SE544896C2 - Protective device and working bridge for roof work integrated in Takstol - Google Patents
Protective device and working bridge for roof work integrated in TakstolInfo
- Publication number
- SE544896C2 SE544896C2 SE2130236A SE2130236A SE544896C2 SE 544896 C2 SE544896 C2 SE 544896C2 SE 2130236 A SE2130236 A SE 2130236A SE 2130236 A SE2130236 A SE 2130236A SE 544896 C2 SE544896 C2 SE 544896C2
- Authority
- SE
- Sweden
- Prior art keywords
- bridge
- rule
- takstol
- protective device
- working bridge
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/041—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffolds on roof frameworks or on roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
- E04B7/022—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of a plurality of parallel similar trusses or portal frames
- E04B7/024—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of a plurality of parallel similar trusses or portal frames the trusses or frames supporting load-bearing purlins, e.g. braced purlins
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/22—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
Abstract
Takstol som beställs från tillverkare eller tillverkas på plats dimensioneras med utstickande del i lämplig höjd och bredd. Längst ut monteras en stående regel som används som stöd för räcke med sparkskydd enl. bild ovan. Längsgående regel monteras för stabilitet, golvplank i godkänt virke monteras. Efter färdigställt arbete sågas konstruktionen bort och ytan byggs igen tillsammans med fasad. Dimensionering av utstick skall dimensioneras dels för horisontell last på regel för räcke samt för vertikal last mot gångbryggan.Roof chair that is ordered from the manufacturer or manufactured on site is dimensioned with a protruding part in the appropriate height and width. At the far end, a standing rule is mounted which is used as a support for a railing with kick protection acc. picture above. Longitudinal rule is mounted for stability, floorboard in approved wood is mounted. After completed work, the construction is sawn off and the surface is rebuilt together with the facade. Dimensioning of protrusions must be dimensioned partly for horizontal load on the rule for the railing and for vertical load against the footbridge.
Description
Beskrivning ~ ~'. , .i. :-. . . .a . .i . tm... _. . . at' ._ t. i.. .=. . ~..\-. :. §.=i\\==.:\.~.=<:.,._..mïiëëg 'Gczï àixhïtsšxïn-gïgïtš :Qi ïâxmšïftëxšëxnï M Allmän del Dagens byggbransch styrs allt mer av hårda tidsplaner som gör att det är av yttersta vikt att ha en smidig och effektiv process för byggande ute på arbetsplats. Utöver detta så är arbetsmiljön generellt och en säker arbetsplats utan olyckor ett väldigt prioriterat arbete i en riskfylld bransch. Således finns det otroligt goda möjligheter att lyckas för innovationer som kombinerar intjäning tidsmässigt med förhöjd säkerhet på arbetsplats. Description ~ ~'. , .i. :-. . . . .in . tm... _. . . at' ._ t. i.. .=. . ~..\-. :. §.=i\\==.:\.~.=<:.,._..mïiëëg 'Gczï àixhïtsšxïn-gïgïtš :Qi ïâxmšïftëxšëxnï M General part Today's construction industry is increasingly governed by tight schedules that make it of the utmost importance of having a flexible and efficient process for construction outside the workplace. In addition to this, the working environment in general and a safe workplace without accidents is a highly prioritized task in a risky industry. Thus, there are incredibly good opportunities for success for innovations that combine earnings in terms of time with increased safety in the workplace.
I ett traditionellt byggprojekt är önskemålet att så snart den bärande stommen är uppförd ha en tät stomme. Det får konsekvensen att man vill jobba med ytterväggar/fasader parallellt med färdigställande yttertak. Detta ställer oerhörda krav på en säker lösning när arbete sker i flera nivåer. I dagsläget finns det väl generellt 2 lösningar som tillämpas i dessa lägen: - Fast fasadställning som monteras runt hela byggnaden, där arbete på fasader och yttertak sker från ställningen. Fördelar med denna variant är att åtkomst ges till all önskad arbetsyta. Nackdelar är att denna variant är dyr, platskrävande, ej flexibel, besvärlig för materialhantering och kräver mycket tid för att bygga upp ställningen - Klätterplattform för fasadarbeten kombinerad med takfotsbrygga eller liknande. Arbete på fasad sker från klätterplattformen och skydd för takarbeten säkerställs genom takfotsbrygga. Klätterplattformen ger en bra flexibilitet och underlättar materialhantering, dock innebär konventionell lösning med takfotsbrygga att yttertaket ej kan färdigställas från ställning från bryggan utan måste göras från annan ställning. Med skyddsanordning och arbetsbrygga integrerad itakstol löses detta problem då hela takfoten nås från bryggan. In a traditional construction project, the desire is to have a tight frame as soon as the load-bearing frame is erected. The consequence is that you want to work with external walls/facades in parallel with completing external roofs. This places enormous demands on a secure solution when work takes place on several levels. Currently, there are generally 2 solutions that are applied in these situations: - Fixed facade scaffolding that is mounted around the entire building, where work on facades and external roofs takes place from the scaffolding. Advantages of this variant are that access is given to all the desired workspace. Disadvantages are that this variant is expensive, takes up space, is not flexible, difficult for material handling and requires a lot of time to build the scaffold - Climbing platform for facade work combined with eaves bridge or similar. Work on the facade takes place from the climbing platform and protection for roof work is ensured by the eaves bridge. The climbing platform provides good flexibility and facilitates material handling, however the conventional solution with eaves bridge means that the outer roof cannot be completed from scaffolding from the bridge but must be done from another scaffolding. With a protective device and working bridge integrated roof chair, this problem is solved as the entire eaves can be reached from the bridge.
