 firing Methods 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- PAWQVTBBRAZDMG-UHFFFAOYSA-N 2-(3-bromo-2-fluorophenyl)acetic acid Chemical compound OC(=O)CC1=CC=CC(Br)=C1F PAWQVTBBRAZDMG-UHFFFAOYSA-N 0.000 description 1
- 238000005474 detonation Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000013467 fragmentation Methods 0.000 description 1
- 238000006062 fragmentation reaction Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 231100001261 hazardous Toxicity 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000008685 targeting Effects 0.000 description 1
- 231100000331 toxic Toxicity 0.000 description 1
- 230000002588 toxic effect Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
- F42D1/08—Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
- F42D1/08—Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
- F42D1/22—Methods for holding or positioning for blasting cartridges or tamping cartridges
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
- F42D1/08—Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
- F42D1/10—Feeding explosives in granular or slurry form; Feeding explosives by pneumatic or hydraulic pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42B—EXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
- F42B3/00—Blasting cartridges, i.e. case and explosive
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
Abstract
A loading assembly (6) and a method for preparing a borehole for a blasting operation. The loading assembly (6) comprises an outlet (13) adapted for communication with the borehole; one or more inlets (11 , 12), wherein one inlet (12) is in line with the outlet (13), the one or more inlets (11, 12) each is adapted for communication with a guide tube (21) characterized in that the loading assembly (6) further comprises a switch unit (9) comprising a switch means (10) and one or more slots (7, 8), wherein each of the one or more slots (7, 8) is switchable to a first position in line with any of the one or more inlets (11 , 12) or to a second position out of line with any of the one or more inlets (11, 12), and wherein each of the one or more slots (7, 8) has an open end adapted for communication with any of the one or more inlets (11, 12) at the first position. The method comprises the steps of positioning (121) the outlet (13) of the loading assembly (6) in line with the borehole, switching (122) a slot (7, 8) to the first position, and shuttling (125) a device or tool into the slot (7, 8), whereby the device or tool is able to enter the borehole by passing through the slot (7,8)
Description
LOADING ASSE|\/IBLY AND METHOD FOR PREPARING BOREHOLES FOR A BLASTING OPERATION
TECHNICAL FIELD
The present disclosure relates to a loading assembly for preparing boreholes for a blasting operation, and a method thereof. The present disclosure further relates to a
method for controlling operation of the loading assembly.
BACKGROUND
Mining operations and construction work commonly utilize drilling and blasting techniques. During blasting operations, detonation of explosive charges needs to be
precisely controlled for the sake of safety and productivity.
A mining operation requires drilling of a plurality of boreholes into a rock surface. The boreholes extend a proper depth into the rock and are filled with explosive charges. Due to the rough nature of rock the boreholes are usually not uniform, which is challenging for placing the explosive charges into the boreholes. lt is necessary to invest extensive time, manpower and effort for preparing each borehole for a successful blasting operation. Current tools and methods for preparing boreholes need to be improved to reduce manual workload for operators thereby increasing work
efficiency and productivity.
After filling the boreholes with explosive charges, the explosive charges may be detonated with an initiating detonator and an explosive booster at a controlled time and in a controlled sequence for breaking the adjacent rock. The broken rock is then
removed and the newly formed rock surface is reinforced for a new blasting operation.
Mining is an inherently risky occupation. The mining environment is harmful for human health, with dangers ranging from rock collapses to inhalation of toxic particles. lt should always be prioritized to minimize exposure of personnel to the harmful mining
environment.
Telescopic, remote and/or automatic controls of preparing boreholes for a blasting
operation have been applied to tackle the above mentioned problems.
SUMMARY
ln view of the above, a first object of the present disclosure is to provide a loading assembly for preparing a borehole for a blasting operation, which loading assembly comprises an outlet adapted for communication with the borehole; one or more inlets, wherein one inlet is in line with the outlet, the one or more inlets each is adapted for communication with a guide tube. The loading assembly further comprises a switch unit comprising a switch means and one or more slots, wherein each of the one or more slots is switchable to a first position in line with any of the one or more inlets or to a second position out of line with any of the one or more inlets, and wherein each of the one or more slots has an open end adapted for communication with any of the one or
more inlets at the first position.
By providing improved mechanization, the loading assembly according to the present disclosure has the advantage of reducing manual workload for operators thereby
increasing work efficiency and productivity.
By enabling remote and/or automatic controls of preparing a borehole for a blasting operation, the loading assembly according to the present disclosure has the advantage
of reducing or even eliminating exposure of personnel to the harmful work environment.
The loading assembly as was described above may comprise at least two inlets, which has the advantage of shortening queue time at entrance of the loading assembly. lt is
desired that the rig spends as little time as possible on waiting which is non-productive.
The switch unit of the loading assembly as was described above may comprise at least two slots, which has the advantage of streamlining multiple deliveries that arrive at the
loading assembly at different times.
ln some embodiment, the loading assembly as was described above comprises a first inlet configured to receive an initiating device or a packaged explosive product; a second inlet configured to receive an explosive delivery hose, wherein the second inlet is in line with the outlet; and a switch unit comprising a first slot and a second slot. With this specific configuration the loading assembly has the advantage of delivering an initiating device and a packaged or bulk explosive product simultaneously or
sequentially into the borehole.
The first slot of the loading assembly as was described above may have an at least partially closed end configured to block communication with the outlet at the first
position in line with the second inlet, the second slot has an open end adapted forcommunication with the outlet at the first position in line with the second inlet, and wherein the second inlet has a parking space configured to accommodate the initiating device or the packaged explosive product. The at least partially closed end of the first slot provides the advantage of ensuring proper operation of the switch means by retaining the initiating device or the packaged explosive product within the first slot. The parking space enables switching of the first and second slots after the initiating device or the packaged explosive product has been shuttled from the first slot into the parking space, which is required for shuttling the initiating device or the packaged explosive product into the borehole through the second slot with two open ends adapted for
communication with the outlet and the second inlet respectively.
