RU99110878A - METHOD FOR CONTROL POWER OF A DIRECT COMMUNICATION LINK INDEPENDENTLY TO CONTROL POWER OF A FEEDBACK LINK OF COMMUNICATION (OPTIONS) - Google Patents

METHOD FOR CONTROL POWER OF A DIRECT COMMUNICATION LINK INDEPENDENTLY TO CONTROL POWER OF A FEEDBACK LINK OF COMMUNICATION (OPTIONS)

Info

Publication number
RU99110878A
RU99110878A RU99110878/09A RU99110878A RU99110878A RU 99110878 A RU99110878 A RU 99110878A RU 99110878/09 A RU99110878/09 A RU 99110878/09A RU 99110878 A RU99110878 A RU 99110878A RU 99110878 A RU99110878 A RU 99110878A
Authority
RU
Russia
Prior art keywords
bts
received
power
reverse link
mobile station
Prior art date
Application number
RU99110878/09A
Other languages
Russian (ru)
Other versions
RU2179368C2 (en
Inventor
Ми-дзунг КАНГ
Original Assignee
Самсунг Электроникс Ко., Лтд.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1019980018790A external-priority patent/KR100288375B1/en
Application filed by Самсунг Электроникс Ко., Лтд. filed Critical Самсунг Электроникс Ко., Лтд.
Publication of RU99110878A publication Critical patent/RU99110878A/en
Application granted granted Critical
Publication of RU2179368C2 publication Critical patent/RU2179368C2/en

Links

Claims (13)

