RU96112275A - METHOD FOR PROCESSING THE BOREHOLE ZONE OF THE STRING AND THE DEVICE FOR ITS IMPLEMENTATION - Google Patents

METHOD FOR PROCESSING THE BOREHOLE ZONE OF THE STRING AND THE DEVICE FOR ITS IMPLEMENTATION

Info

Publication number
RU96112275A
RU96112275A RU96112275/03A RU96112275A RU96112275A RU 96112275 A RU96112275 A RU 96112275A RU 96112275/03 A RU96112275/03 A RU 96112275/03A RU 96112275 A RU96112275 A RU 96112275A RU 96112275 A RU96112275 A RU 96112275A
Authority
RU
Russia
Prior art keywords
formation
zone
packer
rod
channel
Prior art date
Application number
RU96112275/03A
Other languages
Russian (ru)
Other versions
RU2123591C1 (en
Inventor
М.М. Аглиуллин
А.С. Курмаев
Р.Х. Рахматуллин
М.М. Абдуллин
Original Assignee
Акционерное общество открытого типа "РИАЛ-Нефтехим, Ко"
Filing date
Publication date
Application filed by Акционерное общество открытого типа "РИАЛ-Нефтехим, Ко" filed Critical Акционерное общество открытого типа "РИАЛ-Нефтехим, Ко"
Priority to RU96112275A priority Critical patent/RU2123591C1/en
Priority claimed from RU96112275A external-priority patent/RU2123591C1/en
Application granted granted Critical
Publication of RU2123591C1 publication Critical patent/RU2123591C1/en
Publication of RU96112275A publication Critical patent/RU96112275A/en

Links

Claims (3)