The loading assembly as was described above may further comprise at least one blocking member configured to retain the initiating device or the packaged explosive product within the first slot, wherein the at least one blocking member is arranged at the first inlet. The blocking means provides the advantage of ensuring proper operation of the switch means by retaining the initiating device or the packaged explosive product within the first slot when the first slot is in line with the first inlet. The blocking means further provides the advantage of protecting the initiating device or the packaged
explosive product during switching of the first slot.
ln some embodiments, the guide tube of the loading assembly as was described above may comprise a Y-shaped bifurcation. The Y-shaped bifurcation of guide tube has the
advantage of providing a lean configuration of the loading assembly.
The loading assembly as was described above may further comprise at least one system selected from the group consisting of a mechanical system, a sensing system, an imaging system, a range finding system and a protractor system. Alternatively, the loading assembly as was described above may be connected to at least one system selected from the group consisting of a mechanical system, a sensing system, an imaging system, a range finding system and a protractor system. The mechanical, sensing, imaging, range finding or protractor system enables remote and/or automatic controls of operation of the loading assembly. Therefore, the loading assembly has the advantage of reducing or even eliminating exposure of personnel to the harmful work
environment.
lt is a second object of the present disclosure to provide a rig comprising at least one loading assembly as was described above. The rig has all the advantages that have
been described above in conjunction with the loading assembly.lt is a third object of the present disclosure to provide a method of preparing a borehole for a blasting operation, Which method comprises the steps of positioning the outlet of the loading assembly as was described above in line with the borehole, switching a slot to the first position, and shuttling a device or tool into the slot, Whereby the device or tool is able to enter the borehole by passing through the slot. The method has all the
advantages that have been described above in conjunction with the loading assembly.
lt is a fourth object of the present disclosure to provide a method performed by a control unit or a computer connected to the control unit for controlling operation of the loading assembly as was described above, which method comprises the actions of
obtaining data and controlling operation of the switch unit.
ln some embodiments, the method for controlling operation of the loading assembly as was described above further comprises the action of determining status of the one or
more slots, and/or determining status of the switch means.
ln some embodiments, the method for controlling operation of the loading assembly as was described above further comprises the action of controlling operation of the mechanical system, controlling operation of the sensing system, controlling operation of the imaging system, controlling operation of the range finding system, and/or
controlling operation of the protractor system.
The method performed by a control unit or a computer connected to the control unit for controlling operation of the loading assembly has the advantage of at least partially
automatizing operation of the loading assembly.
lt is a fifth object of the present disclosure to provide a computer program product comprising instructions which, when executed on at least one processor, cause the at least one processor to carry out the method for controlling operation of the loading
assembly as was described above.
According to some embodiments herein there is provided a computer program which comprises program code for causing a control unit or a computer connected to the control unit to carry out the method for controlling operation of the loading assembly as
was described above.
lt is a sixth object of the present disclosure to provide a computer-readable storage medium storing a computer program product comprising instructions which, when executed on at least one processor, cause the at least one processor to carry out the
method for controlling operation of the loading assembly as was described above.According to some embodiments herein there is provided a computer-readable storage medium storing a computer program, wherein said computer program comprises program code for causing a control unit or a computer connected to the control unit to carry out the method for contro||ing operation of the loading assembly as was
described above.
BRIEF DESCRIPTION OF THE DRAWINGS
With reference to the appended drawings, below follows a more detailed description of
embodiments of the disclosure cited as examples.
ln the drawings:
Figure 1 is a schematic representation of a mining or construction work rig;
Figure 2 depicts a mounting device in a perspective view;
Figure 3 depicts a loading assembly in a perspective view;
Figure 4 depicts a loading assembly from a top view;
Figure 5 depicts a loading assembly from a side view;
Figure 6 is a schematic representation of a guide tube with a Y-shaped bifurcation;
Figure 7 depicts the sequence of shuttling an initiating device into a parking space in a
perspective view;
Figure 8 is a block diagram depicting a method of using the loading assembly for
preparing a borehole for a blasting operation;
Figure 9 is a block diagram depicting a method for contro||ing operation of the loading
assembly;
Figure 10 is a block diagram illustrating a control unit and connections with the control
unit.
DETAILED DESCRIPTION
The present disclosure improves mechanization of preparing a borehole for a blasting operation, which cuts down manual workload for operators thereby increasing work
efficiency and productivity. The present disclosure enables remote and/or automaticcontrols of preparing a borehole for a blasting operation thereby reducing or even
eliminating exposure of personnel to the hazardous work environment.
According to a first aspect of the disclosure, there is provided a loading assembly 6 for preparing a borehole for a blasting operation, which loading assembly 6 comprises an outlet 13 adapted for communication with the borehole; one or more inlets 11, 12, wherein one inlet 12 is in line with the outlet 13, the one or more inlets 11, 12 each is adapted for communication with a guide tube 21. The loading assembly 6 further comprises a switch unit 9 comprising a switch means 10 and one or more slots 7, 8, wherein each of the one or more slots 7, 8 is switchable to a first position in line with any of the one or more inlets 11, 12 or to a second position out of line with any of the one or more inlets 11, 12, and wherein each of the one or more slots 7, 8 has an open end adapted for communication with any of the one or more inlets 11, 12 at the first
position.
With “in line” is herein meant essentially concentrically arranged in a straight line, which is opposite to “out of line”. When a slot 7, 8 is at a first position in line with an inlet 11, 12, passage is allowed betvveen the slot 7, 8 and the inlet 11, 12. When a slot 7, 8 is at a second position out of line with an inlet 11, 12, passage is not allowed between the slot 7, 8 and the inlet 11,
The term "slot" refers to a straight and elongated passage, thoroughfare, enclosure, groove or receptacle configured to park a device/tool or a packaged explosive product, and/or allow the same to pass through. Each of the one or more slots 7, 8 has an open end that is adapted for communication with any of the one or more inlets 11, 12 for
receiving the incoming device, tool or packaged explosive product.