1. Способ управления мощностью прямой линии связи независимо от управления мощностью обратной линии связи в мобильной системе связи, когда состояние качества обратной линии связи определено как неудовлетворительное, что препятствует тем самым передаче о состоянии качества прямой линии связи на базовую приемопередающую станцию (БППС), включает в себя этапы:
(а) осуществляют оценку состояния качества прямой линии связи, осуществляемой БППС с использованием информации об управлении мощностью, при этом информация об управлении мощностью принимается от мобильной станции по указанной обратной линии связи до того, как состояние качества этой линии связи определено, как неудовлетворительное;
(b) определяют оптимальную информацию об управлении мощностью повторным осуществлением этапа оценки состояния качества прямой линии связи;
(с) определяют состояние качества прямой линии связи, как удовлетворительного или неудовлетворительного с использованием упомянутой оптимальной информации об управлении мощностью;
(d) осуществляют улучшение состояния качества прямой линии связи посредством управления мощностью передачи указанной БППС от этапа (с), когда состояние качества прямой линии связи определено, как неудовлетворительное;
(е) улучшают состояние качества обратной линии связи посредством улучшенной прямой линии связи.
1. A method for controlling forward link power regardless of reverse link power control in a mobile communication system when the reverse link quality state is determined to be unsatisfactory, thereby preventing transmission of the forward link quality state to the base transceiver station (BTS), includes in stages:
(a) an assessment of the quality state of the forward link carried out by the BTS using the power control information, wherein the power control information is received from the mobile station on the specified reverse link before the quality status of this link is determined to be unsatisfactory;
(b) determining optimal power control information by re-performing the step of evaluating the quality state of the forward link;
(c) determining the quality state of the forward link as satisfactory or unsatisfactory using said optimum power control information;
(d) carry out the improvement of the quality state of the forward link by controlling the transmit power of the specified BTS from step (c) when the quality state of the forward link is determined to be unsatisfactory;
(e) improve the quality state of the reverse link through an improved forward link.
2. Способ по п.1, в котором на указанном этапе оценки, БППС оценивает состояние качества указанной прямой линии связи посредством определения уровня прямой мощности передачи БППС, при этом определяют на:
(а) принимаются ли непрерывно обратные блоки со стиранием по указанной обратной линии связи;
(b) непрерывно ли повторно передаются сообщения указанной БППС через Уровень 2 в результате не приема сигнала Подтверждения (Подтв) для сообщений, которые были переданы в указанную мобильную станцию от БППС; и определяют, что
(с) при интенсивности ошибок прямых блоков равной нулю, интенсивность ошибок прямых блоков содержится в СОКИ, которые только что приняты от мобильной станции.
2. The method according to claim 1, in which at the indicated evaluation stage, the BTS evaluates the quality state of the specified forward link by determining the level of direct transmit power of the BTS, while determining on:
(a) whether reverse blocks are continuously received with erasure on the specified reverse link;
(b) whether the messages of the indicated BTS are continuously retransmitted through Level 2 as a result of not receiving the Confirm (Confirm) signal for messages that have been transmitted to the indicated mobile station from the BTS; and determine that
(c) when the error rate of the direct blocks is zero, the error rate of the direct blocks is contained in the SOKIs that have just been received from the mobile station.
3. Способ по п.2, в котором повышение прямой мощности передачи осуществляется, когда в результате указанного этапа оценки отсутствует ошибка в СОКИ, принятых преимущественно в течение самых последних N секундных интервалов и не было повторно передано сообщение в архив Подтв Уровня 2, иначе уменьшается прямая мощность передачи. 3. The method according to claim 2, in which the increase in the direct transmit power is carried out when, as a result of the indicated evaluation stage, there is no error in the RNSs received mainly during the most recent N second intervals and the message has not been retransmitted to the Confirm Level 2 archive, otherwise it decreases direct transmit power. 4. Способ по п. 2, в котором во время этапа определения уровня прямой мощности передачи осуществляют расчет контрольной мощности, когда возникает индикаторный разряд стирания (ИРС), учитывающий соотношение между контрольной мощностью и ИРС; и определение передающего значения первоначальной прямой мощности на основе расчетного контрольного уровня мощности в случае обратного стирания. 