Method for forming isolating curtain around mine working

Info

Publication number
RU94041858A
RU94041858A RU94041858/03A RU94041858A RU94041858A RU 94041858 A RU94041858 A RU 94041858A RU 94041858/03 A RU94041858/03 A RU 94041858/03A RU 94041858 A RU94041858 A RU 94041858A RU 94041858 A RU94041858 A RU 94041858A
Authority
RU
Russia
Prior art keywords
wells
curtain
mining
stage
forming
Prior art date
Application number
RU94041858/03A
Other languages
Russian (ru)
Other versions
RU2075572C1 (en
Inventor
А.Е. Пережилов
Ru]
Е.Я. Диколенко
Д.А. Пережилов
Й. Кожа
А.Ф. Авдеев
А.С. Шифрина
Г.Ф. Чупановский
Cs]
Original Assignee
Пережилов А.Е. (RU)
А.Е. Пережилов
Диколенко Е.Я. (RU)
Е.Я. Диколенко
Пережилов Д.А. (RU)
Д.А. Пережилов
Лушникова О.Ю. (RU)
Лушникова О.Ю.
Йозеф Кожа (CS)
Йозеф Кожа
Авдеев А.Ф. (RU)
А.Ф. Авдеев
Лушников Л.Л. (RU)
Лушников Л.Л.
Шифрина А.С. (RU)
А.С. Шифрина
Чупановский Г.Ф. (RU)
Г.Ф. Чупановский
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Пережилов А.Е. (RU), А.Е. Пережилов, Диколенко Е.Я. (RU), Е.Я. Диколенко, Пережилов Д.А. (RU), Д.А. Пережилов, Лушникова О.Ю. (RU), Лушникова О.Ю., Йозеф Кожа (CS), Йозеф Кожа, Авдеев А.Ф. (RU), А.Ф. Авдеев, Лушников Л.Л. (RU), Лушников Л.Л., Шифрина А.С. (RU), А.С. Шифрина, Чупановский Г.Ф. (RU), Г.Ф. Чупановский filed Critical Пережилов А.Е. (RU)
Priority to RU94041858A priority Critical patent/RU2075572C1/en
Publication of RU94041858A publication Critical patent/RU94041858A/en
Application granted granted Critical
Publication of RU2075572C1 publication Critical patent/RU2075572C1/en

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

FIELD: mining. SUBSTANCE: method for forming isolating curtain around mine working in inter-well space includes drilling injection wells and stage-by-stage pumping of grout. Continuous recording of a number of process parameters in the course of curtain forming is provided. On completion of pumping design volume of grout in water bearing horizon average value of coefficient of absorbing capacity of each well is calculated. Values are compared to each other. Quality of isolating curtain is good if value of the above coefficients for wells grouted at final stage of isolating curtain forming is below coefficient values for wells grouted at initial and intermediate stages of curtain forming. EFFECT: simplicity in realization, possibility of on-line monitoring, reliability, and high safety of working.

Claims (1)

Изобретение относится к горному делу и может быть использовано для создания благоприятных горно-геологических условий при строительстве и эксплуатации горных выработок. Способ формирования изоляционной завесы вокруг горных выработок в межскважинном пространстве включает бурение нагнетательных скважин и стадийное нагнетание тампонажного раствора, предусматривает непрерывную регистрацию ряда технологических параметров в ходе формирования завесы. После закачки в породы водоносного горизонта через скважины очередной стадии проектного объема тампонажного раствора рассчитывают среднее значение коэффициента поглотительной способности каждой скважины. Значения их сравнивают между собой, при этом качество изоляционной завесы является удовлетворительным, если значения упомянутых коэффициентов для скважин, затампонированных на конечной стадии формирования изоляционной завесы, ниже значений коэффициентов для скважин, затампонированных на начальной и промежуточной стадиях формирования этой завесы. Способ характеризуется простотой реализации, оперативностью контроля, основанного непосредственно на параметрах стадийного выполнения работ, надежностью и высокой степенью безопасности ведения горных работ в сложных гидрогеологических условиях, низкими затратами из-за отсутствия необходимости бурения дополнительных контрольных скважин и разбуривания затампонированных скважин, а также из-за низкого объема исследовательского цикла работ.The invention relates to mining and can be used to create favorable mining and geological conditions in the construction and operation of mining. The method of forming an insulating curtain around the mine workings in the interwell space includes drilling injection wells and stage injection of cement slurry, provides for the continuous recording of a number of technological parameters during the formation of the curtain. After injection into the rocks of the aquifer through the wells of the next stage of the design volume of the cement slurry, the average value of the coefficient of absorption capacity of each well is calculated. Their values are compared with each other, while the quality of the insulation curtain is satisfactory if the values of the mentioned coefficients for wells plugged at the final stage of formation of the insulation curtain are lower than the coefficients for wells plugged at the initial and intermediate stages of formation of this curtain. The method is characterized by ease of implementation, control efficiency based directly on the parameters of the staged work, reliability and a high degree of safety of mining operations in difficult hydrogeological conditions, low costs due to the lack of the need to drill additional control wells and drill tamped wells, as well as due to low volume of the research cycle.
RU94041858A 1994-11-22 1994-11-22 Method of forming isolation curtain around mine workings RU2075572C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU94041858A RU2075572C1 (en) 1994-11-22 1994-11-22 Method of forming isolation curtain around mine workings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU94041858A RU2075572C1 (en) 1994-11-22 1994-11-22 Method of forming isolation curtain around mine workings