Speciell del Figur 1: Detalj på utförande takfotsbrygga Figur 2: Exempel på takstol med takfotsbrygga Figur 3: Exempel på takstol med takfotsbrygga Figur 4: Detalj på utförande takfotsbryggaSpecial part Figure 1: Detail of design eaves bridge Figure 2: Example of truss with eaves bridge Figure 3: Example of truss with eaves bridge Figure 4: Detail of construction of eaves bridge
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE2130236A SE544896C2 (en) | 2021-09-08 | 2021-09-08 | Protective device and working bridge for roof work integrated in Takstol |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE2130236A SE544896C2 (en) | 2021-09-08 | 2021-09-08 | Protective device and working bridge for roof work integrated in Takstol |
Publications (2)
Publication Number | Publication Date |
---|---|
SE2130236A1 SE2130236A1 (en) | 2022-12-20 |
SE544896C2 true SE544896C2 (en) | 2022-12-20 |
Family
ID=84488944
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SE2130236A SE544896C2 (en) | 2021-09-08 | 2021-09-08 | Protective device and working bridge for roof work integrated in Takstol |
Country Status (1)
Country | Link |
---|---|
SE (1) | SE544896C2 (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2681623A1 (en) * | 1991-09-24 | 1993-03-26 | Bourgeois Entreprise F | Protection device for working on roofs |
US20020027043A1 (en) * | 2000-09-07 | 2002-03-07 | Richard Wisler | Wall jack |
WO2002092946A1 (en) * | 2001-05-11 | 2002-11-21 | Ray Robert Shorey | Temporary rooftop and stairway safety rail system |
US20110012000A1 (en) * | 2009-07-16 | 2011-01-20 | Dan Bulley | Platform Support Structures and Platform Assemblies |
-
2021
- 2021-09-08 SE SE2130236A patent/SE544896C2/en unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2681623A1 (en) * | 1991-09-24 | 1993-03-26 | Bourgeois Entreprise F | Protection device for working on roofs |
US20020027043A1 (en) * | 2000-09-07 | 2002-03-07 | Richard Wisler | Wall jack |
WO2002092946A1 (en) * | 2001-05-11 | 2002-11-21 | Ray Robert Shorey | Temporary rooftop and stairway safety rail system |
US20110012000A1 (en) * | 2009-07-16 | 2011-01-20 | Dan Bulley | Platform Support Structures and Platform Assemblies |
Also Published As
Publication number | Publication date |
---|---|
SE2130236A1 (en) | 2022-12-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SE544896C2 (en) | Protective device and working bridge for roof work integrated in Takstol | |
Ellis | What is Fall Protection? | |
US20050098769A1 (en) | Vertical panel lift | |
KR101426315B1 (en) | Two works of rope hanging scaffolding fixture and construction method of the fixed device | |
RU2555951C2 (en) | Rescue appliance | |
Mitropoulos et al. | Analysis of residential framing accidents, activities, and task demands | |
Earnest et al. | Knowledge gaps and emerging issues for fall control in construction | |
US308574A (en) | Shingung-gage | |
Qzay et al. | Application of RULA and NIOSH Ergonomic Risk Assessment Methods: A Case Study in Construction Industry in Turkey | |
SE1650713A1 (en) | Rule of wrapped paper for non-load bearing walls | |
KR102380334B1 (en) | A block chain-type rope fixing mechanism that can double guarantee the safety of workers during the repair work of buildings constructed in the gable roof style | |
EP3842598A3 (en) | Building system with wooden prefab modules | |
US388829A (en) | Fire-escape | |
AU2018213985A1 (en) | Gutter Pro-Tec An ultimate gutter protection from ladder. Protects the gutter from getting dented and scratched due to the weight of the ladder and the person climbing up onto the top of a domestic and commercial building roofs, preventing the ladder from slipping and falling off from the gutter and for safety measures. For professionals and for Do It Yourself (DIY). | |
GB2486938A (en) | Ladder storage accessories | |
Shafie | Design and fabrication of moveable ladder | |
SU754021A1 (en) | Suspended scaffold | |
Perry et al. | Evaluating Fall Safety Compliance Among Skilled Trades in Construction | |
TR202015484U4 (en) | A SAFETY EQUIPMENT TO BE USED IN WORKS WHERE THERE IS A RISK OF FALLING FROM HEIGHTS | |
US20130313046A1 (en) | Adjustable length scaffolding and method therefor | |
Byrd | Understanding | |
Ireland | Bricklayer | |
TR201815544U5 (en) | CONSTRUCTION OF MANUAL DRIVE HANDLE CRANE | |
Paine et al. | Evaluation of a decking fall protection system | |
Ram Pinninti et al. | Risk Mitigation Using Robotics: Case Studies. |