4. The method according to p. 2, in which during the stage of determining the level of direct transmit power, the control power is calculated when the indicator erase discharge (IRS) occurs, taking into account the ratio between the control power and the IRS; and determining a transmitting value of the initial forward power based on the calculated reference power level in case of back wiping. 5. Способ по п.4, также содержащий этап непрерывного повышения уровня прямой мощности передачи после указанного этапа определения. 5. The method according to claim 4, further comprising the step of continuously increasing the level of direct transmit power after said determining step. 6. Способ по п.5, в котором указанный этап улучшения состояния качества обратной линии связи также включает в себя этапы:
(с) осуществляют нормальный прием мобильной станцией разряда управления мощностью от БППС по указанной улучшенной обратной линии связи;
(d) улучшают состояние обратной линии связи с использованием указанного принятого разряда управления мощностью.
6. The method according to claim 5, wherein said step of improving the quality state of the reverse link also includes the steps of:
(c) carry out the normal reception by the mobile station of a discharge of power control from the BTS on said improved reverse link;
(d) improve the state of the reverse link using the specified received bit power control.
7. Способ управления мощностью прямой линии связи независимо от управления мощностью обратной линии связи, когда прямая линия связи и обратная линия связи определены как дефектные, при этом указанный способ включает в себя этапы:
(а) улучшают состояние качества прямой линии связи;
(b) передают разряд управления мощностью обратной линии связи на мобильную станцию по указанной улучшенной прямой линии связи;
(с) постепенно осуществляют улучшение состояния качества обратной линии связи мобильной станцией с использованием разряда управления мощностью обратной линии связи, при этом разряд управления мощностью принимается по улучшенной прямой линии связи;
(d) передают информацию о прямой линии связи в БППС по улучшенной обратной линии связи;
(е) осуществляют управление мощностью прямой линии связи с использованием информации о прямой линии связи, принятой по указанной улучшенной обратной линии связи.
7. A method for controlling forward link power regardless of reverse link power control when the forward link and reverse link are determined to be defective, wherein said method includes the steps of:
(a) improve the quality state of the forward link;
(b) transmitting the reverse link power control bit to the mobile station on said enhanced forward link;
(c) gradually improving the quality status of the reverse link by the mobile station using the reverse link power control bit, wherein the power control bit is received on the improved forward link;
(d) transmit forward link information to the BTS via an improved reverse link;
(e) carry out forward link power control using the forward link information received on said enhanced reverse link.
8. Способ по п.7, в котором указанный этап улучшения состояния качества прямой линии связи включает в себя этапы:
(а) осуществляют оценку состояния качества прямой линии связи указанной БППС и определяют
(1) принимают ли непрерывно обратные блоки со стиранием по указанной обратной линии связи;
(2) передают ли непрерывно и повторно БППС сообщения через Уровень 2,
(3) равна ли нулю интенсивность ошибок прямых блоков, введенная в сообщение о контрольном измерении (СОКИ), причем эти СОКИ являются теми СОКИ, которые были только что приняты от мобильной станции;
(b) осуществляют расчет контрольной мощности, когда возникает индикаторный разряд стирания (ИРС), и определяют величину прямой мощности передачи, основанной на расчетной контрольной мощности в случае, когда обратные блоки со стиранием непрерывно принимаются на указанном этапе оценки; и
(с) осуществляют непрерывное повышение величины прямой мощности передачи, когда обратные блоки со стиранием непрерывно принимаются на указанном этапе оценки, и после определения величины прямой мощности передачи и также с учетом эффективно используемого времени.
8. The method according to claim 7, wherein said step of improving the quality state of the forward link includes the steps of:
(a) assess the quality status of the direct communication line of the indicated BTS and determine
(1) whether reverse blocks are continuously received with erasure on said reverse link;
(2) whether the BTS continuously and repeatedly transmits messages through Level 2,
(3) whether the error rate of the direct blocks entered in the control measurement message (JUICE) is equal to zero, and these JUICE are those JUICE that have just been received from the mobile station;