The guide tube 21 may be a tube, hose or pipe made of a material which is flexible
enough to bend but still rigid enough to function as a supporting and guiding means.
The loading assembly 6 may be used for coordinating a process of delivering an initiating device 29 to an operative depth inside a borehole and subsequently at least partially filling the borehole with an explosive material. The explosive material may be packaged or bulk explosive products. An initiating device 29 is applied to initiate a blasting operation in a controlled manner. The initiating device 29 may comprise a booster and a detonator. Preferably, the initiating device 29 comprises electric initiating explosives. An induction of the detonator detonates the booster which in turn causes a larger body of explosives to explode. The initiating device 29 may be configured to
receive a firing command through a cable harness or wirelessly. A wireless initiatingdevice 29 is preferred which may further comprise a battery for power supply and a
digital receiver for receiving a firing command in the form of radio signals.
The loading assembly 6 may also be used for deploying any other suitable devices or tools into a borehole and subsequently retracting the same from the borehole during a preparing process of blasting operation, which preparing process typically encompasses the tasks of sampling, analyzing, inspecting, imaging, cleaning, charging
of the borehole, et cetera.
ln some embodiments as illustrated in Figs. 3 - 5, the loading assembly 6 comprises at least two inlets 11, 12, wherein one inlet 12 is in line with the outlet 13, each of the at least two inlets 11, 12 is adapted for communication with a guide tube 21. Comparing with the loading assembly 6 with one inlet 12, the loading assembly 6 with at least two inlets 11, 12 has the advantage of shortening queue time at entrance of the loading assembly 6 thereby speeding up the deliveries into the borehole. Furthermore, the loading assembly 6 with at least two inlets 11, 12 may be adaptable to a plurality of
booms 4 of a rig
ln some embodiments as illustrated in Figs. 3 - 5, the switch unit (9) comprises at least two switchable slots 7, 8. Comparing with the switch unit 9 with one switchable slot 7, 8, the switch unit 9 with at least two switchable slots 7, 8 is able to streamline multiple deliveries that arrive at the loading assembly 6 at different times thereby increasing the
efficiency of preparing a borehole for a blasting operation.
The switch means 10 may comprise a connecting member configured to connect the at least two switchable slots 7, 8 such that the slots 7, 8 are able to move to switch position simultaneously. The switch means 10 with the connecting member provides
the advantage of compact and yet flexible designs of the loading assembly
ln some embodiments, the switch means 10 comprises a sliding member configured to connect the at least two switchable slots 7, 8 such that the slots 7, 8 are able to slide to
switch position.
ln some embodiments, the switch means 10 comprises a pivot member configured to connect the at least two switchable slots 7, 8 such that the slots 7, 8 are able to rotate
around the pivot member to switch position.
ln some embodiments as schematically illustrated in Figs. 3 - 5, the loading assembly 6 comprises an outlet 13 adapted for communication with a borehole; a first inletconfigured to receive an initiating device 29 or a packaged explosive product; a secondinlet 12 configured to receive an explosive delivery hose 22, wherein the second inlet 12 is in line with the outlet 13, the inlets 11, 12 each is adapted for communication with a guide tube 21. The loading assembly 6 further comprises a switch unit 9 comprising a switch means 10, a first 7 and second 8 slot, wherein each of the slots 7, 8 is switchable to a first position in line with the first inlet 11 or the second inlet 12, or a
second position out of line with any of the inlets 11,
The explosive delivery hose 22 is usually used for pumping a bulk explosive product into a borehole. The bulk explosive product may be emulsion explosives such as ammonium nitrate emulsion (ANE). The explosive delivery hose 22 can be arranged on a beam 5 (Fig. 1) by means of a hose handling unit 28 as illustrated in Fig. 2. The hose handling unit 28 may comprise a pusher-puller assembly 26 and a winding member 27. The hose handling unit 28 facilitates delivery of the bulk explosive product into the borehole from a remotely located storage assembly S1 which the explosive delivery
hose 22 is connected to (Fig. 6).
The explosive delivery hose 22 may also be configured to propel an initiating device 29 or packaged explosive product into a borehole. ln some embodiments, the explosive delivery hose 22 may propel the initiating device 29 to an operative depth inside a borehole. AftenNards the explosive delivery hose 22 may withdraw continuously from the borehole while at least partially filling the borehole with a bulk explosive product. Thus, the borehole is loaded with the bulk explosive product from the inside out thereby
ensuring that the borehole is loaded properly and evenly.
The explosive delivery hose 22 may comprise a gripping member configured to grip and release the initiating device 29 or packaged explosive product. The releasable gripping member enables two-way shuttling of the initiating device 29 or packaged
explosive product in opposite directions.
