SE500265C2 - Method for dehumidifying water damage in two-layer floors in buildings - has air gap-forming unit laid out on floor and plastics tube provided with ventilation channel placed under unit - Google Patents

Method for dehumidifying water damage in two-layer floors in buildings - has air gap-forming unit laid out on floor and plastics tube provided with ventilation channel placed under unit

Info

Publication number
SE500265C2
SE500265C2 SE9201408A SE9201408A SE500265C2 SE 500265 C2 SE500265 C2 SE 500265C2 SE 9201408 A SE9201408 A SE 9201408A SE 9201408 A SE9201408 A SE 9201408A SE 500265 C2 SE500265 C2 SE 500265C2
Authority
SE
Sweden
Prior art keywords
floor
mat
ribbon
ventilation channel
unit
Prior art date
Application number
SE9201408A
Other languages
Swedish (sv)
Other versions
SE9201408D0 (en
SE9201408L (en
Inventor
Soeren Holmberg
Original Assignee
Soeren Holmberg
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Soeren Holmberg filed Critical Soeren Holmberg
Priority to SE9201408A priority Critical patent/SE500265C2/en
Publication of SE9201408D0 publication Critical patent/SE9201408D0/en
Publication of SE9201408L publication Critical patent/SE9201408L/en
Publication of SE500265C2 publication Critical patent/SE500265C2/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/70Drying or keeping dry, e.g. by air vents
    • E04B1/7069Drying or keeping dry, e.g. by air vents by ventilating
    • E04B1/7092Temporary mechanical ventilation of damp layers, e.g. insulation of a floating floor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)
  • Floor Finish (AREA)

Abstract

The plastics tube (4) has a ventilation channel and is cut along its whole length with a track or slot (6). A plastics foil is adhered or fastened to the unit and wall. On the other side of the opened floor a further plastic tube (4') with a ventilation channel is placed under the unit which is folded up against a wall. Insulation is fitted on top of the unit, the floor plate on top of the insulation, and a surface cladding on top of the floor plate. Dry air is transported under the unit and out via the ventilation channel (7).

Description

CO 265 ges ett med en ventilationskanal 5 försett plaströr 4, genom att ett spår eller slits 6 har skurits upp längs hela rörets 4 längd. Röret 4 anbringas under mattan 2, som uppvikes mot väggen 3 och en plastfolie 2' :listras eller fästes på mattan 2 och väggen 5. ?å andra sidan av et utrivna golvet anordnar man ett :ed en ventilationskanal 7 försett aströr 4' under mattan 2, som uppvikes not vägg 8 med samma typ av fastsättning so: förut. Isolering 9 anbringas ovanpå den s.k. ribbon- mattan 2, golvskiva 10 av typ spångolv läggas därpå och ytbeklädnad 11 av typ plastnatta pâföres därpå. Golvet 1' är nu klart att beträdas så- son frangår ovan, d.v.s. inga väntetider för att betongbjälklag skall torka ut. Golvet 1' är nu inlagt, rören 4 och 4' finnas på plats och det återstår att inkoppla avfuktnings- eller sorptionsaggregat 12, vil- ka ställas upp och anslutas via kanal 5 mellan rören 4 och 4', som ha nedlagts under :attan 2, varvid torrluft transporteras under mattan 2 och ut via den kanal 7, som har anbragts på motsatta sidan i röret 4'. CO 265 is given a plastic pipe 4 provided with a ventilation duct 5, by a grooves or slits 6 have been cut up along the entire length of the tube 4. The tube 4 applied under the carpet 2, which is folded up against the wall 3 and a plastic foil 2 ': glued or attached to the carpet 2 and the wall 5.? On the other side of a torn floor is provided with a ventilation duct 7 provided aströr 4 'under the carpet 2, which folds up wall 8 with the same type of attachment so: before. Insulation 9 is applied on top of the so-called ribbon- the carpet 2, floorboard 10 of the chipboard type is laid thereon and surface cladding 11 of the plastic night type is applied thereto. The floor 1 'is now ready to be walked on so- son deviates from the above, i.e. no waiting times for concrete floors to dry out. The floor 1 'is now laid, the pipes 4 and 4' are in place and it remains to connect dehumidification or sorption unit 12, which ka is set up and connected via channel 5 between the pipes 4 and 4 ', which ha laid under: attan 2, whereby dry air is transported under the carpet 2 and out via the channel 7, which has been arranged on the opposite side of the tube 4 '.