1. Способ обработки прискважинной зоны пласта, включающий, испытание пласта путем герметизации интервала перфорации пласта, вызова притока, восстановления пластового давления с контролем текущих давлений и определением гидродинамических параметров пласта, одновременное физическое и импульсное депрессионно-репрессионное воздействие на прискважинную зону пласта с отбором из пласта продуктов обработки, повторное испытание пласта для оценки эффективности воздействий с удалением из скважины продуктов обработки, отличающийся тем, что о степени очистки прискважинной зоны пласта судят по изменению гидропроводности пласта при депрессионном воздействии, причем гидропроводность определяют для ближней зоны пласта за минимальный временной интервал в начале депрессионного воздействия, а одновременное воздействие осуществляют до стабилизации величины гидропроводности ближней зоны, и режим депрессионно-репрессионного воздействия подбирается таким образом, что объем жидкости отбираемой из пласта при депрессии в процессе обработки до стабилизации гидропроводности ближней зоны равен объему жидкости задавливаемого в пласт при репрессии, а после стабилизации гидропроводности ближней зоны отбираемый объем устанавливается больше задавливаемого объема.1. The method of processing the borehole zone of the formation, including testing the formation by sealing the interval of perforation of the formation, inflow, restoring the reservoir pressure with monitoring current pressures and determining the hydrodynamic parameters of the formation, simultaneous physical and pulsed depression-repression effects on the borehole zone of the formation with selection from the formation treatment products, repeated testing of the formation to assess the effectiveness of impacts with removal of treatment products from the well, characterized in that about the degree of purification of the near-wellbore zone of the formation is judged by the change in the hydraulic conductivity of the formation during a depressive effect, and the hydraulic conductivity is determined for the near zone of the formation for a minimum time interval at the beginning of the depressive effect, and the simultaneous effect is carried out until the value of the hydraulic conductivity of the near-field zone is stabilized, and the mode of depressive-repressive action is selected in this way that the volume of fluid taken from the reservoir during depression during processing until stabilization of the hydraulic conductivity is near of the first zone is equal to the volume of fluid squeezed into the reservoir during repression, and after stabilization of the hydraulic conductivity of the near zone, the selected volume is set larger than the crushed volume. 2. Устройство для обработки прискважинной зоны пласта способом по п. 1, содержащее комплект пластоиспытательного оборудования в составе последовательно соединенных снизу - вверх фильтра, пакерно-якорного узла, уравнительного клапана и впускного клапана золотникового типа с радиальными входными и выходными отверстиями, сливного клапана, труб до устья скважины, контейнер с устройством для физического воздействия на прискважинную зону пласта, размещенный под фильтром, дистанционные приборы для контроля давлений выше и ниже пакера, электроконтактный разъем для стыковки дистанционных приборов и устройства для физико-химического воздействия с наземными устройствами посредством кабеля, спускаемого внутри насосно-компрессорных труб, состоящее из контактного наконечника в глубинной части и ответной розетки на кабеле, отличающееся тем, что все узлы оборудования выполнены со сквозными каналами, манометр для контроля давления ниже пакера размещен в сквозном канале под впускным клапаном, а манометр для контроля давления выше пакера в трубах размещен на кабеле над электроконтактным разъемом, в сквозном канале впускного клапана размещен электропереходник, выполненный извлекаемым без разборки клапана, состоящий из контактного наконечника с контактными кольцевыми электродами и изоляторами, стандартного геофизического наконечника, стержня и втулки с уплотнительными элементами, размещенной между входными и выходными отверстиями впускного клапана и разделяющей сквозные каналы оборудования на подпакерную и надпакерную зоны, стержень проходит по оси втулки через герметичное соединение, причем длина стержня равна длине впускного клапана, диаметр много меньше диаметра сквозного канала, стержень выполнен со сквозным каналом, содержащим электропроводку, соединяющую контактный и геофизической наконечники, подсоединенные к стержню в верхней и нижней его частях соответственно, причем герметизация сквозного канала стержня осуществляется элементами контактного наконечника, а диаметр контактного наконечника равен или меньше наружного диаметра стержня, геофизической наконечник подключен к манометру для контроля давления ниже пакера и через него к устройству для физической обработки пласта, а контактный наконечник содержит центрирующую шайбу со сквозными отверстиями для пропуска жидкости и находится в жидкостной среде из растворителя асфальтосмолистопарафиновых отложений. 2. The device for processing the borehole zone of the formation by the method according to claim 1, containing a set of reservoir testing equipment consisting of a filter, a packer-anchor assembly, a balancing valve and a spool type inlet valve with radial inlet and outlet openings, a drain valve, pipes to the wellhead, a container with a device for physical impact on the borehole zone of the formation, located under the filter, remote instruments for monitoring pressures above and below the packer, electric contact connector for docking remote devices and devices for physico-chemical treatment with ground-based devices via a cable running inside the tubing, consisting of a contact tip in the deep part and a mating socket on the cable, characterized in that all components of the equipment are made with through channels , a pressure gauge to control the pressure below the packer is placed in the through channel under the inlet valve, and a pressure gauge to control the pressure above the packer in the pipes is placed on the cable above the electrical circuit a plug, in the through channel of the inlet valve there is an electrical adapter made removable without disassembling the valve, consisting of a contact tip with contact ring electrodes and insulators, a standard geophysical tip, a rod and a sleeve with sealing elements located between the inlet and outlet openings of the inlet valve and separating the through channels of equipment to the under-packer and over-packer zones, the rod passes along the axis of the sleeve through a tight connection, and the length of the rod p along the length of the inlet valve, the diameter is much smaller than the diameter of the through channel, the rod is made with a through channel containing electrical wiring connecting the contact and geophysical tips connected to the rod in its upper and lower parts, respectively, and the through channel of the rod is sealed with contact tip elements, and the diameter the contact tip is equal to or less than the outer diameter of the rod, the geophysical tip is connected to a pressure gauge to control the pressure below the packer and through it to the device for physical processing of the formation, and the contact tip contains a centering washer with through holes for fluid passage and is in a liquid medium from a solvent of asphalt-resin-paraffin deposits. 3. Устройство по п. 2, отличающееся тем, что устройство для физического воздействия выполнено в виде термоисточника с электроподводом, контейнер содержит в верхней части боковые каналы, фильтр и контейнер разобщены установленным между ними электрогермовводом, а выше фильтра установлена буферная емкость. 3. The device according to claim 2, characterized in that the device for physical impact is made in the form of a heat source with electric supply, the container contains side channels in the upper part, the filter and the container are disconnected by the installed electric hermetic inlet, and a buffer tank is installed above the filter.
RU96112275A 1996-06-18 1996-06-18 Method and device for treating bottom-hole zone of bed RU2123591C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU96112275A RU2123591C1 (en) 1996-06-18 1996-06-18 Method and device for treating bottom-hole zone of bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU96112275A RU2123591C1 (en) 1996-06-18 1996-06-18 Method and device for treating bottom-hole zone of bed