The loading assembly 6 as illustrated in Figs. 3 - 5 has the advantage of delivering an initiating device 29 and an explosive material simultaneously or sequentially into a borehole through the same outlet 13 which needs to be aligned with the borehole in advance. Thus, loading of each borehole requires only a single alignment of the
loading assembly 6 and the borehole, which significantly increases work efficiency.
ln some embodiments as illustrated in Fig. 2, the loading assembly 6 may comprise a casing 14 that provides protection to at least a portion of the loading assembly 6. Preferably, the casing 14 is openable thereby providing easy access to the inside of the
loading assembly 6 for the purpose of repair and maintenance.ln some embodiments as illustrated in Fig. 7, the first slot 7 has an at least partially closed end configured to block communication with the outlet 13 at the first position in line with the second inlet 12 (Fig. 7c), the second slot 8 has an open end adapted for communication with the outlet 13 at the first position in line with the second inlet 12 (Fig. 7a and b), and wherein the second inlet 12 has a parking space 25 configured to accommodate the initiating device 29 or packaged explosive product (Fig. 7d). The at least partially closed end of the first slot 7 is configured to block communication between the first slot 7 and the outlet 13 thereby preventing the initiating device 29 or the packaged explosive product from moving out of the first slot 7 towards the outlet 13 at the first position. The first slot 7 with the at least partially closed end provides the advantage of preventing crash stops orjams thereby ensuring proper operation of the switch means 10, which is achieved by retaining the initiating device 29 or the packaged explosive product within the first slot 7. The second slot 8 of the loading assembly as was described above has two open ends, one is adapted for communication with the second inlet 12 and the other one is adapted for
communication with the outlet
ln some embodiments as illustrated in Fig. 7d, at the first position in line with the second inlet 12, the initiating device 29 or the packaged explosive product may be shuttled from the first slot 7 into the parking space 25 of the second inlet 12, which enables switching of the second slot 8 to the first position in line with the second inlet 12. The shuttling of the initiating device 29 or packaged explosive product from the first slot 7 to the parking space 25 of the second inlet 12 may be facilitated by an explosive delivery hose 22 that comprises a gripping member configured to grip the initiating device 29 or packaged explosive product. Subsequently, the explosive delivery hose 22 may propel the initiating device 29 and/or the packaged explosive product through the passage formed by the second inlet 12, the second slot 8 and the outlet 13 into the borehole. ln some embodiments, the explosive delivery hose 22 may propel the initiating device 29 to an operative depth inside a borehole before releasing the initiating device 29 and retreating from the borehole while at least partially filling the borehole with a bulk explosive product. Thus, deliveries of the initiating device 29 and explosive material into the borehole may be streamlined which can be completed with minimum delay thereby increasing the efficiency of preparing a borehole for a blasting
operation.
ln some embodiments as schematically illustrated in Fig. 3, the loading assemblyfurther comprises at least one blocking member (15) configured to retain the initiating
device 29 or the packaged explosive product within the first slot 7, wherein the at least one blocking member 15 is arranged at the first inlet 11. The at least one blocking member 15 is actuated once the initiating device 29 has made entry into the first slot 7, which prevents the initiating device 29 or the packaged explosive product from moving out of the first slot 7 toward the first inlet 11. The blocking member 15 has the advantage of preventing crash stops orjams thereby ensuring proper operation of the
switch means
ln some embodiments as illustrated in Fig. 6, the guide tube 21 comprises a Y-shaped bifurcation. The guide tube 21 with a Y-shaped bifurcation has three open ends 21a, 21b, 21c, wherein a first open end 21a is adapted for communication with the inlet 12 in line with the outlet 13 of the loading assembly 6, a second open end 21 b is adapted for communication with the explosive delivery hose 22 connectable to a storage assembly S1 for storing a bulk explosive product, and a third open end 21c is adapted for communication With a storage assembly S2 for storing a plurality of initiating devices 29. The bifurcation of guide tube 21 provides a lean configuration of the loading assembly 6 for charging a borehole with an initiating device 29 and a bulk explosive product, Which configuration requires, at a minimum, only one inlet 12 and one slot 8 for charging the borehole. The lean configuration may also be utilized for delivering
other suitable devices or tools into the borehole.
ln some embodiments as schematically illustrated in Figs. 4, 5 and 10, the loading assembly 6 may further comprise at least one system selected from the group consisting of a mechanical system 30, a sensing system 40, an imaging system 50, a range finding system 60 and a protractor system 70. Alternatively, the loading assembly 6 is connected to at least one system selected from the group consisting of a mechanical system 30, a sensing system 40, an imaging system 50, a range finding
system 60 and a protractor system
The mechanical system 30 facilitates mechanical operation of the loading assembly 6. The mechanical system may comprise an actuating unit 31 responsible for imparting and controlling mechanical motion of the switch means 10. The actuating unit 31 may comprise at least one motor 20 and at least one brake means 19 (Fig. 5). The at least one motor 20 may be a hydraulic motor, a pneumatic motor, an electric motor or any other type of motor suitable for the intended use. The actuating unit 31 may further comprise a torque limiter for preventing any damage by mechanical overload due to crash stops orjams. The mechanical system 30 may receive a control signal from a
control unit 16 (Fig. 10) and in response to the control signal the at least one motorconverts energy into mechanical motion. The mechanical system 30 may comprise at least one shuttling unit configured to deliver an explosive material, a device or tool into the one or more slots 7, 8, or into the parking space 25, or into a borehole during preparation for a blasting operation. The mechanical system 30 may further comprise a
hose handling unit 28 for handling the explosive delivery hose 22 (Fig. 2).
The sensing system (40) is able to detect events or changes in its environment. The sensing system may comprise at least one sensor 17 configured to determine status of the switch means 10 and/or at least one sensor 18 configured to determine status of the one or more slots 7, 8 (Fig. 5). The sensor 17, 18 may be a Hall effect sensor, a capacitive sensor or any other type of sensor suitable for the intended use. The sensor 17 may be a Hall effect sensor configured to determine whether the switch means 10 is active. The sensor 18 may be a capacitive sensor 18 configured to determine loading state of the one or more slots 7, 8. The sensing system 40 is configured to send data to other electronics such as a control unit 16 that controls operation of the loading
assembly 6 (Fig. 10).
The imaging system 50 facilitates targeting of a borehole and alignment of the loading assembly 6 with the borehole. The imaging system may comprise at least one camera configured to obtain image data of the borehole and its surroundings. The imaging
system is configured to send the image data to other electronics such as a control unit
16 that controls operation of the loading assembly 6 (Fig. 10).