(b) calculating the reference power when an erasure indicator discharge (IRS) occurs, and determining a forward transmit power based on the estimated reference power in the case where the erased return blocks are continuously received at the indicated evaluation stage; and
(c) carry out a continuous increase in the magnitude of the direct transmit power when the return blocks with erasure are continuously received at the indicated evaluation stage, and after determining the magnitude of the direct transmit power and also taking into account the effectively used time.
9. Способ по п.8, в котором указанный этап улучшения состояния качества обратной связи также включает в себя этапы:
(а) осуществляют прием мобильной станцией в нормальном режиме разряда управления мощностью от БППС по указанной улучшенной обратной линии связи;
(b) улучшают состояние обратной линии связи с использованием принятого разряда управления мощностью.
9. The method of claim 8, wherein said step of improving the quality of the feedback quality also includes the steps of:
(a) receiving a mobile station in normal mode discharge power control from the BTS on the specified improved reverse link;
(b) improving the state of the reverse link using the received power control bit.
10. Способ управления мощностью прямой линии связи независимо от управления мощностью обратной линии связи включает в себя этапы:
(а) осуществляют повторное измерение уровня контрольного сигнала, принятого от базовой приемопередающей станции (БППС) и повторно передают мобильной станцией в указанную БППС указанный измеренный уровень контрольного сигнала и интенсивность ошибок прямых блоков посредством сообщения о контрольных измерениях (СОКИ) по прямой линии связи;
(b) определяют мобильной станцией, принято ли подтверждающее сообщение от БППС до истечения заданного временного интервала, если подтверждение для данного сообщения не принято от мобильной станции после истечения указанного заданного временного интервала, повторно передают указанное сообщение мобильной станции на Уровень 2;
(с) подтверждают мобильной станцией, возник ли блок со стиранием на прямой линии связи и передачи ИРС (индикаторного разряда стирания) по обратной линии связи в БППС, если блок со стиранием возник на прямой линии связи;
(d) осуществляют подтверждение указанной БППС, возник ли блок со стиранием на обратной линии связи после того, как БППС приняла по меньшей мере одно СОКИ и указанный ИРС от упомянутой мобильной станции;
(е) на основе указанного подтверждающего этапа (d), если блок со стиранием возник на обратной линии связи, осуществляют управление мощностью прямой линии связи указанной БППС с использованием СОКИ и архива Подтв, при этом упомянутые СОКИ являются теми, которые приняты от мобильной станции перед тем, как возник упомянутый блок со стиранием, при этом упомянутый архив Подтв возникает в Уровне 2 указанной мобильной станции и указанной БППС;
(f) на основе упомянутого подтверждающего этапа (d), если блок со стиранием не возник на обратной линии связи, осуществляют управление мощностью прямой линии связи указанной БППС с использованием упомянутого ИРС, принятого от упомянутой мобильной станции.
10. The forward link power control method, regardless of reverse link power control, includes the steps of:
(a) carry out re-measurement of the level of the control signal received from the base transceiver station (BTS) and retransmit by the mobile station to the indicated BPS the indicated measured level of the control signal and the error rate of the direct blocks by means of the message about the control measurements (SOKI) via a direct communication line;
(b) determining by the mobile station whether a confirmation message has been received from the BTS before the expiration of a predetermined time interval, if an acknowledgment for this message has not been received from the mobile station after the expiration of the specified predetermined time interval, retransmit the indicated message to the mobile station to Level 2;
(c) confirm by the mobile station whether the block with erasure on the direct communication line and transmitting IRS (indicator discharge erase) on the reverse communication line to the BTS has arisen if the block with erasure has arisen on the direct communication line;
(d) confirming said BTS whether a block has been erased on the reverse link after the BTS has received at least one SOKI and said IRS from said mobile station;
(e) on the basis of the indicated confirmation step (d), if the block with the erasure occurred on the reverse link, control the power of the forward link of the indicated BTS using the SOKI and the Confirm archive, while the said SOKIs are those received from the mobile station before how the mentioned block with erasure originated, while the said Confirm archive appears in Level 2 of the indicated mobile station and the indicated BTS;
(f) on the basis of said confirming step (d), if the erasure unit does not occur on the reverse link, the forward link power of said BTS is controlled using said IRS received from said mobile station.