Uttorkningstiden vid inplastning är c:a 55 dygn och under den tiden är lokalen eller lägenheten icke tillgänglig. Vid tillämpning av ovan be- skrivna förfarande vinner man hela uttorkninfistiden, eftersom nan kan taga lokalen eller lägenheten i besittning för igenläggning omedelbart.The drying time for wrapping is about 55 days and during that time is the premises or apartment not available. In applying the above written procedure, you win the entire drying time, because nan can take possession of the premises or apartment for repossession immediately.

Avfuhtningen pågår sedan kontinuerligt. Förfarandet följes av kontinu- erlig fuktnätning i plattan. letoden är generell och kan tillämpas på samtliga typer av golv, som bestå av tvåsk'ktsgolv. Sedan uttorxning har skett, dementerar man torkutrustningen. Rören, som användas, kvar- lämnas i golvet, plastfolien, son klistras eller fästes nellan vägg och s.k. ribbonnatta, skäres upp på båda sidor on lokal eller lägenhet samt en ventilerad sockel anbringas och zätpunktsnâlen na upptagits och igen- satts, varvid arbetet har utförts.Dehumidification is then ongoing. The procedure is followed by continuous honest moisture network in the plate. the method is general and can be applied to all types of floors, which consist of two-layer floors. Then dehydration has taken place, the drying equipment is denied. The pipes used are still left in the floor, the plastic foil, son glued or attached nellan wall and s.k. ribbon night, cut up on both sides on premises or apartment as well a ventilated base is applied and the setpoint needles are picked up and set, whereby the work has been carried out.

Uppfinningen är naturligtvis icke begränsad till detta utförande utan kan själv“lart varieras inom ramen för uppfinningstanken. _-..The invention is of course not limited to this embodiment but can itself be varied within the scope of the inventive concept. _- ..

Claims (1)

3 500 265 P A T E N T K R A V 1 Förfarande för avfuktning av vattenskador på byggnadskonstruk- tioner, såsom t.ex. golv av tvåskiktstyp i lokaler eller lägenhe- ter, k ä n n e t e c k n a t därav, att en luftspaltbildande enhet (2) i form av en s.k. ribbonmatta utlägges på utrivet golv(1) och tvärs ribbonmattans(2) korrigering vid vägå(5) inlägges ett med en venti1ationskanal(5) försett, med spår eller slits(6) uppskuret, längs hela sin längd anordnat plaströr(4), som anbringas under rib- bonmattan(2), som uppvikes mot väggen(3) och en plastfolie(2') klist- ras eller fästes på ribbonmattan och väggen, att på andra sidan av det utrivna golvet(1) ett med en ventilationskanal(7) försett plast- rör(4') placeras under ribbonmattan(2), som uppvikes mot en vägg(8) på samma sätt som förut, att isolering(9) anbringas ovanpå ribbon- mattan(2), golvskiva(10) i form av spångolv ovanpå isoleringen(9) och ytbeklädnad(11) i form av plastmatta ovanpå spångolvet(10) och att nu inlagt golv(1') behandlas med avfuktnings- eller sorptions- aggregat(12), som anslutes via kanalen(5) mellan de under ribbonmat- tan(2) nedlagda plaströren(4 och 4'), varvid torrluft transporteras under ribbonmattan(2) och ut via den kanal(7), som har anbragts på motsatta eller andra sidan av golvet(1) i röret(4').3 500 265 P A T E N T K R A V 1 Procedure for dehumidifying water damage to building structures, such as e.g. floor of a two-layer type in rooms or apartments, characterized by the fact that an air gap-forming unit (2) in the form of a so-called a ribbon mat is laid on a torn floor (1) and across the correction of the ribbon mat (2) at road (5) a plastic pipe (4) provided with a ventilation duct (5), cut along its entire length, is inserted, which applied under the ribbed mat (2), which is folded up against the wall (3) and a plastic foil (2 ') is glued or attached to the ribbon mat and the wall, that on the other side of the torn floor (1) one with a ventilation duct (7) ) provided plastic pipe (4 ') is placed under the ribbon mat (2), which is folded up against a wall (8) in the same way as before, that insulation (9) is applied on top of the ribbon mat (2), floorboard (10) in the form of chipboard floor on top of the insulation (9) and surface cladding (11) in the form of plastic mat on top of the chipboard floor (10) and that now inlaid floor (1 ') is treated with dehumidification or sorption unit (12), which is connected via the channel (5) between the plastic pipes (4 and 4 ') laid under the ribbon mat (2), whereby dry air is transported under the ribbon mat (2) and out via the duct (7) which has been arranged on opposite smiles the other side of the floor (1) in the pipe (4 ').
SE9201408A 1992-05-05 1992-05-05 Method for dehumidifying water damage in two-layer floors in buildings - has air gap-forming unit laid out on floor and plastics tube provided with ventilation channel placed under unit SE500265C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SE9201408A SE500265C2 (en) 1992-05-05 1992-05-05 Method for dehumidifying water damage in two-layer floors in buildings - has air gap-forming unit laid out on floor and plastics tube provided with ventilation channel placed under unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SE9201408A SE500265C2 (en) 1992-05-05 1992-05-05 Method for dehumidifying water damage in two-layer floors in buildings - has air gap-forming unit laid out on floor and plastics tube provided with ventilation channel placed under unit