The range finding system 60 facilitates positioning of the loading assembly 6. The range finding system 60 may comprise at least one range finding device 23 arranged in close vicinity to the outlet 13 (Fig. 4), which range finding device 23 is configured to measure the distance between the outlet 13 and a borehole. A range finding device 23 may be a laser, lidar, radar, sonar, ultrasonic, or optical rangefinder. The range finding system 60 is configured to send the distance data to other electronics such as a control
unit 16 that controls operation of the loading assembly 6 (Fig. 10).
The protractor system (70) facilitates positioning of the loading assembly 6. The protractor system 70 comprises at least one protractor device arranged in close vicinity to the outlet 13, which protractor device is configured to measure the angle of inclination of a borehole, which is the angle between the vertical and a tangent line to the borehole axis at the measurement point. The protractor system 70 is configured to send the data about the angle of inclination of the borehole to other electronics such as
a control unit 16 that controls operation of the loading assembly 6 (Fig. 10).According to a second aspect of the disclosure, there is provided a rig 1 comprising at least one loading assembly 6 as was described above. The rig 1 may be a complex equipment intended for earth surface use or underground use. The rig 1 may be a mining or construction work rig adapted for various mining operations or construction
work.
Fig. 1 shows schematically a mining or construction work rig 1 comprising a carrier 2, at least one boom 4 and a mounting device 3 attached to the at least one boom 4. Typically, the mounting device 3 comprises a beam 5 on which the loading assembly 6 may be arranged. Other devices or tools, e.g. a cleaning hose, may also be arranged on the same beam 5 as the loading assembly 6. An enlarged view of the beam 5 with the loading assembly 6 is provided in Fig. 2 which also shows an explosive delivery hose 22 supported by a hose handling unit 28 comprising a pusher-puller assemblyand a winding member
A mining or construction work rig 1 may comprise a left-side boom and a right-side boom. The loading assembly 6 as illustrated in Fig. 4 may be arranged on the left- or right-side boom, which loading assembly 6 comprises a first inlet 11R configured to receive an initiating device or a packaged explosive product when arranged on the right-side boom, and a first inlet 11L configured to receive an initiating device or a
packaged explosive product when arranged on the left-side boom.
According to a third aspect of the disclosure, there is provided a method of preparing a borehole for a blasting operation. Example embodiments of the method will be described in a general way by referring to Figs. 7 and 8 in which the optional method steps are marked with dashed lines. The method comprises the following steps, which
steps may be taken in any suitable order.
Step 121: positioning the loading assemblyThe step 121 of positioning the loading assembly 6 may comprise one or more sub- steps of positioning the outlet 13 in line with a borehole. A precise and swift alignment of the outlet 13 with a borehole ensures smooth and efficient deliveries into the
borehole.
ln the state of art, drilling of a borehole usually precedes preparing the borehole for a blasting operation. ln some embodiments according to the present disclosure, the step 121 of positioning the loading assembly 6 may overlap with the process of positioning a drill machine, wherein the loading assembly 6 and the drill machine may share the
same positioning information in relation to the borehole. Thus, charging of the boreholemay be performed directly after drilling without delay, which saves the time that would have been spent on a separate step of aligning the loading assembly 6 with the
borehole.
Step 122: switching a slot 7, 8 to the first position
The step 122 of switching a slot 7, 8 to the first position in line with any inlet 11, 12 is performed by the switch means (10). At the first position the slot 7, 8 is able to receive an incoming device or tool, e.g. an initiating device 29, a packaged explosive product
or an explosive delivery hose 22, through the inlet 11, 12 (Fig. 7).
Step 123: switching a slot 7, 8 to the second position
The optional step 123 of switching a slot 8 to the second position out of line with any inlet 11, 12 is also performed by the switch means (10). The second position is effectively a stand-by position at which the slot 8 is temporarily put out of action (Figs. 7c and 7d).
Preferably, the steps 122, 123 of switching a slot 7, 8 is synchronized when there are
at least two slots (7, 8) connected by a connecting member as was described above.
Step 124: shuttling a device or tool into the parking spaceThe optional step 124 of shuttling a device or tool into the parking space 25 is facilitated by the explosive delivery hose 22 with a releasable gripping member (Fig. 7d). An initiating device or a packaged explosive product may be temporarily parked in the parking space 25 before being propelled into the borehole by the explosive delivery hose 22 which may eventually release the initiating device or packaged explosive
product to complete the delivery.
Step 125: shuttling the device or tool into the slot 7,The step 125 of shuttling the device or tool into the slot 7, 8 may be performed by the shuttling unit of the mechanical system 30 which is responsible for delivering an explosive material, a device or tool into the borehole. The slot 7, 8 is able to receive the device or tool at the first position, which device or tool is able to enter the borehole by
passing through the receiving slot 7, 8 on the way to the delivery site.
ln some embodiments, the step 125 may comprise one or more sub-steps of shuttling a packaged explosive product, an initiating device 29, or an explosive delivery hose 22 into the slot 7, 8, whereby the packaged explosive product, initiating device 29, or explosive delivery hose 22 is able to enter the borehole by passing through the
receiving slot 7, 8 on the way to the delivery site.ln some embodiments as illustrated in Fig. 7, an initiating device 29 passes through a first receiving slot 7, the parking space 25 and a second slot 8 (not shown) of the
loading assembly 6 before entering the borehole to reach the delivery site.
ln some embodiments, the method of preparing a borehole for a blasting operation comprises one or more steps of allocating an amount of a bulk explosive product into
the borehole, which is performed by the explosive delivery hose
ln some embodiments, the loading assembly 6 may be used in a method of preparing a
borehole for a blasting operation, which method may comprise
- a first step of toe charging, wherein an explosive delivery hose 22 delivers a first amount of a bulk explosive product into the toe of a borehole;
- a second step of delivering an initiating device 29, wherein the explosive delivery hose 22 propels the initiating device 29 to an operative depth inside the borehole and subsequently
- a third step of column charging, wherein the explosive delivery hose 22 at least
partially fills the borehole with a second amount of the bulk explosive product.
