RU99113992A - SYSTEM, SHIP, MARINE BOTTOM INSTALLATION AND METHOD FOR OIL OR GAS PRODUCTION - Google Patents

SYSTEM, SHIP, MARINE BOTTOM INSTALLATION AND METHOD FOR OIL OR GAS PRODUCTION

Info

Publication number
RU99113992A
RU99113992A RU99113992/03A RU99113992A RU99113992A RU 99113992 A RU99113992 A RU 99113992A RU 99113992/03 A RU99113992/03 A RU 99113992/03A RU 99113992 A RU99113992 A RU 99113992A RU 99113992 A RU99113992 A RU 99113992A
Authority
RU
Russia
Prior art keywords
vessel
bottom installation
drilling
hinge assembly
wellhead
Prior art date
Application number
RU99113992/03A
Other languages
Russian (ru)
Other versions
RU2191888C2 (en
Inventor
Коре Брейвик
Атле ИНГЕБРИГТСЕН
Original Assignee
Ден Норске Статс Ольесельскап А.С.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from NO965065A external-priority patent/NO307210B1/en
Application filed by Ден Норске Статс Ольесельскап А.С. filed Critical Ден Норске Статс Ольесельскап А.С.
Publication of RU99113992A publication Critical patent/RU99113992A/en
Application granted granted Critical
Publication of RU2191888C2 publication Critical patent/RU2191888C2/en

Links

Claims (23)