11. Способ по п.10, в котором, если блок со стиранием возник на обратной линии связи, основываясь на указанном подтверждающем этапе, то этап управления мощностью прямой линии связи указанной БППС также включает в себя этапы:
(а) осуществляют подтверждение, не введена ли интенсивность ошибок блоков, превышающая заданный уровень, в СОКИ, принятые в течение последних N секунд и не передала ли их повторно БППС в архив Подтв Уровня 2;
(b) повышают мощность передачи со стороны БППС, если интенсивность ошибок блока, которая превышает заданный уровень, не введена в СОКИ, принятые в течение последних N секунд и в БППС отсутствует их повторная передача в архив Подтв Уровня 2;
(с) осуществляют уменьшение мощности передачи со стороны БППС, если интенсивность ошибок блоков, превышающая заданный уровень, введена в СОКИ, принятые в течение последних N секунд и БППС повторно передала их в архив Подтв Уровня 2.
11. The method according to claim 10, in which, if the block with the erasure occurred on the reverse link, based on the specified confirmation step, the step of controlling the power of the forward link of the specified BTS also includes the steps of:
(a) they confirm whether the error rate of the blocks, exceeding the specified level, has been entered into the SOKIs received within the last N seconds and if they have not been transferred by the BTS again to the Confirm Level 2 archive;
(b) increase the transmit power from the side of the BTS if the error rate of a block that exceeds a predetermined level is not entered into the JUPS received within the last N seconds and there is no their retransmission to the BTS of the Level 2 Confirm archive;
(c) the transmission power is reduced by the BTS if the error rate of the blocks, exceeding the specified level, is entered into the JUPS received within the last N seconds and the BTS retransmitted them to the Subtit Level 2 archive.
12. Способ по п.11, в котором, если блок со стиранием возник на обратной линии связи, основываясь на указанном подтверждающем этапе, этап осуществления управления мощностью прямой линии связи со стороны указанной БППС также включает в себя этапы:
(а) определяют начальную мощность передачи БППС в связи с тем, что возник блок со стиранием;
(b) ожидают в течение заданного временного интервала после определения начальной мощности передачи БППС;
(с) подтверждают, возник ли плохой блок в сообщениях, принятых по обратной линии связи, от мобильной станции после того, как истек указанный заданный временной интервал;
(d) повышают указанную определенную начальную мощность передачи БППС на заданную величину в случае, когда блок плохого качества возник на обратной линии связи, даже после того, как истекло указанное эффективно используемое время.
12. The method according to claim 11, in which, if the block with the erasure occurred on the reverse link, based on the specified confirmation step, the step of controlling the power of the forward link from the specified BTS also includes the steps of:
(a) determine the initial transmit power of the BTS in connection with the fact that there was a block with erasure;
(b) wait for a predetermined time interval after determining the initial transmit power of the BTS;
(c) confirm whether a bad block has occurred in messages received on the reverse link from the mobile station after the specified predetermined time interval has elapsed;
(d) increase the specified specific initial transmit power of the BTS by a predetermined value in the case when the block of poor quality occurred on the reverse link, even after the specified effective time has elapsed.
13. Способ по любому из пп. 10 - 12, в котором блок со стиранием не возник на обратной линии связи, основываясь на указанном подтверждающем этапе, при этом этап осуществления управления мощностью прямой линии связи также включает в себя этапы:
(а) повышают мощность передачи со стороны указанной БППС, если ИРС был установлен на 1, при этом ИРС принимается от мобильной станции;
(b) уменьшают мощность передачи со стороны БППС, если ИРС был установлен на 0.
13. The method according to any one of paragraphs. 10 to 12, in which the block with the erasure did not occur on the reverse link, based on the specified confirmation step, while the step of performing forward link power control also includes the steps of:
(a) increase the transmit power from the indicated BTS, if the IRS was set to 1, while the IRS is received from the mobile station;
(b) reduce the transmit power from the BTS if the IRS has been set to 0.
RU99110878/09A 1998-05-25 1999-05-24 Method of control over power of direct communication line independent of control over power of feedback communication line in mobile communication system ( variants ) RU2179368C2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1998-18790 1998-05-25
KR1019980018790A KR100288375B1 (en) 1998-05-25 1998-05-25 A method for controlling forward link power which is independent of reverse link