The first step of toe charging is also known as bottom charging which improves the effect of blasting at the bottom of the borehole, which facilitates controlled rock
fragmentation and safe contours in mining and construction.
The second step as was described above comprises
positioning 121 the outlet 13 of the loading assembly 6 in line with the borehole, switching 122 a slot 7, 8 to the first position for receiving the initiating device 29 or the explosive delivery hose 22, and
shuttling 125 the initiating device 29 or the explosive delivery hose 22 into the slot 7, 8, whereby the initiating device 29 or the explosive delivery hose 22 is able to enter the
borehole by passing through the receiving slot 7,
ln some embodiments, the loading assembly may comprise a control unit 16. Alternatively, the loading assembly may be connected to a control unit 16. As illustrated in Fig. 10, the control unit 16 may be connected with the mechanical system 30, the sensing system 40, the imaging system 50, the range finding system 60 and the protractor system 70 via the communication links 100a, 100b, 100c, 100d and 100e respectively. The control unit 16 comprises at least one processor 1601, at least one memory 1602 and at least one data port 1603. The at least one processor 1601 is usually an electronic processing circuitry that processes input data and provides
appropriate output.
According to a fourth aspect of the disclosure, there is provided a method performed by a control unit 16 or a computer connected to the control unit 16 for controlling operation of the loading assembly 6. Example embodiments of the method will be described in a
general way by referring to Fig. 9 in which the optional method actions are marked with dashed lines. The method comprises the following actions, which actions may be taken
in any suitable order.
Action 101: obtaining data
The action 101 may comprise one or more sub-actions of obtaining data from the mechanical system 30, the imaging system 40, the sensing system 50, the range finding system 60 and/or the protractor system 70. The obtained data may be used for the action of determining 112 status of the one or more slots (7, 8), and/or determining 113 status of the switch means 10. The obtained data may also be used for the action of controlling 102 operation of the switch unit 9, controlling 114 operation of the mechanical system (30), controlling 115 operation of the imaging system 40, controlling 116 operation of the sensing system 50, controlling 117 operation of the range finding
system 60, and/or controlling 118 operation of the protractor system
Action 102: controlling operation of the switch unit 9 The action 102 of controlling operation of the switch unit 9 may comprise one or more sub-actions of controlling the switch means 10 based on the data obtained in the action
101 of obtaining data.
Action 112: determining status of the one or more slots 7,The optional action 112 of determining status of the one or more slots 7, 8 may comprise one or more sub-actions of determining loading state of the one or more slots 7, 8 based on the data obtained in the action 101 of obtaining data from the sensing system 30. The data may provide information about proximity, pressure, force, position and/or displacement for the one or more slots 7, 8. The control unit 16 or a computer connected to the control unit 16 may use the obtained data to determine loading state
of the one or more slots 7, 8 for controlling operation of the loading assembly
Action 113: determining status of the switch meansThe optional action 113 of determining status of the switch means 10 may comprise one or more sub-actions based on the data obtained in the action 101 of obtaining data from the sensing system 30. The data may provide information about proximity, pressure, speed, position and/or displacement for the switch means 10. The control
unit 16 or a computer connected to the control unit 16 may use the obtained data todetermine status of switch means 10 for controlling operation of the loading assembly
Action 114: controlling operation of the mechanical systemThe optional action 114 of controlling the mechanical system 30 may comprise one or more sub-actions of controlling the actuating unit 31 which is responsible for imparting and controlling mechanical motion of the switch means 10. The action of controlling the mechanical system 30 may also comprise one or more sub-actions of controlling the shuttling unit which may be configured to deliver an explosive material, a device or tool into the one or more slots 7, 8, or into the parking space 25, or into a borehole. The action of controlling the mechanical system 30 may further comprise one or more sub- actions of controlling the hose handling unit 28 for handling the explosive delivery hose 22. The action of controlling the mechanical system 30 is based on the data obtained in
the action 101 of obtaining data.
Action 115: controlling operation of the sensing system 40 The optional action 115 of controlling the sensing system 40 may comprise one or more sub-actions of controlling the at least one sensor 17, 18 based on the data
obtained in the action 101 of obtaining data.
Action 116: controlling operation of the imaging system 50 The optional action 116 of controlling the imaging system 50 may comprise one or more sub-actions of controlling the at least one camera based on the data obtained in
the action 101 of obtaining data.
Action 117: controlling operation of the range finding system 60 The optional action 117 of controlling the range finding system 60 may comprise one or more sub-actions of controlling the at least one range finding device 23 based on the
data obtained in the action 101 of obtaining data.
Action 118: controlling operation of the protractor system 70 The optional action 118 of controlling the protractor system 70 may comprise one or more sub-actions of controlling the at least one protractor device based on the data
obtained in the action 101 of obtaining data.