1. Система для морской добычи нефти и газа, содержащая надводное судно (3, 63), имеющее средство для сохранения необходимого позиционирования и ориентации, природную установку (5, 65) на морсом дне (1) для, по крайней мере, двух добывающих скважин, и продуктовый трубопровод (6, 22, 62, 66) для соединения приводной установки (5, 65) с судном (3, 63), снабженные бурильным оборудованием (8) для скважин на морском дне (1) и технологическим оборудованием (9) для переработки нефти или газа, причем природная установка (5, 65) содержит опорную плиту 10 для бурения, имеющую основание, расположенное на морском дне, снабженную манифольдом (11) и выполненную с, по крайней мере, двумя позициями или секциями (13А-С), устья скважины, приспособленными для установки соединенных фонтанных арматур (14А, 14В), причем бурильная колонна (21, 61) выполнена проходящей от бурильного оборудования (8) на судне (3, 63), отличающаяся тем, что имеет подвижный операционный модуль (20), приспособленный для размещения на придонной установке (5, 65) и подсоединения к нижнему концу бурильной колонны (21, 61), а продуктовый трубопровод (6, 66) приспособлен для соединения операционного модуля (20) с технологическим оборудованием (9) на судне (3, 36).1. A system for offshore oil and gas production, comprising a surface vessel (3, 63) having means to maintain the necessary positioning and orientation, a natural installation (5, 65) on the seabed (1) for at least two production wells and a product pipeline (6, 22, 62, 66) for connecting the drive unit (5, 65) to the vessel (3, 63), equipped with drilling equipment (8) for wells on the seabed (1) and technological equipment (9) for oil or gas processing, and the natural installation (5, 65) contains a base plate 10 for drilling, having the main located on the seabed, equipped with a manifold (11) and made with at least two positions or sections (13A-C), the wellhead, adapted for installation of connected fountain fittings (14A, 14B), and the drill string (21 , 61) is made passing from the drilling equipment (8) on the ship (3, 63), characterized in that it has a movable operating module (20), adapted for placement on the bottom installation (5, 65) and connected to the lower end of the drill string ( 21, 61), and the product pipeline (6, 66) is adapted for soy Inonii operation unit (20) with process equipment (9) on the vessel (3, 36). 2. Система по п.1, отличающаяся тем, что она снабжена шарнирным узлом (30, 60), имеющим вертикальную ось и связанным с продуктовым трубопроводом (6, 66). 2. The system according to claim 1, characterized in that it is equipped with a hinge assembly (30, 60) having a vertical axis and connected to the product pipeline (6, 66). 3. Система по п.2, отличающаяся тем, что шарнирный узел (60) расположен на судне (63). 3. The system according to claim 2, characterized in that the hinge unit (60) is located on the vessel (63). 4. Система по п.2, отличающаяся тем, что шарнирный узел (30) соединен с операционным модулем (20). 4. The system according to claim 2, characterized in that the hinge assembly (30) is connected to the operation module (20). 5. Система по одному из пп.2 - 4, отличающаяся тем, что шарнирный узел (30) выполнен управляемым с помощью двигателя (35), предпочтительно при помощи управления средством для сохранения необходимого позиционирования и ориентации судна. 5. The system according to one of claims 2 to 4, characterized in that the hinge assembly (30) is made controllable by an engine (35), preferably by controlling means to maintain the required positioning and orientation of the vessel. 6. Система по одному из пп.2 - 5, отличающаяся тем, что шарнирный узел (30, 40, 60) имеет сквозное осевое отверстие (33, 43) для бурильной колонны (21. 61). 6. The system according to one of claims 2 to 5, characterized in that the hinge assembly (30, 40, 60) has a through axial hole (33, 43) for the drill string (21. 61). 7. Система по одному из пп.4 - 6, отличающаяся тем, что шарнирный узел (30) расположен под противовыбросовым устройством (25), соединенным с операционным модулем (20). 7. The system according to one of claims 4 to 6, characterized in that the hinge assembly (30) is located under the blowout preventer (25) connected to the operation module (20). 