Publications (2)

Publication Number Publication Date
RU2123591C1 RU2123591C1 (en) 1998-12-20
RU96112275A true RU96112275A (en) 1999-03-20

Family

ID=20182068

Family Applications (1)

Application Number Title Priority Date Filing Date
RU96112275A RU2123591C1 (en) 1996-06-18 1996-06-18 Method and device for treating bottom-hole zone of bed

Country Status (1)

Country Link
RU (1) RU2123591C1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8607864B2 (en) * 2008-02-28 2013-12-17 Schlumberger Technology Corporation Live bottom hole pressure for perforation/fracturing operations
RU2584168C1 (en) * 2014-10-20 2016-05-20 Открытое акционерное общество Научно-производственная фирма "Геофизика" (ОАО НПФ "Геофизика") Method of non-contact well telemetry and telemetric system for its implementation
RU2583804C1 (en) * 2015-04-01 2016-05-10 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Device for pulse action on reservoir
RU2613396C1 (en) * 2016-02-17 2017-03-16 Общество с ограниченной ответственностью "Научно-производственное предприятие "Горизонт" Downhole pulsator to create positive pressure impulses in the flashing fluid
RU2697339C1 (en) * 2018-10-01 2019-08-13 Федеральное государственное бюджетное образовательное учреждение высшего образования "Уфимский государственный нефтяной технический университет" Method of extraction of shale oil

Similar Documents

Publication Publication Date Title
US2703621A (en) Oil well bottom hole flow increasing unit
US7252141B2 (en) Groundwater sampling device
US4619323A (en) Method for conducting workover operations
US2217857A (en) Process for the removal of mud sheaths
US4430889A (en) Dynamic fluid testing apparatus and method
DE69511254D1 (en) METHOD AND DEVICE FOR SEPARATING OIL AND WATER USING A CENTRIFUGAL ALCOHOLER WITH TWO ELECTRODES
US11346186B2 (en) Oil recovery tool and system
RU96112275A (en) METHOD FOR PROCESSING THE BOREHOLE ZONE OF THE STRING AND THE DEVICE FOR ITS IMPLEMENTATION
RU2261986C1 (en) Method for complex well bottom zone treatment
EA005687B1 (en) Method for operating a well jet device during cleaning of the downhole area of a formation and device for carrying out said method
RU2679406C1 (en) Method of controlled pumping down to formations and device for its implementation
RU2123591C1 (en) Method and device for treating bottom-hole zone of bed
US2454740A (en) Apparatus for treating wells
US3550444A (en) Apparatus for testing a well without interrupting flow therefrom
RU2101468C1 (en) Device for removing hydrateparaffine deposits
RU2516303C2 (en) Device for thermal processing of hydrated gas accumulation
US1169261A (en) Cleaning oil-wells.
RU2282018C1 (en) Device for heat well bottom zone treatment
SU1164377A1 (en) Deep-well three-electrode heater
US1409346A (en) Method and apparatus for removing water from wells
SU977691A1 (en) Method for washing sand plugs in well
SU750045A1 (en) Water well reclaiming method
RU2012760C1 (en) Device for ice full-hole drilling
SU912917A1 (en) Device for working bottom-adjoining area of boreholes
RU2063558C1 (en) Method of starting well pump unit and pressure testing device for its realization