According to a fifth aspect of the disclosure, there is provided a computer program product comprising instructions which, when executed on at least one processor 1601, cause the at least one processor 1601 to carry out the method for controlling operation
of the loading assemblyAccording to some embodiments herein there is provided a computer program which comprises program code for causing a control unit 16 or a computer connected to the control unit 16 to carry out the method for controlling operation of the loading assembly
The computer program comprises routines for controlling operation of the loading assembly 6. The computer program may comprise routines for obtaining data from the mechanical system 30, the imaging system 40, the sensing system 50, the range finding system 60 and/or the protractor system 70. The computer program may comprise routines for determining 112 status of the one or more slots (7, 8), and/or determining 113 status of the switch means 10. The computer program may comprise routines for controlling 102 operation of the switch unit 9, controlling 114 operation of the mechanical system (30), controlling 115 operation of the imaging system 40, controlling 116 operation of the sensing system 50, controlling 117 operation of the
range finding system 60, and/or controlling 118 operation of the protractor system
According to a sixth aspect of the disclosure, there is provided a computer-readable storage medium storing a computer program product comprising instructions which, when executed on at least one processor 1601, cause the at least one processorto carry out the method for controlling operation of the loading assembly
According to some embodiments herein there is provided a computer-readable storage medium storing a computer program, wherein said computer program comprises program code for causing a control unit 16 or a computer connected to the control unit 16 to carry out the method for controlling operation of the loading assembly 6. The computer-readable storage medium may comprise non-volatile memory (NVM) for
storing the computer program.
Although the invention has been described in terms of example embodiments as set forth above, it should be understood that the examples are given solely for the purpose of illustration and are not to be construed as limitations of the claims, as many variations thereof are possible Without departing from the scope of the invention. Each feature disclosed or illustrated in the present disclosure may be incorporated in the claims, whether alone or in any appropriate combination with any other feature
disclosed or illustrated herein.
Claims (11)
1. A loading assembly (6) for preparing a borehole for a blasting operation, which loading assembly (6) comprises an outlet (13) adapted for communication with the borehole; at least two inlets (11, 12), wherein a second inlet (12) is in line with the outlet (13), the at least two inlets (11, 12) each is adapted for communication with a guide tube (21), characterized in that the loading assembly (6) further comprises a switch unit (9) comprising a switch means (10) and at least a first slot (7) and a second slot (8), wherein each of the slots (7, 8) is switchable to a first position in line with any of the at least two inlets (1 1, 12) or to a second position out of line with any of the at least two inlets (11, 12), wherein each of the slots (7, 8) has an open end adapted for communication with any of the at least two inlets (11, 12) at the first position, wherein the first slot (7) has an at least partially closed end configured to block communication with the outlet (13) at the first position in line with the second inlet (12), the second slot (8) has an open end adapted for communication with the outlet (13) at the first position in line with the second inlet (12), and wherein the second inlet (12) has a parking space (25) configured to accommodate an initiating device (29) or a packaged explosive product.
2. The loading assembly (6) according to claim 1, wherein the at least two inlets (11, 12) comprise a first inlet (11) configured to receive an initiating device (29) or a packaged explosive product, and the second inlet (12) configured to receive an explosive delivery hose (22).
3. The loading assembly (6) according to claim 2 further comprising at least one blocking member (15) configured to retain the initiating device (29) or the packaged explosive product within the first slot (7), wherein the at least one blocking member (15) is arranged atthe first inlet (11).
4. The loading assembly (6) according to any one of the preceding claims, wherein the guide tube (21) comprises a Y-shaped bifurcation.
5. The loading assembly (6) according to any one of the preceding claims further comprising at least one system selected from the group consisting of a mechanical system (30), a sensing system (40), an imaging system (50), a range finding system (60) and a protractor system (70).
6. A rig (1) comprising at least one loading assembly (6) according to any one of the preceding claims.
7. A method of preparing a borehole for a blasting operation, which method comprises the steps of positioning (121) the outlet (13) of the loading assembly (6) according to any one of the claims 1 to 5 in line with the borehole, switching (122) a slot (7, 8) to the first position, and shutt/ing (125) a device or tool into the slot (7, 8), whereby the device or tool is able to enter the borehole by passing through the slot (7,8).
8. A method performed by a control unit (16) or a computer connected to the control unit (16) for controlling operation of the loading assembly (6) according to any one of the claims 1 to 5, which method comprises the actions of obtaining (101) data, determining (112, 113) status of the one or more slots (7, 8) and/or the switch means (10), and controlling (102) operation of the switch unit (9).
9. The method according to claim 8 further comprising the action of control/ing (114) operation of the mechanical system (30), controlling (115) operation of the sensing system (40), controlling (116) operation of the imaging system (50), controlling (117) operation of the range finding system (60), and/orcontrol/ing (118) operation of the protractor system (70).
10. A computer program product comprising instructions which, when executed on at least one processor (1601), cause the at least one processor (1601) to carry out the method according to claim 8 or
11. A computer-readable storage medium storing a computer program product comprising instructions which, when executed on at least one processor (1601), cause the at least one processor (1601) to carry out the method according to claim 8 or 9.