8. Система по одному из пп.4 - 7, отличающаяся тем, что продуктовый трубопровод (6) проходит вверх через воду для соединения с судном (39) в точке, находящейся на расстоянии от бурильного оборудования (8), предпочтительно на корме судна. 8. The system according to one of claims 4 to 7, characterized in that the product pipeline (6) passes up through the water to connect with the vessel (39) at a point located at a distance from the drilling equipment (8), preferably at the stern of the vessel. 9. Система по п. 8, отличающаяся тем, что продуктовый трубопровод (6) проходит вверх через воду в приблизительной S-образной форме вместе с изогнутой вверх приподнятой средней частью (16) продуктового трубопровода. 9. The system according to claim 8, characterized in that the product pipeline (6) passes upward through the water in an approximate S-shape with the upwardly curved raised middle part (16) of the product pipeline. 10. Система по одному из пп.1, 2, 3, 5, 6, отличающаяся тем, что продуктовый трубопровод (66, 76) присоединен вдоль водоотделяющей колонны (62, 72) для бурения к бурильной колонне (61, 71). 10. The system according to one of claims 1, 2, 3, 5, 6, characterized in that the product pipe (66, 76) is connected along the riser (62, 72) for drilling to the drill string (61, 71). 11. Система по одному из пп.1 - 10, отличающаяся тем, что судно снабжено средством для динамического позиционирования или ориентации. 11. The system according to one of claims 1 to 10, characterized in that the vessel is equipped with a means for dynamic positioning or orientation. 12. Судно для использования в системе по п.1, содержащее средство для сохранения необходимого позиционирования и ориентации на морской поверхности (2), бурильное оборудование (8) для скважин на морском дне (1) и технологическое оборудование (9) для переработки нефти или газа, отличающееся тем, что оно снабжено средство управления шарнирного узла (30, 40, 50), связанным со средством для сохранения необходимого позиционирования и ориентации, основанного на динамическом позиционировании и ориентации. 12. A vessel for use in the system according to claim 1, containing means for maintaining the necessary positioning and orientation on the sea surface (2), drilling equipment (8) for wells on the seabed (1) and processing equipment (9) for oil refining or gas, characterized in that it is provided with control means of the hinge assembly (30, 40, 50) associated with the means for maintaining the necessary positioning and orientation based on dynamic positioning and orientation. 13. Судно по п.12, отличающееся тем, что оно снабжено шарнирным узлом для верхнего продуктового трубопровода (66). 13. The vessel according to claim 12, characterized in that it is provided with a hinge assembly for the upper product pipeline (66). 14. Судно по п.12 или 13, отличающееся тем, что бурильное оборудование (8) с буровой шахтой расположено в основном на середине корабля и технологическое оборудование (9) предпочтительно с подсоединенной муфтой для продуктового трубопровода (6) расположено на корме. 14. A ship according to claim 12 or 13, characterized in that the drilling equipment (8) with a drill shaft is located mainly in the middle of the ship and the technological equipment (9) is preferably with a coupled coupling for the product pipeline (6) located aft. 15. Придонная установка для использования в системе по п.2, содержащая опорную плиту (10) для бурения, имеющую основание, расположенное на морском дне, и манифольд (11) и выполненную с, по крайней мере, двумя позициями или секциями (13 А-С) устья скважины, приспособленные для установки соединенных фонтанных арматур (14А, 14В), отличающаяся тем, что она снабжена подвижным операционным модулем (20), предпочтительно содержащим шарнирный узел (30), приспособленный для осуществления поворотного соединения с продуктовым трубопроводом (6), проходящим в надводное судно (3). 15. The bottom installation for use in the system according to claim 2, containing a base plate (10) for drilling, having a base located on the seabed, and a manifold (11) and made with at least two positions or sections (13 A -C) the wellhead, adapted for installation of connected fountain fittings (14A, 14B), characterized in that it is equipped with a movable operating module (20), preferably containing a hinge assembly (30), adapted for making a rotary connection with the product pipeline (6) passing in the surface e vessel (3). 