Publications (2)

Publication Number Publication Date
RU94041858A true RU94041858A (en) 1996-06-10
RU2075572C1 RU2075572C1 (en) 1997-03-20

Family

ID=20162548

Family Applications (1)

Application Number Title Priority Date Filing Date
RU94041858A RU2075572C1 (en) 1994-11-22 1994-11-22 Method of forming isolation curtain around mine workings

Country Status (1)

Country Link
RU (1) RU2075572C1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208579A (en) * 2018-08-28 2019-01-15 北京瑞威世纪铁道工程有限公司 The horizontal sleeve valve barrel grouting construction method of boundling multistage
CN114658485A (en) * 2022-03-02 2022-06-24 中煤科工集团西安研究院有限公司 Composite disaster treatment method for water damage and rock burst of thick and hard sandstone roof of coal mine
CN115341902A (en) * 2022-08-17 2022-11-15 中煤科工西安研究院(集团)有限公司 Water-retaining coal mining method for lateral closed curtain of surrounding rock of coal mine working face

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208579A (en) * 2018-08-28 2019-01-15 北京瑞威世纪铁道工程有限公司 The horizontal sleeve valve barrel grouting construction method of boundling multistage
CN114658485A (en) * 2022-03-02 2022-06-24 中煤科工集团西安研究院有限公司 Composite disaster treatment method for water damage and rock burst of thick and hard sandstone roof of coal mine
CN114658485B (en) * 2022-03-02 2023-05-16 中煤科工集团西安研究院有限公司 Composite disaster treatment method for water damage and rock burst of thick and hard sandstone roof of coal mine
CN115341902A (en) * 2022-08-17 2022-11-15 中煤科工西安研究院(集团)有限公司 Water-retaining coal mining method for lateral closed curtain of surrounding rock of coal mine working face
CN115341902B (en) * 2022-08-17 2023-06-13 中煤科工西安研究院(集团)有限公司 Coal mine working face surrounding rock lateral closed curtain water-retaining coal mining method

Also Published As

Publication number Publication date
RU2075572C1 (en) 1997-03-20

Similar Documents

Publication Publication Date Title
CN117988845A (en) Grouting modification and reinforcement method for zone of soft rock breaking zone of underground coal mine
RU94041858A (en) Method for forming isolating curtain around mine working
CN108708722A (en) A method of being used for the efficient prevention bump of low air permeability coal seam
SU666276A1 (en) Mine drainage method
CN111119978B (en) Method for extracting coal seam gas by drilling holes in bedding and hydraulically cutting seams
SU1555422A1 (en) Method of constructing water outlet tunnel
RU2076923C1 (en) Method of formation of flagging screen in water-encroached rocks
SU1206431A1 (en) Method of isolating bottom water in oil well
SU1490285A1 (en) Method of producing counter-seepage curtain inwertical mine working
RU92008484A (en) METHOD OF CONTROL QUALITY INSULATION CURTAIN
SU1401142A1 (en) Method of eliminating sudden surges of water to working face of a working being driven
SU1479655A1 (en) Method of water insulation of vertical shafts
RU97111355A (en) METHOD FOR GAS DISCHARGE MANAGEMENT FROM THE EXTENDED SPACE
SU983269A1 (en) Method of lowering water level in open mines
RU2037012C1 (en) Method of discharging water in the process of draining rock massif
SU1439249A1 (en) Method of protecting and supporting mine working in water-bearing rocks
SU1550157A1 (en) Tunnel construction method
RU2077655C1 (en) Method for grouting boreholes
RU2054121C1 (en) Method for degassing of gas-saturated media
SU1643718A1 (en) Method for controlling hard-to-collapse roof
SU1627669A1 (en) Well construction method
SU1680874A1 (en) Method for construction of drainage system
SU1432195A1 (en) Method of finishing shallow wells with weak-cemented collector rock
SU1535999A1 (en) Method of plugging a hole
SU1661449A1 (en) Method for lowering shock hazard of contour part of mine working