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE2030174A SE545574C2 (en) | 2020-05-26 | 2020-05-26 | Loading Assembly and Method for Preparing Boreholes for a Blasting Operation |
AU2021278767A AU2021278767A1 (en) | 2020-05-26 | 2021-05-24 | Loading assembly and method for preparing boreholes for a blasting operation |
PCT/SE2021/050483 WO2021242163A1 (en) | 2020-05-26 | 2021-05-24 | Loading assembly and method for preparing boreholes for a blasting operation |
CA3179796A CA3179796A1 (en) | 2020-05-26 | 2021-05-24 | Loading assembly and method for preparing boreholes for a blasting operation |
EP21729058.4A EP4158274A1 (en) | 2020-05-26 | 2021-05-24 | Loading assembly and method for preparing boreholes for a blasting operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE2030174A SE545574C2 (en) | 2020-05-26 | 2020-05-26 | Loading Assembly and Method for Preparing Boreholes for a Blasting Operation |
Publications (2)
Publication Number | Publication Date |
---|---|
SE2030174A1 SE2030174A1 (en) | 2021-11-27 |
SE545574C2 true SE545574C2 (en) | 2023-10-24 |
Family
ID=76197536
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SE2030174A SE545574C2 (en) | 2020-05-26 | 2020-05-26 | Loading Assembly and Method for Preparing Boreholes for a Blasting Operation |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP4158274A1 (en) |
AU (1) | AU2021278767A1 (en) |
CA (1) | CA3179796A1 (en) |
SE (1) | SE545574C2 (en) |
WO (1) | WO2021242163A1 (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4040329A (en) * | 1975-06-09 | 1977-08-09 | Nitro Nobel Ab | Method and arrangement for charging of shotholes |
JPH08177374A (en) * | 1994-12-21 | 1996-07-09 | Furukawa Co Ltd | Explosive loading device |
WO2003042626A1 (en) * | 2001-11-12 | 2003-05-22 | Sandvik Tamrock Oy | Arrangement for inserting charges into drill hole |
US20050161257A1 (en) * | 2000-07-03 | 2005-07-28 | Bjorn Finden | Method and apparatus for providing a primer with a detonator in a borehole |
WO2011106830A1 (en) * | 2010-03-01 | 2011-09-09 | Grange Resources Limited | A system and method for charging a blast hole |
WO2013098460A1 (en) * | 2011-12-28 | 2013-07-04 | Sandvik Mining And Construction Oy | Method and mining vehicle for post-drilling insertion |
JP2015067956A (en) * | 2013-09-26 | 2015-04-13 | 古河ロックドリル株式会社 | Explosive charging device and work machine equipped with the same |
US20180106584A1 (en) * | 2016-10-17 | 2018-04-19 | Vale S.A. | Vehicle for deposition of explosives in blast holes and method of use |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3104584A (en) * | 1961-03-14 | 1963-09-24 | Jacobs Joseph Donovan | Hole packing device |
US10570736B2 (en) * | 2016-06-09 | 2020-02-25 | Abb Schweiz Ag | Robot automated mining |
-
2020
- 2020-05-26 SE SE2030174A patent/SE545574C2/en unknown
-
2021
- 2021-05-24 CA CA3179796A patent/CA3179796A1/en active Pending
- 2021-05-24 WO PCT/SE2021/050483 patent/WO2021242163A1/en unknown
- 2021-05-24 AU AU2021278767A patent/AU2021278767A1/en active Pending
- 2021-05-24 EP EP21729058.4A patent/EP4158274A1/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4040329A (en) * | 1975-06-09 | 1977-08-09 | Nitro Nobel Ab | Method and arrangement for charging of shotholes |
JPH08177374A (en) * | 1994-12-21 | 1996-07-09 | Furukawa Co Ltd | Explosive loading device |
US20050161257A1 (en) * | 2000-07-03 | 2005-07-28 | Bjorn Finden | Method and apparatus for providing a primer with a detonator in a borehole |
WO2003042626A1 (en) * | 2001-11-12 | 2003-05-22 | Sandvik Tamrock Oy | Arrangement for inserting charges into drill hole |
WO2011106830A1 (en) * | 2010-03-01 | 2011-09-09 | Grange Resources Limited | A system and method for charging a blast hole |
WO2013098460A1 (en) * | 2011-12-28 | 2013-07-04 | Sandvik Mining And Construction Oy | Method and mining vehicle for post-drilling insertion |
JP2015067956A (en) * | 2013-09-26 | 2015-04-13 | 古河ロックドリル株式会社 | Explosive charging device and work machine equipped with the same |
US20180106584A1 (en) * | 2016-10-17 | 2018-04-19 | Vale S.A. | Vehicle for deposition of explosives in blast holes and method of use |
Also Published As
Publication number | Publication date |
---|---|
SE2030174A1 (en) | 2021-11-27 |
AU2021278767A1 (en) | 2022-10-13 |
WO2021242163A1 (en) | 2021-12-02 |
CA3179796A1 (en) | 2021-12-02 |
EP4158274A1 (en) | 2023-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2744832C2 (en) | Vehicle for laying explosives in blast holes and the method of its application | |
US7191060B2 (en) | Method for automatically guiding a mining machine | |
CN109375263B (en) | Earthquake advanced prediction device, system and method suitable for drilling and blasting method tunnel | |
JP5754581B2 (en) | Mining method and unit for submarine deposits | |
JP2813558B2 (en) | Underwater object destruction method | |
JPS58138894A (en) | Automatic boring control apparatus | |
JP2017002704A (en) | Apparatus and method for excavation and road pole installation | |
US20240003225A1 (en) | Method of generating a drill hole sequence plan and drill hole sequence planning equipment | |
CN105300206A (en) | Control method for robot used for on-site explosive mixing and loading operation | |
WO2018223184A1 (en) | A method and apparatus for dewatering, lining and depositing bulk explosive into a blast hole in a single pass | |
SE545574C2 (en) | Loading Assembly and Method for Preparing Boreholes for a Blasting Operation | |
JPH11173800A (en) | Blasting method and blasting tube | |
CN209295803U (en) | A kind of device for drill jumbo dynamite charge | |
CN110979672A (en) | Transient electromagnetic emission loop wiring device and method carried by unmanned aerial vehicle | |
US20240076847A1 (en) | System for remotely operated subsurface measurements | |
CN109506534A (en) | A kind of device for drill jumbo dynamite charge | |
US3456982A (en) | Automatic internal tram control | |
WO2017041820A1 (en) | An automated connection system for a charging application and a charging method | |
EP3825514B1 (en) | Rock drilling unit and method for charging drilled holes | |
US11965726B2 (en) | Rock drilling unit and method for charging drilled holes | |
WO2023249559A1 (en) | Systems and methods/processes | |
KR102589072B1 (en) | Measurement method of displacement using a measuring target with automatic transport function | |
AU2022202388A1 (en) | Systems and methods for triggering explosives in holes | |
WO2023173168A1 (en) | A method and apparatus for deploying a lining for explosives into a blast hole | |
WO2023060305A1 (en) | Method and apparatus for remotely or autonomously depositing explosives into a blast hole |