16. Придонная установка по п.15, для использования в системе по п.5, отличающаяся тем, что шарнирный узел (30) выполнен управляемым с помощью двигателя (35). 16. The bottom installation according to claim 15, for use in the system according to claim 5, characterized in that the hinge assembly (30) is made controllable by an engine (35). 17. Придонная установка по п.15 или 16, отличающаяся тем, что операционный модуль (20) вместе с шарнирным узлом (30, 40) имеет сквозное осевое отверстие (33, 43) для бурильной колонны (21, 61). 17. The bottom installation according to claim 15 or 16, characterized in that the operation module (20) together with the hinge assembly (30, 40) has a through axial hole (33, 43) for the drill string (21, 61). 18. Придонная установка по одному из пп.15 - 17, отличающаяся тем, что шарнирный узел (30) расположен под противовыбросовым устройством (25), соединенным с операционным модулем (20). 18. A bottom installation according to one of claims 15-17, characterized in that the hinge assembly (30) is located under a blowout preventer (25) connected to the operation module (20). 19. Придонная установка по одному из пп.15 - 17, отличающаяся тем, что шарнирный узел (40) расположен над противовыбросовым устройством (47), соединенным с операционным модулем (20). 19. The bottom installation according to one of claims 15-17, characterized in that the hinge assembly (40) is located above the blowout preventer (47) connected to the operation module (20). 20. Придонная установка по одному из пп.15 - 19, отличающаяся тем, что операционный модуль (20, 50) в нижней части имеет разделительную поверхность такого же образца, что и фонтанные арматуры (14А-С), предназначенные для опускания и соединения с секциями (13А-С) устья скважины. 20. The bottom installation according to one of claims 15-19, characterized in that the operating module (20, 50) in the lower part has a dividing surface of the same sample as the fountain fittings (14A-C), designed for lowering and connecting with sections (13A-C) of the wellhead. 21. Придонная установка по одному из пп.15 - 20, отличающаяся тем, что операционный модуль (20, 40) снабжен вилкообразным хомутом (39, 49), приспособленным для удержания продуктового трубопровода (6, 6А, 44 44В), проходящего в боковом направлении и наклоном вверх с зазором относительно оставшихся элементов и оборудования на опорной плите (10) для бурения. 21. The bottom installation according to one of claims 15 to 20, characterized in that the operating module (20, 40) is equipped with a fork-shaped clamp (39, 49) adapted to hold the product pipe (6, 6A, 44 44B), passing in the lateral direction and tilt up with a gap relative to the remaining elements and equipment on the base plate (10) for drilling. 22. Система для морской добычи нефти или газа, включающая надводное судно (83), имеющее средство для сохранения необходимого позиционирования и ориентации, придонную установку (85) на морском дне (1) для, по крайней мере, двух добывающих скважин, и продуктовые трубопроводы (82, 86) для соединения придонной установки с судном, отличающаяся тем, что судно (83) снабжено бурильным оборудованием (8) для скважин на морском дне (1) с технологическим оборудованием (9) для переработки добытой нефти или газа, причем придонная установка (85) содержит опорную плиту (10) для бурения, имеющую основание, расположенное на морском дне, и манифольд (11) и выполненную с, по крайней мере, двумя позициями или секциями (13А-С) устья скважины, приспособленными для установки соединенных фонтанных арматур (14А, 14В), причем бурильная колонна (81) выполнена проходящей от бурильного оборудования (8) на судне (83) к противовыбросовому устройству (87) на придонной установке (85), а продуктовый трубопровод (86) для продукта приспособлен для соединения, по крайней мере, одной из добывающих скважин на придонной установке (85), к технологическому оборудованию (9) на судне (83). 