Publications (3)

Publication Number Publication Date
SE9201408D0 SE9201408D0 (en) 1992-05-05
SE9201408L SE9201408L (en) 1993-11-06
SE500265C2 true SE500265C2 (en) 1994-05-24

Family

ID=20386147

Family Applications (1)

Application Number Title Priority Date Filing Date
SE9201408A SE500265C2 (en) 1992-05-05 1992-05-05 Method for dehumidifying water damage in two-layer floors in buildings - has air gap-forming unit laid out on floor and plastics tube provided with ventilation channel placed under unit

Country Status (1)

Country Link
SE (1) SE500265C2 (en)

Also Published As

Publication number Publication date
SE9201408D0 (en) 1992-05-05
SE9201408L (en) 1993-11-06

Similar Documents

Publication Publication Date Title
JP2004169548A (en) Backing board material for ventilation
ATE30934T1 (en) COVERING FOR UNDERFLOOR OR WALL HEATING.
SE9301015L (en) Method and apparatus for drying water-damaged floors or concrete flooring existing in a building
SE500265C2 (en) Method for dehumidifying water damage in two-layer floors in buildings - has air gap-forming unit laid out on floor and plastics tube provided with ventilation channel placed under unit
Lstiburek Understanding vapor barriers
JP3484437B2 (en) Floor material and floor material construction method
JP3074342B2 (en) Floor panel
SE431356B (en) Method for drying out concrete slabs which have been damaged by damp
CH687478A5 (en) A method for drying a screed.
SE446021B (en) Ventilated floor
US261227A (en) hawley
Dallenbach The psychological laboratory of Cornell University
DE29521952U1 (en) Interior wall cladding for the renovation of damp cellars
SE527761C2 (en) Moisture protection and ways to protect moisture in a space
JP2015059331A (en) Double-floor structure and its construction method
JP3734795B2 (en) Underfloor moisture insulation and dehumidification method
DE3000845A1 (en) Ceiling heating pipes plastic insulating duct - comprises longitudinal channels almost enclosing pipes, pref. with cover
JP3594455B2 (en) Rollable wooden floor heating panel
JPS6317953Y2 (en)
Jones et al. Wood Frame Floor Systems
JPS58143055A (en) Waterproofing method of under place of tatami
JPS6073932A (en) Wall structure in house
JPS60212545A (en) Under-floor dehumidifying apparatus
DE1354726U (en)
JPH0651360U (en) Airtight and moisture-proof building interior materials