Publications (2)

Publication Number Publication Date
RU99110878A true RU99110878A (en) 2001-02-20
RU2179368C2 RU2179368C2 (en) 2002-02-10

Family

ID=19537697

Family Applications (1)

Application Number Title Priority Date Filing Date
RU99110878/09A RU2179368C2 (en) 1998-05-25 1999-05-24 Method of control over power of direct communication line independent of control over power of feedback communication line in mobile communication system ( variants )

Country Status (4)

Country Link
US (1) US6397043B1 (en)
KR (1) KR100288375B1 (en)
CN (1) CN1319289C (en)
RU (1) RU2179368C2 (en)

Families Citing this family (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8670405B1 (en) 1999-06-09 2014-03-11 Cellco Partnership Mobile internet protocol square
KR100641769B1 (en) * 1999-08-31 2006-11-13 유티스타콤코리아 유한회사 Forward direction power control method by using reverse direction power control part channel of mobile communication system
US7170866B2 (en) * 1999-12-08 2007-01-30 Cello Partnership Quality of service enhancements for wireless communications systems
JP2001251236A (en) * 2000-03-06 2001-09-14 Matsushita Electric Ind Co Ltd Communications equipment
US6781973B1 (en) * 2000-03-30 2004-08-24 Matsushita Electric Industrial Co., Ltd. Combined signaling and sir inner-loop power control
US6754506B2 (en) * 2000-06-13 2004-06-22 At&T Wireless Services, Inc. TDMA communication system having enhanced power control
US6810246B1 (en) * 2000-10-23 2004-10-26 Verizon Laboratories Inc. Method and system for analyzing digital wireless network performance
US6718180B1 (en) * 2000-10-24 2004-04-06 Telefonaktiebolaget Lm Ericsson (Publ) Power level convergence in a communications system
ATE488064T1 (en) 2001-03-21 2010-11-15 Lg Electronics Inc RETRANSMISSION OF DATA THROUGH A REVERSE LINK IN A PACKET DATA TRANSMISSION SYSTEM WITH AUTOMATIC REPOST REQUEST
US8189556B2 (en) 2001-03-21 2012-05-29 Lg Electronics Inc. Packet transmitting method in mobile communication system
KR100873117B1 (en) * 2001-09-10 2008-12-09 엘지전자 주식회사 Method for retransmitting by using Hybrid Automatic Repeat Request
JP3943028B2 (en) * 2001-03-26 2007-07-11 サムスン エレクトロニクス カンパニー リミテッド Transmission control method for reverse link in mobile communication system
KR100547893B1 (en) * 2001-10-30 2006-02-01 삼성전자주식회사 Method and apparatus for power control of reverse channels in mobile communication system
KR20030052038A (en) * 2001-12-20 2003-06-26 엘지전자 주식회사 Method for handoff in high data rate networks
JP3574446B2 (en) * 2002-09-19 2004-10-06 松下電器産業株式会社 Transmission power control method and base station apparatus
US6782272B2 (en) * 2002-10-09 2004-08-24 Motorola, Inc. Network control having selective reverse mobile frame biasing
US8396431B2 (en) * 2005-02-17 2013-03-12 Kyocera Corporation Mobile station traffic state antenna tuning systems and methods
JP4697525B2 (en) * 2005-04-20 2011-06-08 ソニー株式会社 Transmission / reception system, transmission apparatus and transmission method, reception apparatus and reception method, and program
US7774014B2 (en) * 2005-08-26 2010-08-10 Alcatel-Lucent Usa Inc. Reducing call drops in spread spectrum wireless communication systems
US20070177544A1 (en) * 2006-01-27 2007-08-02 Dongzhe Cui Using the repetition of an erasure indicator bit to enhance a power control command during handoff
US7852810B1 (en) * 2007-01-03 2010-12-14 Sprint Spectrum L.P. Dynamic adjustment of forward-link frame-error-rate (FFER) target
US20080159199A1 (en) * 2007-01-03 2008-07-03 Motorola, Inc. System and method for managing forward channel access using a reverse channel
US8767839B2 (en) * 2007-01-22 2014-07-01 Qualcomm Incorporated Error filter to differentiate between reverse link and forward link video data errors
US7813323B1 (en) 2007-06-13 2010-10-12 Sprint Spectrum L.P. Dynamic adjustment of reverse-link frame-error-rate (RFER) target based on reverse-link RF conditions
US8107988B1 (en) 2008-07-25 2012-01-31 Sprint Spectrum L.P. Conducting power control based on reverse-link RF conditions
US8477686B1 (en) 2009-09-10 2013-07-02 Sprint Spectrum L.P. Automatic increase of target frame error rate for duration based on call drop timer
US8537700B1 (en) 2010-04-19 2013-09-17 Sprint Spectrum L.P. Identifying and selectively controlling reverse-noise contribution on a per-access-terminal basis
US8290532B1 (en) 2010-04-19 2012-10-16 Sprint Spectrum L.P. Selectively conducting reverse-link power control and call admission control
JP5780357B2 (en) * 2012-03-30 2015-09-16 富士通株式会社 Wireless device and communication method
CN105898686B (en) * 2016-06-12 2019-09-24 成都信息工程大学 A kind of method and user equipment of Radio Link Failure recovery