22. System for offshore oil or gas production, including a surface vessel (83) having means to maintain the necessary positioning and orientation, a bottom installation (85) on the seabed (1) for at least two production wells, and product pipelines (82, 86) for connecting the bottom installation to the vessel, characterized in that the vessel (83) is equipped with drilling equipment (8) for wells on the seabed (1) with processing equipment (9) for processing the produced oil or gas, and the bottom installation (85) contains a base plate (10) for drilling, having a base located on the seabed, and a manifold (11) and made with at least two positions or sections (13A-C) of the wellhead, adapted for installation of connected fountain fittings (14A, 14B), and the column (81) is made passing from the drilling equipment (8) on the vessel (83) to the blowout preventer (87) on the bottom installation (85), and the product pipeline (86) for the product is adapted to connect at least one of the production wells at the bottom installation (85), to the technological mu equipment (9) on the vessel (83). 23. Способ добычи нефти или газа с помощью системы по одному из пп.1 - 11, включающий первоначальное размещение придонной установки (5) на морском дне (1) и судна (3) в положении на поверхности моря (2) над придонной установкой, отличающийся тем, что первоначально осуществляют бурение и завершение первой скважины на одной (первой) из секций (13А) устья скважины традиционным способом, затем первоначально осуществляют бурение и предпочтительно установку направляющей колонны и обсадных труб для второй скважины на второй секции (13В) устья скважины, опускают операционный модуль (20) с подсоединенным продуктовым (6, 22) для опускания и соединения на второй секции (13В) устья скважины с последующим продолжением бурения и последующим завершением (14В) второй скважины, добывают продукт из первой скважины через манифольд (11) и операционный модуль (20) на второй секции устья скважины (13В) одновременно продолжающимся бурением второй скважины, осуществляют бурение третьей скважины от третьей секции (13С) устья скважины с одновременной добычей продукта через операционный модуль (20) также из третьей скважины, и возможно дополнительное бурение на, по меньшей мере, новой секции (13Д) устья скважины с отсоединением и перемешиванием операционного модуля (20) к этой скважине до тех пор, пока нужное количество скважин не будет пробурено, завершено и запущено в производство, возможно с операционным модулем (20) окончательно размещенным предпочтительно на отдельном (специальном) месте на придонной установке. 23. The method of oil or gas production using the system according to one of claims 1 to 11, including the initial placement of the bottom installation (5) on the seabed (1) and the vessel (3) in a position on the sea surface (2) above the bottom installation, characterized in that the first well is drilled and completed on one (first) of the wellhead sections (13A) in a conventional manner, then the drilling and preferably the installation of the guide string and casing for the second well are carried out on the second wellhead section (13B), opus an operating module (20) with a connected product (6, 22) is inserted for lowering and connecting to the wellhead in the second section (13B), followed by continued drilling and subsequent completion (14B) of the second well, the product is extracted from the first well through manifold (11) the operation module (20) in the second section of the wellhead (13B) while continuing to drill the second well, the third well is drilled from the third section (13C) of the wellhead with simultaneous production of the product through the operation module (20) also from the third well s, and additional drilling is possible on at least a new section (13D) of the wellhead with disconnection and mixing of the operating module (20) to this well until the required number of wells is drilled, completed and put into production, it is possible with the operation module (20) finally located preferably in a separate (special) place on the bottom installation.
RU99113992/03A 1996-11-27 1997-11-21 System for offshore production of oil or gas (versions), ship, offshore bottom unit and method of application of said system RU2191888C2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NO965065 1996-11-27
NO965065A NO307210B1 (en) 1996-11-27 1996-11-27 Oil or gas extraction system

Publications (2)

Publication Number Publication Date
RU99113992A true RU99113992A (en) 2001-05-20
RU2191888C2 RU2191888C2 (en) 2002-10-27

Family

ID=19900118

Family Applications (1)

Application Number Title Priority Date Filing Date
RU99113992/03A RU2191888C2 (en) 1996-11-27 1997-11-21 System for offshore production of oil or gas (versions), ship, offshore bottom unit and method of application of said system

Country Status (8)

Country Link
US (1) US6213215B1 (en)
CN (1) CN1092279C (en)
AU (1) AU5418398A (en)
BR (1) BR9713293A (en)
GB (1) GB2337282B (en)
NO (1) NO307210B1 (en)
RU (1) RU2191888C2 (en)
WO (1) WO1998023846A1 (en)

Families Citing this family (45)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE69836261D1 (en) * 1998-03-27 2006-12-07 Cooper Cameron Corp Method and device for drilling multiple subsea wells
GB0100565D0 (en) * 2001-01-10 2001-02-21 2H Offshore Engineering Ltd Operating a subsea well
GB0124610D0 (en) * 2001-10-12 2001-12-05 Alpha Thames Ltd Early hydrocarbon extraction system
US6742594B2 (en) * 2002-02-06 2004-06-01 Abb Vetco Gray Inc. Flowline jumper for subsea well
US7011152B2 (en) 2002-02-11 2006-03-14 Vetco Aibel As Integrated subsea power pack for drilling and production
US6766860B2 (en) 2002-02-22 2004-07-27 Globalsantafe Corporation Multi-activity offshore drilling facility having a support for tubular string
US6880640B2 (en) * 2002-07-29 2005-04-19 Offshore Systems Inc. Steel tube flying lead jumper connector
BR0316177B1 (en) * 2002-11-12 2014-12-23 Vetco Gray Inc “Method for drilling and completing a plurality of subsea wells”
US20060004593A1 (en) * 2004-06-30 2006-01-05 Devon Energy Corporation Method and system for gathering, transporting and marketing offshore oil and gas
US7219740B2 (en) * 2004-11-22 2007-05-22 Energy Equipment Corporation Well production and multi-purpose intervention access hub
NO323495B1 (en) * 2005-01-06 2007-05-29 Aker Subsea As Well frame with manifold arrangement
GB2429990A (en) * 2005-09-07 2007-03-14 Keron Engineering Ltd Drilling guide frame assembly
GB2429992A (en) * 2005-09-09 2007-03-14 2H Offshore Engineering Ltd Production system
ATE519016T1 (en) * 2006-03-22 2011-08-15 Itrec Bv PRE-ASSEMBLY OF AN UNDERWATER BASE AND PIPING
GB2437526A (en) * 2006-04-27 2007-10-31 Multi Operational Service Tank A sub-sea well intervention vessel and method
CN103556946A (en) * 2006-11-07 2014-02-05 哈利伯顿能源服务公司 Drilling method
US8122965B2 (en) * 2006-12-08 2012-02-28 Horton Wison Deepwater, Inc. Methods for development of an offshore oil and gas field
US7921919B2 (en) * 2007-04-24 2011-04-12 Horton Technologies, Llc Subsea well control system and method
US20090078425A1 (en) * 2007-09-25 2009-03-26 Seahorse Equipment Corp Flexible hang-off arrangement for a catenary riser
GB2472713B (en) * 2008-06-03 2012-05-02 Shell Int Research Offshore drilling and production systems and methods
US7669660B1 (en) * 2008-11-26 2010-03-02 Floatec, Llc Riser disconnect and support mechanism
NO333681B1 (en) * 2009-01-08 2013-08-12 Aker Subsea As Underwater auxiliary compensator
BRPI0904467A2 (en) * 2009-11-16 2011-07-05 Paula Luize Facre Rodrigues subsurface line and equipment depressurization system and hydrate removal method
CN102947534B (en) * 2010-06-14 2015-04-29 国际壳牌研究有限公司 Subsea completions and well interventions using a vessel of opportunity
CA2804737A1 (en) * 2010-06-22 2011-12-29 Adrian Kaegi Method for fighting an oilspill in the aftermath of an underwater oil well blowout and installation for carrying out the method
EP2447798B1 (en) 2010-10-26 2014-07-23 Vetco Gray Controls Limited Testing a control system including a valve
NO334839B1 (en) * 2010-11-16 2014-06-16 Aker Subsea As Wellhead system and locking device for blowout protection
US8413724B2 (en) * 2010-11-30 2013-04-09 Hydril Usa Manufacturing Llc Gas handler, riser assembly, and method
CN103328756B (en) * 2010-12-13 2015-03-25 雪佛龙美国公司 Method, system and apparatus for deployment of umbilicals in subsea well operations
BE1019788A4 (en) * 2011-02-02 2012-12-04 Baggerwerken Decloedt & Zn N V SUCTION HEAD FOR A DREDGING SHIP AND METHOD FOR DRAGGING USING THIS SUCTION HEAD.
EP2702242A2 (en) * 2011-04-26 2014-03-05 BP Corporation North America Inc. Subsea accumulator system
FR2983233B1 (en) * 2011-11-30 2016-01-01 Saipem Sa INSTALLATION OF MULTI-FLEXIBLE FUND-SURFACE LINKS ON AT LEAST TWO LEVELS
EP2690249B1 (en) * 2012-07-25 2015-03-11 Vetco Gray Controls Limited Intervention workover control systems
NL2009677C2 (en) * 2012-10-22 2014-04-23 Itrec Bv A vessel including a drilling installation, and a method of drilling a well using the same.
WO2014070295A1 (en) * 2012-10-30 2014-05-08 Exxonmobil Upstream Research Company System for obstacle avoidance during hydrocarbon operations
CN102900403B (en) * 2012-11-01 2014-05-07 中国海洋石油总公司 Method for establishing artificial natural gas migration channel between gas reservoirs
CN102943654A (en) * 2012-11-01 2013-02-27 中国海洋石油总公司 Method for improving recovery efficiency of high-hydrocarbon-content gas deposit by high-CO2-content gas deposit
AU2015363810B2 (en) * 2014-12-19 2020-04-30 Equinor Energy As Subsea manifold system
EP3332086B1 (en) 2015-08-06 2021-01-06 National Oilwell Varco, L.P. Flow responsiveness enhancer for a blowout preventer
GB2549102A (en) * 2016-04-04 2017-10-11 Forsys Subsea Ltd Pipeline integrated manifold
NO342625B1 (en) * 2016-08-24 2018-06-25 Fmc Kongsberg Subsea As High-integrity pressure protection system and associated method
GB2564138B (en) * 2017-07-04 2020-03-11 Acergy France SAS Subsea manifolds
US11306557B2 (en) * 2017-10-23 2022-04-19 Fmc Technologies, Inc. Subsea tree with rotatable production outlet
CN108798608B (en) * 2018-07-26 2023-12-01 四川宏华石油设备有限公司 Natural gas hydrate exploitation system and method
CN113173501B (en) * 2021-04-16 2024-04-26 中海油深圳海洋工程技术服务有限公司 Turnover centering mechanism for vertical connector