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6157668A (en) * 1993-10-28 2000-12-05 Qualcomm Inc. Method and apparatus for reducing the average transmit power of a base station
JP3305877B2 (en) * 1994-06-23 2002-07-24 株式会社東芝 Spread spectrum wireless communication system and wireless communication device used in this system
US5778030A (en) * 1996-03-15 1998-07-07 Motorola, Inc. Method and apparatus for power control in a communication system
JP2734448B2 (en) * 1996-07-31 1998-03-30 日本電気株式会社 Base station transmission power control method
US6075974A (en) * 1996-11-20 2000-06-13 Qualcomm Inc. Method and apparatus for adjusting thresholds and measurements of received signals by anticipating power control commands yet to be executed
US5896411A (en) * 1997-05-05 1999-04-20 Northern Telecom Limited Enhanced reverse link power control in a wireless communication system
US6259927B1 (en) * 1997-06-06 2001-07-10 Telefonaktiebolaget Lm Ericsson Transmit power control in a radio communication system
JP3019061B2 (en) * 1997-06-27 2000-03-13 日本電気株式会社 Mobile communication system and radio channel control method therefor
US6160999A (en) * 1997-08-18 2000-12-12 Nortel Networks Limited Wireless communication system providing improved forward link management and method of operation
US6181738B1 (en) * 1998-02-13 2001-01-30 Northern Telecom Limited Reverse link power control using a frame quality metric
US6144841A (en) * 1998-03-10 2000-11-07 Nortel Networks Corporation Method and system for managing forward link power control within a code-division multiple access mobile telephone communication network
US6058107A (en) * 1998-04-08 2000-05-02 Motorola, Inc. Method for updating forward power control in a communication system
US6148208A (en) * 1998-12-21 2000-11-14 Motorola, Inc. Power control within a broad-band communication system

Similar Documents

Publication Publication Date Title
RU99110878A (en) METHOD FOR CONTROL POWER OF A DIRECT COMMUNICATION LINK INDEPENDENTLY TO CONTROL POWER OF A FEEDBACK LINK OF COMMUNICATION (OPTIONS)
RU2179368C2 (en) Method of control over power of direct communication line independent of control over power of feedback communication line in mobile communication system ( variants )
CN109194451B (en) Data reissue method of vehicle-mounted terminal and vehicle-mounted terminal
EP1309121B1 (en) Variable rate channel quality feedback in a wireless communication system
CA2363652A1 (en) Method and system for control signalling enabling flexible link adaption in a radiocommunication system
EP1135869B1 (en) System and method to combine power control commands during soft handoff in ds/cdma cellular systems
US6983164B2 (en) Method of automatically controlling transmission power of wireless communication apparatus, and storage medium on which the same is stored
RU99110947A (en) METHOD AND APPARATUS FOR IMPLEMENTING A QUICK RESET IN THE POWER CONTROL SYSTEM OF THE DIRECT LINK OF THE CELLULAR PHONE SYSTEM
EP1195936A1 (en) Wireless communication device and wireless communication method
US8116829B2 (en) Radio station and method of operating a radio station
EP1207646A1 (en) Data transmission apparatus and data transmission method
US6249894B1 (en) Method for determining a need to retransmit a message in a communication system
US20030185175A1 (en) Channel quality measurement in data transmission using hybrid arq
RU99107572A (en) METHOD AND DEVICE FOR PERFORMING DISTRIBUTED DIRECT POWER MANAGEMENT
KR20070018936A (en) Arq communication system and method with acknowledgement mapping
EP1173995B1 (en) Apparatus, and associated method, for selectively permitting initiation of cell reselection in a radio communication system
EP0625863A2 (en) Dual stage RSSI handoff trigger
JP2004040315A (en) Receiver and communication method
RU2005133200A (en) INTERACTIVE METHOD FOR TRANSMITTING A LOCATION REPORT TO TARGET USER EQUIPMENT IN THE LOCATION SERVICE
US6912213B2 (en) Reverse power control method of data transmission for wireless local loop
JP4015877B2 (en) Mobile communication system and radio communication control method
EP1394979B1 (en) Method and apparatus for dynamically managing the packet segment threshold according to the state of the channel
EP1357696A1 (en) Method to measure the Block Error Rate in a radio telecommunications network
JP2796441B2 (en) Communication device
KR100546608B1 (en) Method for controlling power in communication system