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3327780A (en) 1965-03-15 1967-06-27 Exxon Production Research Co Connection of underwater wells
US3425270A (en) * 1965-08-24 1969-02-04 Friedmann & Maier Ag Test stand for fuel injection pumps
US3455270A (en) 1968-05-08 1969-07-15 Exxon Research Engineering Co Protective dome for underwater mooring swivel
US3656549A (en) * 1969-09-17 1972-04-18 Gray Tool Co Underwater completion system
US4024718A (en) * 1975-12-18 1977-05-24 The Offshore Company Subsea cable apparatus and method of handling same
US4192383A (en) * 1978-05-02 1980-03-11 Armco Inc. Offshore multiple well drilling and production apparatus
US4286665A (en) * 1979-04-24 1981-09-01 Deep Oil Technology, Inc. Apparatus and method for conducting offshore well operations
US4625806A (en) * 1979-09-26 1986-12-02 Chevron Research Company Subsea drilling and production system for use at a multiwell site
US4378848A (en) * 1979-10-02 1983-04-05 Fmc Corporation Method and apparatus for controlling subsea well template production systems
US4972907A (en) 1985-10-24 1990-11-27 Shell Offshore Inc. Method of conducting well operations from a moveable floating platform
EP0250069B1 (en) * 1986-06-20 1993-06-30 Conoco Inc. A deepwater floating drilling and production facility incorporating flexible production risers
NO171305C (en) 1987-05-04 1993-02-24 Abb Global Engineering As Ny ANCHORED ROTATING SUPPORT STRUCTURE INCLUDING DRILLING AND MAINTENANCE OF BURNER WITH RIG OR FLEXIBLE RISES FOR LIQUID PRODUCTION, STORAGE AND TRANSFER OF OIL AND GAS FROM A VESSEL TO THE SEA
US4819730A (en) 1987-07-24 1989-04-11 Schlumberger Technology Corporation Development drilling system
NO177778C (en) 1993-07-06 1995-11-22 Statoil As System for offshore production of hydrocarbons

Similar Documents

Publication Publication Date Title
RU99113992A (en) SYSTEM, SHIP, MARINE BOTTOM INSTALLATION AND METHOD FOR OIL OR GAS PRODUCTION
RU2191888C2 (en) System for offshore production of oil or gas (versions), ship, offshore bottom unit and method of application of said system
KR100626141B1 (en) Dual riser assembly deep water drilling methods and apparatus
KR100799958B1 (en) Subsea well intervention vessel
AU2005202612B2 (en) Dry tree subsea well communications apparatus and method using variable tension large offset risers
EP0277840B1 (en) Modular near-surface completion system
US5533574A (en) Dual concentric string high pressure riser
US4972907A (en) Method of conducting well operations from a moveable floating platform
US4934871A (en) Offshore well support system
US4576516A (en) Riser angle control apparatus and method
CN1255100A (en) Device by ship for production/test production of oil/gas from field below sealed level
US6520262B2 (en) Riser connector for a wellhead assembly and method for conducting offshore well operations using the same
KR100493347B1 (en) Subsea module
US4695190A (en) Pressure-balanced stab connection
CN1329622C (en) A method and device by a displacement tool
US4105068A (en) Apparatus for producing oil and gas offshore
CN101575946B (en) Linkage operation method of three derricks on ocean platform
NO171649B (en) DEVICE FOR PUMPING Borehole effluents
US20070251695A1 (en) Sub-sea well intervention vessel and method
NO177196B (en) Procedure for simultaneous execution of well operations from an offshore platform
Olijnik et al. Title Parque das Conchas (BC-10) Subsea Hardware and Artificial Lift Systems-Selection, Challenges and Lessons Learned
NO861411L (en) UNDERWATER EQUIPMENT FOR WORK EQUIPMENT.
CA1242971A (en) Method and means for storing a marine riser
Skeels et al. Detail design of a guidelineless subsea satellite completion
Gray et al. Design And Operating Experience With The Petrobras Enchova Template Production System